The aia - Study guides, Study notes & Summaries
Looking for the best study guides, study notes and summaries about The aia? On this page you'll find 425 study documents about The aia.
Page 3 out of 425 results
Sort by

-
FL BUSINESS AND FINANCE practice test questions and answers with solutions 2025
- Exam (elaborations) • 108 pages • 2025
- Available in package deal
-
Performance
-
- $12.99
- + learn more
The owner must prove financial capability no later than ________ days prior to the expiration of the time for withdrawal of bids. A. 3 B. 5 C.7 D.30 - ANSWER Answer: C. 7 - AIA 701.6.2 
 
How many copies of the plans and specifications shall the contractor maintain on site? A. 1 B. 2 C. 3 D. 4 - ANSWER Answer: A. 1 - AIA201 2.3.6 
 
Contracts entered into by unlicensed contractors ________________. A. are immoral B.are illegal C. are enforceable D. are unenforceable - ANSWER Answer: D. are unenf...

-
FLORIDA CONTRACTORS exam questions and answers with solutions 2025
- Exam (elaborations) • 12 pages • 2025
- Available in package deal
-
Performance
-
- $13.99
- + learn more
According to the AIA, what is the warranty that a contractor shall provide for his workmanship? - ANSWER One year 
 
According to AIA A201, within how many days must the contractor notify the architect after they notice a hidden condition that varies material from what was specified in the contract documents? - ANSWER 14 days 
 
After contract negotiations concluded between the owner and architect, the architect performs the required site inspections and presents bill for $750 for his services. ...

-
CDT Exam 2018 Prep Questions & Answers 2024/2025
- Exam (elaborations) • 33 pages • 2024
- Available in package deal
-
Bensuda
-
- $10.99
- + learn more
CDT Exam 2018 Prep Questions & Answers 2024/2025 
 
 
If the contractor is delayed in the progress of the Work by Owner, he should: 
a. Write Architect/Engineer protesting the changes 
b. Notify his bonding company 
c. Write the Architect/Engineer requesting a change order granting an extension of time 
d. Stop the Work until Owner makes up his mind. 
 
Review: AIA A201 8.3 , EJCDC C-700 Article 12 - ANSWERSc. Write the Architect/Engineer requesting a change order granting an extension of time...

-
CDS Practice Questions and Answers 100% Pass
- Exam (elaborations) • 38 pages • 2024
-
KatelynWhitman
-
- $13.49
- + learn more
CDS Practice Questions and Answers 
100% Pass 
When estimating operating costs of alt. designs or systems for project, which of the following factors 
affect estimates? Check all that Apply: 
A. Site location and orientation 
B. Management policies of owner/tenant 
C. Energy Costs 
D. Quality of maintenance staff 
E. Number of occupants - ALL. 
If maintenance staff is experienced and does not defer maintenance, equip will operate better, and 
Management policies concerning conservation affects d...

-
ARE 5.0 - PJM - Project Quality Control Exam Questions and Correct Answers
- Exam (elaborations) • 20 pages • 2025
- Available in package deal
-
JOSHCLAY
-
- $11.99
- + learn more
ARE 5.0 - PJM - Project Quality Control 
Exam Questions and Correct Answers 
What scientific aspects of building can be professionalized, bc they can be 
taught, tested, and objectively evaluated - Sanitation 
Safety 
Durability 
Unlike the NCARB member reg board, e of which is part of a state or other 
gvmnt entity, the AIA is - A non governmental organization 
Limitations imposed by antitrust law on thr AIA - Antitrust law imposes 
significant restrictions on what conduct the AIA can mandat...

-
CDT Test Questions 2024 Graded A+
- Exam (elaborations) • 33 pages • 2024
- Available in package deal
-
Bensuda
-
- $10.99
- + learn more
CDT Test Questions 2024 Graded A+ 
 
 
1. What establishes the relationship between the Contractor and the Architect/Engineer (A/E)? 
 
A - National laws 
B - Signed agreements 
C - Third-party obligations 
D - Special conditions - ANSWERSAnswer: C - Third-party obligations. The Contractor and the A/E do not have any signed agreements, the general terms and conditions of their respective contracts with the Owner provide them with third party obligations to each other. 
 
Reference: See PDPG Sect...

-
FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS WITH 100% CORRECT ANSWERS WITH RATIONALES 2025 GRADED A+
- Exam (elaborations) • 183 pages • 2025
-
STUDYROOM2024
-
- $18.49
- + learn more
FLORIDA CONTRACTOR'S MANUAL ACTUAL EXAM V1 250+ QUESTIONS WITH 100% CORRECT ANSWERS WITH RATIONALES 2025 GRADED A+. 
 
 
 
Which of the following is NOT a cause for the Owner to terminate the Contract? 
1- The Contractor experiences delays due to a Stop Work order through an act of government 
2- The Contractor fails to make payment to Subcontractors for labor 
3- The Contractor is guilty of substantial breach of a provision of the Contract Documents 
4- The Contractor repeatedly fails to sup...

-
CDT Exam questions With Correct Answers 100% Solved
- Exam (elaborations) • 66 pages • 2024
- Available in package deal
-
TheStar
-
- $15.49
- + learn more
CDT Exam questions With Correct 
Answers 100% Solved 
Select the entity which is generally assigned the following duties and responsibilities by the 
Conditions of the Contract: Protection of job site workers and stored materials. 
A - Architect/Engineer 
B - Owner 
C - Contractor 
D - Varies, as stated in the Supplementary Conditions 
E - None of the above 
Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA 
A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6....

-
CNST 2341 fInal Questions With 100% Correct Answers!!
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
ACADEMICMATERIALS
-
- $7.99
- + learn more
`serve as one point of responsibility to who? - the owner 
`The 3 method of payment are ? - 1. Lump Sum 
2. Unit price 
3. Cost Plus 
`total float or simply "float" is also referred to as a what - "slack" 
`With OCIPs and CCIPs the disadvantages of the programs includes what? - increased 
administration burden by the owner or contractor 
`With Sole Proprietorship type of business entity, any debt that exceeds the company's assets must 
what? - Be paid for with private the owner. 
A certifi...

-
ARE 5.0 Project Management exam 2024 with 100% correct answers
- Exam (elaborations) • 31 pages • 2024
-
YANCHY
-
- $16.49
- + learn more
Out of the following insurances which is not required by the architect to maintain by the owner architect agreement? 
 
General liability, automobile liability, workers compensation, general commercial liability - correct answer General commercial liability insurance is not required per AIA B101, but it is preferred 
 
Name 4 items that are effective organizational tools for a project manager at the beginning of a project; - correct answer - Project description 
- Internal project budget 
-...

How did he do that? By selling his study notes on Stuvia. Try it yourself! Discover all about earning on Stuvia