The aia - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about The aia? On this page you'll find 411 study documents about The aia.
Page 3 out of 411 results
Sort by
![FLORIDA CONTRACTORS exam questions and answers with solutions 2025](/docpics/6970009/6780d69663f4c_6970009_121_171.jpeg)
-
FLORIDA CONTRACTORS exam questions and answers with solutions 2025
- Exam (elaborations) • 12 pages • 2025
- Available in package deal
-
Performance
-
- $13.99
- + learn more
According to the AIA, what is the warranty that a contractor shall provide for his workmanship? - ANSWER One year 
 
According to AIA A201, within how many days must the contractor notify the architect after they notice a hidden condition that varies material from what was specified in the contract documents? - ANSWER 14 days 
 
After contract negotiations concluded between the owner and architect, the architect performs the required site inspections and presents bill for $750 for his services. ...
![ARE 5.0 Project Management exam 2024 with 100% correct answers](/docpics/4248710/65a704628cb8e_4248710_121_171.jpeg)
-
ARE 5.0 Project Management exam 2024 with 100% correct answers
- Exam (elaborations) • 31 pages • 2024
-
YANCHY
-
- $16.49
- + learn more
Out of the following insurances which is not required by the architect to maintain by the owner architect agreement? 
 
General liability, automobile liability, workers compensation, general commercial liability - correct answer General commercial liability insurance is not required per AIA B101, but it is preferred 
 
Name 4 items that are effective organizational tools for a project manager at the beginning of a project; - correct answer - Project description 
- Internal project budget 
-...
![CDS Practice Questions and Answers 100% Pass](/docpics/6871642/676839703d58b_6871642_121_171.jpeg)
-
CDS Practice Questions and Answers 100% Pass
- Exam (elaborations) • 38 pages • 2024
-
KatelynWhitman
-
- $13.49
- + learn more
CDS Practice Questions and Answers 
100% Pass 
When estimating operating costs of alt. designs or systems for project, which of the following factors 
affect estimates? Check all that Apply: 
A. Site location and orientation 
B. Management policies of owner/tenant 
C. Energy Costs 
D. Quality of maintenance staff 
E. Number of occupants - ALL. 
If maintenance staff is experienced and does not defer maintenance, equip will operate better, and 
Management policies concerning conservation affects d...
ARE 5.0 Project Management Questions and Answers 5.0 PjM Exam 2023 solved completely
![CDT Exam questions With Correct Answers 100% Solved](/docpics/4759251/65f5a6d7e1cce_4759251_121_171.jpeg)
-
CDT Exam questions With Correct Answers 100% Solved
- Exam (elaborations) • 66 pages • 2024
-
Brainbarter
-
- $15.49
- + learn more
CDT Exam questions With Correct 
Answers 100% Solved 
Select the entity which is generally assigned the following duties and responsibilities by the 
Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA 
A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
![CNST 2341 fInal Questions With 100% Correct Answers!!](/docpics/5705398/667924bcafab4_5705398_121_171.jpeg)
-
CNST 2341 fInal Questions With 100% Correct Answers!!
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
ACADEMICMATERIALS
-
- $7.99
- + learn more
`serve as one point of responsibility to who? - the owner 
`The 3 method of payment are ? - 1. Lump Sum 
2. Unit price 
3. Cost Plus 
`total float or simply "float" is also referred to as a what - "slack" 
`With OCIPs and CCIPs the disadvantages of the programs includes what? - increased 
administration burden by the owner or contractor 
`With Sole Proprietorship type of business entity, any debt that exceeds the company's assets must 
what? - Be paid for with private the owner. 
A certifi...
![ARE 5.0 - PJM - Project Quality Control Exam Questions and Correct Answers](/docpics/7237772/67ac17dbdf291_7237772_121_171.jpeg)
-
ARE 5.0 - PJM - Project Quality Control Exam Questions and Correct Answers
- Exam (elaborations) • 20 pages • 2025
-
JOSHCLAY
-
- $11.99
- + learn more
ARE 5.0 - PJM - Project Quality Control 
Exam Questions and Correct Answers 
What scientific aspects of building can be professionalized, bc they can be 
taught, tested, and objectively evaluated - Sanitation 
Safety 
Durability 
Unlike the NCARB member reg board, e of which is part of a state or other 
gvmnt entity, the AIA is - A non governmental organization 
Limitations imposed by antitrust law on thr AIA - Antitrust law imposes 
significant restrictions on what conduct the AIA can mandat...
![FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS WITH 100% CORRECT ANSWERS WITH RATIONALES 2025 GRADED A+](/docpics/7108049/6797e222d7774_7108049_121_171.jpeg)
-
FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS WITH 100% CORRECT ANSWERS WITH RATIONALES 2025 GRADED A+
- Exam (elaborations) • 183 pages • 2025
-
STUDYROOM2024
-
- $18.49
- + learn more
FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS WITH 100% CORRECT ANSWERS WITH RATIONALES 2025 GRADED A+. 
 
 
 
Which of the following is NOT a cause for the Owner to terminate the Contract? 
1- The Contractor experiences delays due to a Stop Work order through an act of government 
2- The Contractor fails to make payment to Subcontractors for labor 
3- The Contractor is guilty of substantial breach of a provision of the Contract Documents 
4- The Contractor repeatedly fails to sup...
![CDT Exam questions With Correct Answers 100% Solved](/docpics/4998687/661b8513d66ad_4998687_121_171.jpeg)
-
CDT Exam questions With Correct Answers 100% Solved
- Exam (elaborations) • 66 pages • 2024
- Available in package deal
-
Fyndlay
-
- $14.49
- + learn more
CDT Exam questions With Correct 
Answers 100% Solved 
Select the entity which is generally assigned the following duties and responsibilities by the 
Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA 
A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....
![CDT Exam questions and Answers 100% Correct](/docpics/5205637/6638a80b6f202_5205637_121_171.jpeg)
-
CDT Exam questions and Answers 100% Correct
- Exam (elaborations) • 53 pages • 2024
- Available in package deal
-
StudyCenter1
-
- $17.99
- + learn more
CDT Exam questions and Answers 100% 
Correct 
Select the entity which is generally assigned the following duties and responsibilities by 
the Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 
7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia