Aci concr - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Aci concr? On this page you'll find 1182 study documents about Aci concr.
Page 4 out of 1.182 results
Sort by
-
ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 43 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
ACI Concrete Field-Testing Technician - 
Grade 1 Exam Review | 100% Correct 
Answers | Verified | Latest 2024 Version
-
ACI Concrete Strength Technician Questions and Answers Already Passed
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
ACI Concrete Strength Technician 
Questions and Answers Already Passed 
 
What is ASTM C1231? Standard Practice for use of Unbonded Caps in determination of 
compressive strength of hardened cylindrical concrete specimens 
 
(C1231) The height (cavity) of the metal retaining ring must be (25 +/- 3mm) 
 
(C1231) If the retaining ring is greater than 4in (100mm) it must be at least __ thick. If it is less 
than 4in, it must be at least __ thick. .47 in (12mm) and .35in (9mm) 
 
(C1231) Bearing sur...
-
ACI Concrete end of Chapter Questions (Answers)
- Exam (elaborations) • 19 pages • 2024
-
- $13.99
- + learn more
ACI Concrete end of Chapter Questions (Answers)
-
ACI Concrete Strength Testing Technician CP-19 Questions with Complete solutions
- Exam (elaborations) • 14 pages • 2024
-
- $12.99
- + learn more
ACI Concrete Strength Testing Technician CP-19 Questions with Complete solutions
-
ACI Concrete Exam Questions And Answers Graded A+
- Exam (elaborations) • 15 pages • 2024
-
- $10.69
- + learn more
ACI Concrete Exam Questions And Answers Graded A+ 
What must be done if the concrete drops below the top of the Slump mold while the top layer is being rodded? 
Add additional concrete to keep an excess of concrete above the top of the mold at all times 
 
 
Rod each layer ___ times uniformly over the cross section with the rounded end of the rod. 
25 
 
 
The slump mold is filled in _____ layers. 
3 layers 
 
 
True or false the slump mold should be in a dry condition before beginning the test?...
Fear of missing out? Then don’t!
-
ACI Concrete Questions with Complete Solutions
- Exam (elaborations) • 18 pages • 2024
-
- $15.49
- + learn more
ACI Concrete Questions with Complete Solutions
-
ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 43 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. 
A. True 
B. False - B. False 
ASTM C172 -Para (4.1.2) - Start molding. 
specimens for strength tests within 15 min after fabricating the 
composite sample. 
Q2. The maximum allowable time between obtaining the first and last portions of the composite sample 
may not exceed 5 minutes. 
A. True 
B. False - B. False 
ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obta...
-
ACI Concrete Field Testing Technician- Grade I study guide
- Exam (elaborations) • 11 pages • 2024
-
- $8.99
- + learn more
ACI Concrete Field Testing Technician- Grade I study guide 
The sensor of the temperature measuring device shall be submerged a minimum of	in. [	mm] into the freshly mixed concrete. - 3 in. [75 mm]
-
ACI Concrete Bundled Exams with complete solution
- Package deal • 17 items • 2024
-
- $18.39
- + learn more
ACI Concrete Bundled Exams with complete solution
-
ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE I
- Exam (elaborations) • 11 pages • 2024
-
- $12.49
- + learn more
ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE I
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia