Contral - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Contral? On this page you'll find 1172 study documents about Contral.

Page 4 out of 1.172 results

Sort by

VA Contractor General Questions and Answers
  • VA Contractor General Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • A contractor does not notify a change of address and so does not receive a timely Notice of Renewal. Who is responsible for when the contractor does not renew his license on time? - The Licensee Contractor A Designated Employee should be? - At least 18, Full Time, Passed Required Exams What is the initial Recovery Fund fee? - $25.00 If a contractor ears more that $_______ per year, then the contractor is required to have a Class A. - $750,000.00 If a contract awards more than $_________ p...
    (1)
  • $7.99
  • + learn more
MICHIGAN BUILDERS LICENSE EXAM (GENERAL CONTRACTOR) 2024-2025 ATUAL EXAM
  • MICHIGAN BUILDERS LICENSE EXAM (GENERAL CONTRACTOR) 2024-2025 ATUAL EXAM

  • Exam (elaborations) • 56 pages • 2024
  • IRC (International Residential Code) -Correct Answer Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. First 2 chapters of code book are -Correct Answer Administrative Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F -Correct Answer True Does the building official have the authority to render interpret...
    (0)
  • $15.49
  • + learn more
Certified Federal Contracts Manager (CFCM)100% Correct
  • Certified Federal Contracts Manager (CFCM)100% Correct

  • Exam (elaborations) • 24 pages • 2024
  • A cost is reasonable if, in its nature and amount, it does not exceed - ANSWER that which would be incurred by a prudent person in the conduct of competitive business. Advance Agreements should not be negotiated - ANSWER after the incurrence of the costs involved. Under the Assignment of Claims Act, a contractor may assign moneys due or to become due under a contract if it meets all but which of the following? - ANSWER The contract specifies payments aggregating $100,000 or more.
    (0)
  • $12.99
  • + learn more
CSLB B LICENSE GENERAL CONTRACTOR EXAM 2024/2025
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM 2024/2025

  • Exam (elaborations) • 62 pages • 2024
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM 2024/2025
    (0)
  • $16.49
  • + learn more
Nascla and GENERAL CONTRACTOR A QUESTIONS & ANSWERS 2024 ( A+ GRADED 100% VERIFIED)
  • Nascla and GENERAL CONTRACTOR A QUESTIONS & ANSWERS 2024 ( A+ GRADED 100% VERIFIED)

  • Exam (elaborations) • 27 pages • 2024
  • Nascla and GENERAL CONTRACTOR A QUESTIONS & ANSWERS 2024 ( A+ GRADED 100% VERIFIED)
    (0)
  • $10.99
  • + learn more
CSLB B LICENSE GENERAL  CONTRACTOR EXAM Q&A
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM Q&A

  • Exam (elaborations) • 31 pages • 2024
  • CSLB B LICENSE GENERAL CONTRACTOR EXAM Q&A If unused mortar stiffens due to hydration of cement, what must you do? - ANSWER Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - ANSWER 24-48 Hours How long should you wait before installing tile on a shower pan? - ANSWER 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples o...
    (0)
  • $12.99
  • + learn more
GENERAL B CONTRACTOR LICENSE EXAM 2024 WITH 100% CORRECT ANSWERS
  • GENERAL B CONTRACTOR LICENSE EXAM 2024 WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 22 pages • 2024
  • it is better to use leveling rod than a yard stick when using a transit because the rod is - correct answer longer Fill dirt is measured in - correct answer cubic yards what backfill should be used after concrete forms have been removed? - correct answer sand The best type of material to set a house foundation on is: - correct answer gravel what doe "rough grade" refer to in excavation and grading - correct answer the grade approximately conforming to the finish grade ...
    (0)
  • $16.49
  • + learn more
Contractor’s License General B Trade Practice Exam #2 Already Passed
  • Contractor’s License General B Trade Practice Exam #2 Already Passed

  • Exam (elaborations) • 13 pages • 2022
  • Contractor’s License General B Trade Practice Exam #2 Already Passed A ladder should extend a minimum of ____ above the top of a trench or excavation. 3' According to OSHA, shoring lumber shall be _______. select structural Cal/OSHA inspectors cannot, under most circumstances: enter a business outside of normal business hours Every employer is required to post Material Safety Data Sheets: on each job site Handrails must be installed on all open sides of a scaffold if workers are subject t...
    (0)
  • $9.49
  • 1x sold
  • + learn more
Certified Federal Contracts Manager  (CFCM)
  • Certified Federal Contracts Manager (CFCM)

  • Exam (elaborations) • 45 pages • 2024
  • Available in package deal
  • Certified Federal Contracts Manager (CFCM) A cost is reasonable if, in its nature and amount, it does not exceed - that which would be incurred by a prudent person in the conduct of competitive business. Advance Agreements should not be negotiated - after the incurrence of the costs involved. Under the Assignment of Claims Act, a contractor may assign moneys due or to become due under a contract if it meets all but which of the following? - The contract specifies payments aggregat...
    (0)
  • $11.99
  • + learn more