All combustible materials - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about All combustible materials? On this page you'll find 1560 study documents about All combustible materials.
Page 4 out of 1.560 results
Sort by
-
Module 26111- Wiring Commercial and Residential fully solved graded A+
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $9.99
- 1x sold
- + learn more
Module 26111- Wiring Commercial and Residentiala green screw terminal on a device is to be used for the _____ wire 
a. grounding 
 
 
a device labeled CO/ALR can be used with ______ wire 
b. copper , aluminum, or copper-clad aluminum 
 
 
the UL label on a device means the device_____ 
d. has undergone testing it a nationally recognized lab and meets the minimum safety requirements 
 
 
in relation to switches, the term throw refers to the _______ 
c. number of internal operations that a switch ...
-
FDNYC G60 Practice Exam Answers Correct Updated Summer 22-23.
- Exam (elaborations) • 9 pages • 2023
-
- $10.19
- 1x sold
- + learn more
FDNYC G60 Practice Exam Answers Correct Updated Summer 22-23. 
 
All torch operators, an oxigen-fuel torch using any amount of oxigen and flamable gas and fire guards must have a current 
 
The Certificate of Fitness holder 
 
 
if the torch operator for jewelry manufacture involves 
 
A Certificate of Fitness Holder must keep his or her certificate 
 
The easiest way to extinguish a fire caused by a leak is to 
 
 
Permits issued by the FDNY are required to conduct the following hot work: 
 
Fo...
-
S-130 Module 2 (Watch Out & LCES) & 3 (Fire Shelter) Already Passed
- Exam (elaborations) • 12 pages • 2023
- Available in package deal
-
- $9.99
- 1x sold
- + learn more
S-130 Module 2 (Watch Out & LCES) & 3 (Fire Shelter) Already Passed What does LCES stand for? Lookouts Communications Escape Routes Safety Zones 
Most incidents happen on relatively small fires or on, (blank), sections of large fires Isolated sections 
Flare-ups generally occur in deceptively, (blank), fuels, such as grass, herbs, & light brush. Light Fuels 
Fires move especially, (blank), uphill in chimneys, drainages, and on steep slopes Uphill 
What are the 4 colored sections in the IRPG? 1. ...
-
G-44 Storage and Holding of LPG/CNG
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $7.99
- 1x sold
- + learn more
G-44 Storage and Holding of LPG/CNG 
 
 
Asphalt Melter: - ANS An approved device designed to heat asphalt, typically for waterproofing operations, that, utilizing a flammable gas or a combustible liquid, generates an enclosed flame that indirectly heats a vessel containing the asphalt. 
 
CNG: - ANS Compressed natural gas. 
 
Compressed Gas: - ANS A material, or mixture of materials, that is a gas at 68F or less at 14.7 psia of pressure; and has a boiling point of 68F or less 14.7 psia th...
-
Fire Investigator - master for TCFP Test: Fire Investigator -Master for TCFP Test Bank: Questions & Answers: Latest Updated
- Exam (elaborations) • 73 pages • 2023
- Available in package deal
-
- $11.50
- 1x sold
- + learn more
Is NFPA 921 a guide or a standard? 
 (Ans- It is the Guide for Fire and Explosion Investigations 
 
What are the six steps of the scientific method? 
(Ans- 
Recognize the need 
Define the problem 
Collect the data 
Analyze the data 
Develop a hypothesis 
Test the hypothesis 
 
What step of the scientific method is inductive reasoning? 
 (Ans- Analyze the data 
 
What step of the scientific method is deductive reasoning? 
 (Ans- Test the hypothesis 
 
What are the four parts of the fire tetrahe...
As you read this, a fellow student has made another $4.70
-
FDNY F-80 Fire Safety & Alarm Systems in Homeless Shelters Test (2023 Q&A)
- Other • 9 pages • 2023
-
- $10.49
- 2x sold
- + learn more
F-80 Coordinator of Fire Safety and Alarm Systems in Homeless Shelters Test. 
 
GOOD As the F-80 C of F holder, you notice a minor defect in the fire protection system and report it to the building owner. In the event the issue is still not corrected three months later, what would be the next step that you are required to take? 
 
GOOD Typical causes of fires in homeless shelters are considered which of the following? 
 
GOOD Shelter staff members shall be readily identifiable at all times whi...
-
NFPA 1031 - Fire Inspector 1 Questions with 100% Correct Solutions
- Exam (elaborations) • 23 pages • 2023
-
Available in package deal
-
- $13.99
- 1x sold
- + learn more
1. One of the best ways to stress the importance of inspections upon building owners is through : - A follow - up visit . 
 
2. In an inspection report , fire inspectors are generally concerned with presenting the facts and evidence to prove a point , draw a conclusion , or : - Justify a recommendation 
 
3. Which statement regarding inspection forms / checklists is true ? - They are very useful for inspecting common items and / or complex processes . 
 
4. During an inspection of a bui...
-
Asbestos Contractor/Supervisor Examination | Actual questions and answers | updated
- Exam (elaborations) • 5 pages • 2023
- Available in package deal
-
- $9.99
- 1x sold
- + learn more
Asbestos Contractor/Supervisor Examination | Actual questions and answers | updated 
 
Fibers - Asbestos is a generic name for a group of minerals that form __________ 
Hood, booties, coveralls - The following are parts of a protective clothing ensemble 
Removal of 5 feet of pipe insulation in order to fix a leak in the pipe - Which of the following operations would be considered to be an OSHA Class II job? 
Holes cut in the polyethylene next to the machines - Make-up air for a negative ...
-
NASCLA Accredited Exam - JJ Johnson Contractor Seminar 2023-2024 ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS
- Exam (elaborations) • 13 pages • 2024
-
- $11.49
- 1x sold
- + learn more
NASCLA Accredited Exam - JJ Johnson Contractor Seminar 
 ACTUAL EXAM QUESTIONS AND CORRECT 
DETAILED ANSWERS 
What are 4 types of Steel Decking? 
Composite, Roof, Cellular, and Form 
What are the lengths of Full sheets of Steel Decking? 
12", 18", 24", 30", or 36". All are usually less than 40" 
Who has full responsibility for Safety on a construction site? 
The prime contractor 
Who is responsible to ensure workers have appropriate eye protection? 
The employer 
Safety belt lanyard shall ...
-
P-99 / Low PSI Oil Burner Operator Questions With 100%Verified Answers A+GRADED
- Exam (elaborations) • 9 pages • 2024
-
- $8.99
- 1x sold
- + learn more
P-99 / Low PSI Oil Burner Operator Questions With 100%Verified Answers A+GRADED 
 
All heating, combustion, and cooking equipment shall be provided with insulation or the building construction shall be fire protected, so that during operation the surface of combustible construction materials will not be raised to a temperature higher than ____. - correct answer...170 ̊ F 
 
Acceptance tests: Boilers shall not be placed in operation upon completion of construction until they have been ____ and a...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia