Virginia hic exam 2025 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Virginia hic exam 2025? On this page you'll find 31 study documents about Virginia hic exam 2025.
Page 3 out of 31 results
Sort by
-
Virginia HIC Exam (Home Improvement Exam) 2025/2026 Questions With Complete Solutions.(ALL BUNDLED Here!!!)
- Package deal • 6 items • 2024
-
- $22.99
- + learn more
Virginia HIC Exam (Home Improvement Exam) 2025/2026 Questions With Complete Solutions.(ALL BUNDLED Here!!!)

-
Virginia HIC Exam Practice Questions and Answers (100% Pass)
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Virginia HIC Exam Practice Questions and Answers (100% Pass) 
The MOST specific information about the size and location of windows would be 
found in a - Answer️️ -Floor plan 
What direction does heat flow? - Answer️️ -Hot to cold 
What are batter boards - Answer️️ -stakes and ledger boards marking building 
lines 
What is the MAXIMUM distance between a ventilating opening in an under-floor 
space and each corner of the building? - Answer️️ -3 feet 
What is NOT required in exteri...
-
Virginia hic Exam Questions and Correct Solutions 2024
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $9.79
- + learn more
Virginia hic Exam Questions and Solutions 
The MOST specific information about the size and location of windows would be found in a - Answer - 
Floor plan 
What direction does heat flow? - Answer -Hot to cold 
What are batter boards - Answer -stakes and ledger boards marking building lines 
What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner 
of the building? - Answer -3 feet 
What is NOT required in exterior nonbearing walls? - Answer -Load-bearing...
-
Virginia HIC Exam Questions with correct Answers Latest Updated 2024/2025 | 100% Solved
- Exam (elaborations) • 6 pages • 2024
-
- $14.99
- + learn more
The MINIMUN length drywall screw for installing 1/2 inch gypsum board to wood studs 
is - Answer- 1 1/4 inches 
What is the MINIMUM breaking strength required of safety belt lanyards - Answer5,400 pounds 
What is the MINIMUM clearance that combustible insulation MUST other heatproducing devices - Answer- 1 inch 
What is the MAXIMUM flame spread index for insulation materials - Answer- 25 
The amount of water per sack of cement is what controls all EXCEPT - Answer- Wear 
resistance 
The escape de...
-
HIC virginia 2024 Exam Questions And Correct Answers New Update (Verified and Updated)
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Fear of missing out? Then don’t!
-
virginia hic practice exam questions and answers (100% pass)
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
virginia hic practice exam questions and answers (100% pass) 
The MINIMUN length drywall screw for installing 1/2 inch gypsum board to wood 
studs is - Answer️️ -1 1/4 inches 
What is the MINIMUM breaking strength required of safety belt lanyards - 
Answer️️ -5,400 pounds 
What is the MINIMUM clearance that combustible insulation MUST other heat- 
producing devices - Answer️️ -1 inch 
What is the MAXIMUM flame spread index for insulation materials - Answer️️ - 
25 
The amount of ...
-
Virginia HIC Exam Study Guide with Complete Solutions
- Exam (elaborations) • 10 pages • 2024
-
- $9.99
- + learn more
Virginia HIC Exam Study Guide with 
Complete Solutions 
The MOST specific information about the size and location of windows would be found in a - Answer- 
Floor plan 
What direction does heat flow? - Answer-Hot to cold 
What are batter boards - Answer-stakes and ledger boards marking building lines 
What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner 
of the building? - Answer-3 feet 
What is NOT required in exterior nonbearing walls? - Answer-Load...
-
Virginia hic Exam Questions and Solutions
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Virginia hic Exam Questions and Solutions 
The MOST specific information about the size and location of windows would be found in a - Answer - 
Floor plan 
What direction does heat flow? - Answer -Hot to cold 
What are batter boards - Answer -stakes and ledger boards marking building lines 
What is the MAXIMUM distance between a ventilating opening in an under-floor space and each corner 
of the building? - Answer -3 feet 
What is NOT required in exterior nonbearing walls? - Answer -Load-bearing...
-
virginia hic Exam Questions and Answers |100% Pass
- Exam (elaborations) • 6 pages • 2024
-
- $9.99
- + learn more
virginia hic Exam Questions and 
Answers |100% Pass 
The MINIMUN length drywall screw for installing 1/2 inch gypsum board to wood studs is - Answer-1 
1/4 inches 
What is the MINIMUM breaking strength required of safety belt lanyards - Answer-5,400 pounds 
What is the MINIMUM clearance that combustible insulation MUST other heat-producing devices - 
Answer-1 inch 
What is the MAXIMUM flame spread index for insulation materials - Answer-25 
The amount of water per sack of cement is what controls...
-
HIC virginia Exam Practice Questions and Answers |100% Pass
- Exam (elaborations) • 6 pages • 2024
-
- $9.99
- + learn more
HIC virginia Exam Practice Questions 
and Answers |100% Pass 
What is directly affected by the surface and subsurface conditions of the building site? - Answer- 
Foundations - While the type and size of a structure will partly determine the type of foundation, the 
foundation itself is very much affected by the surface and subsurface conditions of the building site. 
What term is used to describe the act of removing air pockets from setting concrete? - Answer- 
Vibrating Concrete - Consolidation...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia