Contracting approach - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Contracting approach? On this page you'll find 1907 study documents about Contracting approach.

Page 4 out of 1.907 results

Sort by

PVL3702 Assignment 2 (ANSWERS) Semester 1 2024 - DISTINCTION GUARANTEED
  • PVL3702 Assignment 2 (ANSWERS) Semester 1 2024 - DISTINCTION GUARANTEED

  • Exam (elaborations) • 97 pages • 2024
  • Well-structured PVL3702 Assignment 2 (ANSWERS) Semester 1 2024 - DISTINCTION GUARANTEED. (DETAILED ANSWERS - DISTINCTION GUARANTEED!). .... Question 1 Answer saved Marked out of 1.00 Flag question Question text Gary points a loaded gun at Pete, and orders him to sign a written contract. Gary explains that the document is for the sale of Pete’s car to him (Gary), at a price of R50 000 which is far below the market value of the car. Pete, fearing for his life, signs the document. Which cause of ...
    (0)
  • $2.85
  • 1x sold
  • + learn more
DBIA TEST QUESTIONS AND ANSWERS
  • DBIA TEST QUESTIONS AND ANSWERS

  • Exam (elaborations) • 10 pages • 2024
  • Project Delivery System - Answer-How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) Procurement Method - Answer-how team members are selected (QBS, best value, low price, sole source) contracting approach - Answer-how team members are paid (fp, gmp, cost reimbursement, target price, unit price) Design-Bid-Build (DBB) - Answer-linear, sequential process, A/E selecte...
    (0)
  • $12.49
  • + learn more
DBIA TEST EXAM 2024/2025 WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
  • DBIA TEST EXAM 2024/2025 WITH GUARANTEED ACCURATE ANSWERS |VERIFIED

  • Exam (elaborations) • 21 pages • 2024
  • Project Delivery System - ACCURATE ANSWERHow team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) Procurement Method - ACCURATE ANSWERhow team members are selected (QBS, best value, low price, sole source) Contracting approach - ACCURATE ANSWERhow team members are paid (fp, gmp, cost reimbursement, target price, unit price) Design-Bid-Build (DBB) - ACCURATE ANSWERlinear,...
    (0)
  • $13.99
  • + learn more
PVL3702 NOTES
  • PVL3702 NOTES

  • Summary • 126 pages • 2023
  • LAW OF CONTRACT NOTES: Contract as an agreement intended to create enforceable obligations A contract is an agreement between two or more parties. The extra ingredient that distinguishes contracts from non-binding agreements is a serious intention to create legally enforceable obligations (animus contrahendi). The absence of an animus contrahendi explains why ‘gentlemen’s agreements’ are not enforceable as contracts. Legally binding agreements that are not contracts: The ...
    (0)
  • $2.69
  • 2x sold
  • + learn more
Summary Corporate Ownership and Governance
  • Summary Corporate Ownership and Governance

  • Summary • 81 pages • 2022
  • Sources: Santos, F. & Eisenhardt, K., 2005. Organizational Boundaries and Theories of Organization, Organization Science, 16 (5) (you should be able to explain and apply alternative theories of (the) firm (boundaries) to existing cases. Ketokivi, M. & Mahoney, J.T. (2017) Transaction Cost Economics as a Theory of the Firm, Management, and Governance. Oxford Research Encyclopedia of Business and Management. Retrieved 28 Aug. 2019 (the focus should be on the general concepts and expl...
    (0)
  • $12.03
  • 6x sold
  • + learn more
Solutions for Project Management for Engineering, Business and Technology, 6th Edition Nicholas (All Chapters included)
  • Solutions for Project Management for Engineering, Business and Technology, 6th Edition Nicholas (All Chapters included)

  • Exam (elaborations) • 315 pages • 2024
  • Complete Solutions Manual for Project Management for Engineering, Business and Technology, 6th Edition by John M. Nicholas, Herman Steyn ; ISBN13: 9780367277345. (Full Chapters included Chapter 1 to 20)....1. What is Project Management? 2. Systems Approach. 3. Project Life Cycle and Project Conception 4. Project Definition and System Definition 5. Project Execution and Closeout. 6. Basic Project Planning Techniques 7. Project Schedule Planning and Networks 8. Advanced Project Network Analysis an...
    (0)
  • $29.49
  • + learn more
CCM EXAM STUDY GUIDE – HPM
  • CCM EXAM STUDY GUIDE – HPM

  • Exam (elaborations) • 66 pages • 2024
  • What Is a pre-solicitation notice? The pre-solicitation notice helps government agencies determine if there are qualified vendors to perform the work scope. It provides a "heads up" that the solicitation will be released and solicits capability responses from responsible vendors. The pre-solicitation notice also helps the government determine if the requirement can be set-aside for a small business if capable small businesses respond. The pre-solicitation notice is valuable to a contractor fo...
    (0)
  • $15.99
  • + learn more
Test Bank for Project Management for Engineering, Business and Technology, 6th Edition Nicholas (All Chapters included)
  • Test Bank for Project Management for Engineering, Business and Technology, 6th Edition Nicholas (All Chapters included)

  • Exam (elaborations) • 150 pages • 2024
  • Complete Test Bank for Project Management for Engineering, Business and Technology, 6th Edition by John M. Nicholas, Herman Steyn ; ISBN13: 9780367277345. (Full Chapters included Chapter 1 to 20)....1. What is Project Management? 2. Systems Approach. 3. Project Life Cycle and Project Conception 4. Project Definition and System Definition 5. Project Execution and Closeout. 6. Basic Project Planning Techniques 7. Project Schedule Planning and Networks 8. Advanced Project Network Analysis and Sched...
    (0)
  • $29.49
  • + learn more
DBIA Test  Questions And Answers With 100% Correct Answers
  • DBIA Test Questions And Answers With 100% Correct Answers

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • a subjective measure for evaluating a project that is hard to measure; this is determined through the design process, not after the project is completed - design value describes in terms of exactly how the product and/or its components must be built; cookbook approach; developed by the design builder but used by owners in the RFP/bridging documents for operability or maintenance needs and conditions of permits or third parties; examples: uniformat C10, partitions. "Install gypsum wallboard...
    (0)
  • $7.99
  • + learn more
DBIA Actual Test Questions And Answers With Verified Complete Solution.
  • DBIA Actual Test Questions And Answers With Verified Complete Solution.

  • Exam (elaborations) • 10 pages • 2024
  • DBIA Actual Test Questions And Answers With Verified Complete Solution. Project Delivery System - Correct Answer-How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) Procurement Method - Correct Answer-how team members are selected (QBS, best value, low price, sole source) contracting approach - Correct Answer-how team members are paid (fp, gmp, cost reimbursement, tar...
    (0)
  • $11.99
  • + learn more