When hoisting personnel - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about When hoisting personnel? On this page you'll find 443 study documents about When hoisting personnel.

Page 3 out of 443 results

Sort by

NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 16 pages • 2023
  • NCCCO Core Practice Exam (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A Q: From which two points should the boom be measured? Answer: From the boom hinge pins to the center of the boom tip sheave Q: What is the preferred method of installing wire rope from a reel onto a hoist drum? Answer: The rope runs from the top of the reel to the top of the drum Q: Over which quadrant are truck crane capacities usually greater? Answer: Over the rear. ...
    (3)
  • $10.49
  • + learn more
NCCCO CORE INCLUDING TABLES – 176 QUESTIONS WITH VERIFIED SOLUTIONS 2024
  • NCCCO CORE INCLUDING TABLES – 176 QUESTIONS WITH VERIFIED SOLUTIONS 2024

  • Exam (elaborations) • 15 pages • 2023
  • Available in package deal
  • TT 345-750V 16ft TT TA 500-750V 35ft TA Brainpower Read More Previous Play Next Rewind 10 seconds Move forward 10 seconds Unmute 0:06 / 0:15 Full screen TT 50-345V 10ft TT TA 750-1000V 45ft TA TA 50-200V 15ft TA TA 350-500V 25ft TA TT 750-1000 20ft TT TT .01-.75 4ft TT TA 200-350V 20ft TA TA up to 50V 10ft TA TT .75-50V 6ft TT How many electrocution hazard warnings must be displayed 1 in cab 2 ...
    (1)
  • $15.49
  • + learn more
Mobile Cranes 3 Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version
  • Mobile Cranes 3 Questions & Answers | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • All slings for rigging they must have? - Sling identification While performing a shift inspection which one of these are required to be inspected as per OSHA 1926.1412 - Pins, bearings, and locking devices for significant wear. What is the signal person directing the crane operator to do? (Picture of man holding his arm straight out to his side, parallel to ground with his palm facing down). - Stop What does 4 x 12,920 equal? (no calculator) - 51,680 What is the signal person directing the...
    (0)
  • $10.49
  • + learn more
NCCCO MOBILE CRANE TESTS 2024 | 100% Correct Answers | Verified | Latest 2024 Version
  • NCCCO MOBILE CRANE TESTS 2024 | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • . What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - a. 3. The load line of the crane you're operating contacts an energized power line. T...
    (0)
  • $12.49
  • + learn more
NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A
  • NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? - ANSWER Boom up When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? - ANSWER 1% Th...
    (0)
  • $10.89
  • + learn more
NCCCO MOBILE CRANE Tests | 100% Correct Answers | Verified | Latest 2024 Version
  • NCCCO MOBILE CRANE Tests | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - a. 3. The load line of the crane you're operating contacts an energized power line. ...
    (0)
  • $12.49
  • + learn more
MA Hoisting 1B Latest Update with  Verified Solutions
  • MA Hoisting 1B Latest Update with Verified Solutions

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • MA Hoisting 1B Latest Update with Verified Solutions Hoisting Regulations CMR 520 CMR 6.00 et seq What use does CMR 6.01 Exclude Exclusive Agricultural Use Compact Hoisting Machine GVW less than 10k lbs, exclusing Class 1, Class 3, and Class 4. Temporary permist use shall not exceed GVW 8k lbs Hoisting Machine Higher than 10 feet AND loads greater than 500lbs OR the bucket capacity exceeds 1/4 cubic yards Qualified Welder certified by the America Welding Society or alternativ...
    (0)
  • $9.99
  • + learn more
NCCCO MOBILE CRANE EXAM 2024 QUESTIONS AND CORRECT DETAILED ANSWERS| BEST STUDY MATERIALS WITH VERIFIED ANSWERS
  • NCCCO MOBILE CRANE EXAM 2024 QUESTIONS AND CORRECT DETAILED ANSWERS| BEST STUDY MATERIALS WITH VERIFIED ANSWERS

  • Exam (elaborations) • 17 pages • 2024
  • NCCCO MOBILE CRANE EXAM 2024 QUESTIONS AND CORRECT DETAILED ANSWERS| BEST STUDY MATERIALS WITH VERIFIED ANSWERS 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom Correct Answer c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to...
    (0)
  • $19.99
  • + learn more
Core Study Guide Latest Update |  2024/2025 | Rated A+
  • Core Study Guide Latest Update | 2024/2025 | Rated A+

  • Exam (elaborations) • 20 pages • 2024
  • Core Study Guide Latest Update | 2024/2025 | Rated A+ 1926.1400 scope of cranes 1926.1423 Fall protection 1926.1431 Hoisting Personnel 29 CFR 1910.180 Cranes (General Industry) 29 CFR 1926.Subpart CC Cranes and Derricks (construction) A crane is at the point of instability when the crane's leverage on the load equals: 100% of the load's leverage on crane. A mobile crane's jib is offset 15 degrees versus its original 0 degree offset, but the boom angle remains unchang...
    (0)
  • $9.73
  • + learn more
API 1169 (2) Questions and Answers  Already Passed
  • API 1169 (2) Questions and Answers Already Passed

  • Exam (elaborations) • 19 pages • 2024
  • API 1169 (2) Questions and Answers Already Passed Except for eye splices in the ends of wires and for endless rope slings, each wire rope used in hoisting or lowering, or in pulling loads, shall consist of which of the following? One continuous piece without knot or splice Which of the following is a requirement of basic inspector knowledge when dealing with material preservation and handling? Quarantine, tagging, and identification. Part of quality management focused on fulfillin...
    (0)
  • $9.99
  • + learn more