12 strand rope - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about 12 strand rope? On this page you'll find 98 study documents about 12 strand rope.
Page 4 out of 98 results
Sort by
-
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (100% Correct & Graded)
- Exam (elaborations) • 11 pages • 2024
-
Available in package deal
-
- $15.49
- + learn more
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST UPDATED 2024/2025 (100% Correct & Graded) Which unsafe condition could result when a wedge socket is attached directly to a load hook, 
using 6x19 IWRC? 
(A) Spinning of the load (B) Decreased line pull (C) Decreased safe working load (D) Structural 
failure correct answers (A) Spinning of the load 
Which if the following will indicates intemal damage or ultimately core failure in rotationresistant rope? 
(A) Strand bird caging (B) Dianeter reduction (C...
-
NCCCO MOBILE CRANE TESTS | 100 Questions with 100% Correct Answers | Verified | Latest Update | 17 Pages
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NCCCO MOBILE CRANE TESTS | 100 
Questions with 100% Correct Answers | 
Verified | Latest Update | 17 Pages 
1. What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer ️️ -c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain ...
-
NCCCO OVERHEAD CRANE WITH VERIFIED SOLUTIONS 2024 LATEST UPDATE
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $12.99
- + learn more
Overhead cranes with more than one hoisting unit shall have? 
Its rated load marked on it. 
 
 
 
How often does O.S.H.A. require a written wire rope inspection? 
Once a month 
 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:12 
/ 
0:15 
Full screen 
What is the purpose of the "E" (Emergency) stop on an overhead crane? 
Removes power to entire crane. 
 
 
 
Most loads should be rigged to within how many degrees of level? 
5 
 
 
 
Acco...
-
NCCCO MOBILE CRANE Exam Questions And Answers 100% Pass.
- Exam (elaborations) • 15 pages • 2024
-
- $11.49
- + learn more
NCCCO MOBILE CRANE Exam Questions 
And Answers 100% Pass. 
1. What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - answerc. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% - answera. 
3. The load...
-
NCCCO MOBILE CRANE TESTS | 100 Questions with 100% Correct Answers | Verified | Latest Update | 17 Pages
- Exam (elaborations) • 17 pages • 2024
-
- $12.49
- + learn more
NCCCO MOBILE CRANE TESTS | 100 
Questions with 100% Correct Answers | 
Verified | Latest Update | 17 Pages 
1. What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer ️️ -c. 
2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain ...
Fear of missing out? Then don’t!
-
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% Correct)
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO PT EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% Correct) Which if the following will indicates intemal damage or ultimately core failure in rotationresistant rope? 
(A) Strand bird caging (B) Dianeter reduction (C) Excessive lubrication (D) Kinking correct 
answers (B) Dianeter reduction 
When a jib is erected from the stowed position and not used, how will its effective weight 
change? 
(A) It decreases (B) It increases (C) It will tip the crane (D) It stays the same correct answers...
-
NS101 Final Exam 2022, All correct Answers
- Exam (elaborations) • 8 pages • 2024
-
- $11.98
- + learn more
NS101 Final Exam 2022, All correct Answers 
 
How would you create a rope? 
Fiber, yarn, strand, rope 
Dead Reckoning 
Distance=Speed*Time 
A boat is traveling at 12 knots for 2.4 hours, how far has the boat gone? 
28.8 
A boat has traveled for 3.6 hours and has made a course of 84 miles, how fast is the boat going? 
23.3 
What are the 3 natural types of ropes? 
Manila, 
Hemp, 
Cotton 
which is the most common type of natural rope? 
Manila 
Which is the strongest synthetic rope and how far can ...
-
NCCCO Rigger 1 Study Questions (with Accurate Solutions)
- Exam (elaborations) • 4 pages • 2023
-
Available in package deal
-
- $9.09
- + learn more
1. A wire rope that is a 6x19 classification could have how many wires per strand? correct answers 15 through 26 wires per strand 
 
2. How often should a synthetic web sling be inspected? correct answers Each day before use 
 
3. Which considerations should be given to suspend lifting operations with a mobile crane? correct answers Winds in excess of 35 mph 
 
4. What is the term that best describes surface wear on a wire rope sling to rubbing or sliding? correct answers Abrasion 
 
5. Which of...
-
NASCLA Accredited Exam - JJ Johnson Contractor Seminar
- Exam (elaborations) • 33 pages • 2024
-
- $13.00
- + learn more
What are 4 types of Steel Decking? - Composite, Roof, Cellular, and Form 
What are the lengths of Full sheets of Steel Decking? - 12", 18", 24", 30", or 36". 
All are usually less than 40" 
Who has full responsibility for Safety on a construction site? - The prime 
contractor 
Who is responsible to ensure workers have appropriate eye protection? - The 
employer 
Safety belt lanyard shall be a minimum of? - 1/2 inch nylon, w/ max length to 
provide for a fall of no greater than ...
-
NCCCO tower exam 2024 updated Q&A
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
NCCCO tower exam 2024 updated Q&A 
When tower crane is erected/dismantled, written instructions must be - CORRECT 
ANSWER-On site 
Tower crane erection/dismantling shall be performed under direct supervision of the - 
CORRECT ANSWER-Designated person 
What is the minimum clearance from obstruction when the tower crane freely rotates 
360•? - CORRECT ANSWER-6 ft 6 in 
What must the crane operator do when a load is suspended - CORRECT ANSWERRemain at the controls 
How often should the hoist r...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia