Stormwater erosion - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Stormwater erosion? On this page you'll find 151 study documents about Stormwater erosion.

Page 3 out of 151 results

Sort by

TEST FROM BIGSWPPP Questions & answers 100% Correct!
  • TEST FROM BIGSWPPP Questions & answers 100% Correct!

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • Motives for staying in compliance with stormwater objectives include: A. Staying out of trouble with the law B. Appeasing environmental groups C. Making your boss happy D. None of these answers - ANSWERSA NPDES stands for: A. National Pollution Division of Environmental Science B. Non Pollution Discharge Elimination Standards C. National Pollution Development Erosion Standards D. National Pollutant Discharge Elimination System - ANSWERSD The law that set into place stormwater r...
    (0)
  • $14.49
  • + learn more
CISEC abbreviations Questions with complete solution 2024
  • CISEC abbreviations Questions with complete solution 2024

  • Exam (elaborations) • 16 pages • 2024
  • CISEC abbreviations Questions with complete solution 2024EPA Environmental Protection Agency S&EC Drawings Sediment and Erosion Control Drawings Brainpower Read More CWA Clean Water Act NPDES National Pollutant Discharge Elimination System BMPs Best Management Practices SW Stormwater
    (0)
  • $12.99
  • + learn more
SWM Participant Guide Questions with Answers Top Graded 2024
  • SWM Participant Guide Questions with Answers Top Graded 2024

  • Exam (elaborations) • 12 pages • 2024
  • Who authorizes the Virginia Stormwater Management Program? - Virginia Stormwater Act Who is Responsible for providing technical assistance, training and certification, research, and coordination in stormwater management technology to VSMP authorities. - DEQ The Virginia Stormwater Management program is administered through what? - Virginia Stormwater Management Program Regulation. The Virginia Stormwater Management Act requires the ______________ to permit, regulate, and control Stormwa...
    (0)
  • $11.49
  • + learn more
Cesswi 2 Study Questions With Complete Solutions.
  • Cesswi 2 Study Questions With Complete Solutions.

  • Exam (elaborations) • 12 pages • 2023
  • Temporary stabilization correct answer: stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 5 types of plans correct answer: 1. SWPPP 2. erosion and sed. plan (ESCP) 3. drainage plan/grading plan 4. spill prevention control and countermeasure plan (SPCC) 5. MS4 stormwater management plan/program (SWMP) SWPPP correct answer: -required by NPDES for industrial, multi sector, and construction gen...
    (0)
  • $12.99
  • + learn more
The Florida Stormwater, Erosion, and Sedimentation Control Inspector Course Exam (Questions and Answers)
  • The Florida Stormwater, Erosion, and Sedimentation Control Inspector Course Exam (Questions and Answers)

  • Exam (elaborations) • 2 pages • 2024
  • _________ is the process by which the land surface is worn away by the action of wind, water, and gravity - Answer-Erosion _________ is the settling out of soil particles transported by water and wind - Answer-Sedimentation Soil erosion can be classified as either _______ erosion or _______ erosion - Answer-Wind Water Water erosion can be classified as either _________ erosion or _________ and channel erosion - Answer-Overland Stream The four processes of overland erosion are: - Answer-S...
    (0)
  • $7.99
  • + learn more
Cesswi 2|88 Questions with 100% Correct Answers | Verified | Latest Update And Verified
  • Cesswi 2|88 Questions with 100% Correct Answers | Verified | Latest Update And Verified

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • Temporary stabilization - ️️stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 5 types of plans - ️️1. SWPPP 2. erosion and sed. plan (ESCP) 3. drainage plan/grading plan 4. spill prevention control and countermeasure plan (SPCC) 5. MS4 stormwater management plan/program (SWMP) SWPPP - ️️-required by NPDES for industrial, multi sector, and construction general permits -addresses op...
    (0)
  • $7.99
  • + learn more
CESSWI QUESTIONS AND ANSWERS SCORED A+
  • CESSWI QUESTIONS AND ANSWERS SCORED A+

  • Exam (elaborations) • 27 pages • 2023
  • CESSWI QUESTIONS AND ANSWERS SCORED A+ Erosion process in which, by the actions of wind and/or water, soil particles detached and transported Sediment eroded material suspended in wind or water Sedimentation deposition of eroded material Types of Erosion splash sheet rill gully channel Splash erosion raindrop impact energy is enough to dislodge surface sediments sheet erosion caused by rain splash detaching soil particles lifting them up and removing...
    (0)
  • $19.99
  • + learn more
CESSWI Certification - PART 1 Questions and Answers 2023
  • CESSWI Certification - PART 1 Questions and Answers 2023

  • Exam (elaborations) • 29 pages • 2023
  • CESSWI Certification - PART 1 Questions and Answers 2023 CESSWI Certification Identifies Professional with a comprehensive knowledge and understanding of erosion, sediment and stormwater regulations. Certified inspectors Recognized by state and federal regulators as qualified professionals in their fields NPDES National Pollutant Discharge Elimination System Regulations Governing Erosion and Sediment Control and Stormwater The Clean Water Act (CWA) National Pollutant D...
    (0)
  • $19.99
  • + learn more
WALMART - STORMWATER EXAM 2024 WITH 100% CORRECT ANSWERS
  • WALMART - STORMWATER EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 3 pages • 2024
  • WALMART - STORMWATER EXAM 2024 WITH 100% CORRECT ANSWERS The 1970's law that set into place the regulation of stormwater is: - correct answer The Clean Water Act Requirements for managing stormwater activity on a construction site are outlined in the following regulation: - correct answer NPDES Which of the following is never an allowable stormwater discharge from a construction site? - correct answer Discharge from contaminated groundwater The Notice of termination can filed when: ...
    (0)
  • $14.49
  • + learn more
CESSWI Exam Questions And Answers
  • CESSWI Exam Questions And Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • CESSWI Exam Questions And Answers Temporary stabilization - ANS stone or plastic as a BMP to reduce erosion by stabilizing areas that will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 5 types of plans - ANS 1. SWPPP 2. erosion and sed. plan (ESCP) 3. drainage plan/grading plan 4. spill prevention control and countermeasure plan (SPCC) 5. MS4 stormwater management plan/program (SWMP) SWPPP - ANS -required by NPDES for industrial, multi sector, and ...
    (0)
  • $10.49
  • + learn more