Aia document - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aia document? On this page you'll find 173 study documents about Aia document.

Page 4 out of 173 results

Sort by

AC Exam #5 - Construction Doc with complete verified solutions
  • AC Exam #5 - Construction Doc with complete verified solutions

  • Exam (elaborations) • 22 pages • 2024
  • Pre-qualification The ________________________ process results in a select bidders list, or short list, which identifies firms that have demonstrated to the owner that they have the necessary abilities to perform the required work. General Conditions Often referred to as the boiler plate, the _____________________ augment the construction contract (agreement) and outline the rules under which the project will be built by establishing the rights, authority, and obligations of the contrac...
    (0)
  • $15.99
  • + learn more
SOC1502 MCQ EXAM PACK 2024 SOC1502 MCQ EXAM PACK 2024
  • SOC1502 MCQ EXAM PACK 2024

  • Exam (elaborations) • 136 pages • 2023
  • SOC1502 EXAM PACK $0C1502 MAY/JUNE 2019 QUESTION 1 Which of the following statements correctly describe how human beings became differentiated? @m@ = Epidemics played a role in shaping the genetic inheritance of population groups 2 Darker skin protected against skin cancer in areas where there was little sunshine 3 There was extensive inbreeding between early humans and modern human beings 4 The period from the rise of the first humans to the present was too short for any g...
    (1)
  • $2.70
  • 1x sold
  • + learn more
CMGT 360 Final (Exam 3) Questions And Answers Well Elaborated/2024.
  • CMGT 360 Final (Exam 3) Questions And Answers Well Elaborated/2024.

  • Exam (elaborations) • 25 pages • 2024
  • Design-Build - correct answer a method of project delivery in which one entity (design-builder) forges a single contract with the Owner to provide for architectural engineering design services and construction services Design-Build Entity Configurations - correct answer • Contractor Led • A/E Led • Integrated Firm • Developer Led • Joint Venture Competitive Solicitation & Basis ...
    (0)
  • $14.99
  • + learn more
CDT Exam Questions With Correct Answers 100% Solved
  • CDT Exam Questions With Correct Answers 100% Solved

  • Exam (elaborations) • 42 pages • 2024
  • CDT Exam Questions With Correct Answers 100% Solved Which of these documents, might we find in the Project Manual but they are not contract documents? (A) The Agreement (B) Procurement Documents (C) Addendum (D) Supplemental Conditions - answerAnswer: B Reference: PDPG 11.1.6 Explanation: Procurement requirements are addressed to prospective bidders or proposers interested in the project. Although not necessarily part of a contract, the procurement requirements are usually bound wit...
    (0)
  • $14.49
  • + learn more
ARE 5.0 Practice Management Practice Exam  Questions With 100% Correct Answers.
  • ARE 5.0 Practice Management Practice Exam Questions With 100% Correct Answers.

  • Exam (elaborations) • 8 pages • 2024
  • What are the four reasons an architect should consider professional liability insurance? - Answer-1. Social Responsibility, 2. Continuing Operations, 3. Contract Requirements, 4. Business Survival During the building of a pre-school and day care facility, the general contractor ran over the allotted schedule which interrupted the client's intention to be up and running before the beginning of the school year. The contractor is claiming that the delays are due to weather. Where should the a...
    (0)
  • $8.39
  • + learn more
CDT Exam Prep | 100% Correct Answers | Verified | Latest 2024 Version
  • CDT Exam Prep | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 17 pages • 2024
  • Which of these documents, might we find in the Project Manual but they are not contract documents? A. The Agreement B. Procurement Requirements C. Addendum D. Supplemental Conditions - B Before a model building code can become the building code for a jurisdiction, it has to be adopted by? A. Authority Having Jurisdiction B. State Government C. Building Inspector D. International Organization for Standardization - A The Construction Manager is hired by this entity? A. General Contracto...
    (0)
  • $10.49
  • + learn more
IDPX - Practice Test #1
  • IDPX - Practice Test #1

  • Exam (elaborations) • 17 pages • 2023
  • Application for permit - Answer- What is the first step in the permit process? B. Specifying blueprint matched veneer wall panels instead of sequence matched. - Answer- All of the following are examples of value engineering except: A. Changing a spec from vinyl wallcovering to paint. B. Specifying blueprint matched veneer wall panels instead of sequence matched. C. Specifying vinyl upholstery instead of leather. D. Omitting custom booth seating and specifying stock tables and chairs...
    (0)
  • $12.49
  • + learn more
CMIT Questions and Answers Latest (2022/2023) Rated A+
  • CMIT Questions and Answers Latest (2022/2023) Rated A+

  • Exam (elaborations) • 45 pages • 2023
  • CMIT Questions and Answers Latest (2022/2023) Rated A+ The contract documents for a project should be written primarily to protect the interest of the CM. False The owner, CM and Designer are less likely to be involved in disputes with the Contractor if a contract is awarded to the lowest bidder. False Use of standard forms of agreement will always result in fewer disputes? False After the owner accepts a cm's proposed GMP as contemplated by the CMAA CM at Risk Series documents, the res...
    (0)
  • $9.99
  • + learn more
CM 334 Final || A+ Verified Solutions.
  • CM 334 Final || A+ Verified Solutions.

  • Exam (elaborations) • 6 pages • 2024
  • Inchoate contract correct answers Partially completed or imperfectly formed contract enforceable contract elements correct answers verbal contracts correct answers are enforceable These groups have their own standard form construction contracts correct answers AGC, AIA, EJCDC construction contract can also be described as correct answers a relational contract Expectation Damages correct answers damage award includes the profit the contractor would have made had the contract been ...
    (0)
  • $10.49
  • + learn more
NCARB practice problems With all Answers correct!
  • NCARB practice problems With all Answers correct!

  • Exam (elaborations) • 12 pages • 2023
  • NCARB practice problems With all Answers correct! Which of the following methods of bidding is required on most projects for which government funds are to be used? Which of the following project delivery methods always requires preparation of several individual bid-document packages? diagram on paper In developing a list of bidders for a private project, the architect's role is to A contractor's ability to obtain a performance bond for a specific contract is determined by the A...
    (0)
  • $13.99
  • + learn more