Crane course Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Crane course? On this page you'll find 171 study documents about Crane course.

Page 4 out of 171 results

Sort by

Course 158 Crane Safety Basic Questions and Answers_100% A+ Graded (Review Exam)
  • Course 158 Crane Safety Basic Questions and Answers_100% A+ Graded (Review Exam)

  • Exam (elaborations) • 10 pages • 2024
  • Course 158 Crane Safety Basic Questions and Answers_100% A+ Graded (Review Exam) What is defined as "the ultimate load divided by the working load"? - CORRECT ANSWER-The safety factor What is the Halliburton Best Practice minimum allowed sling angle during lifting operations? - CORRECT ANSWER-60 degrees What is the #1 cause of crane fatalities? - CORRECT ANSWER-Electrocution What is defined as "the amount of tension load that is to be applied to the lifting equipment in test to re...
    (0)
  • $10.99
  • + learn more
Crane Course  Pro Final Exam With Complete Verified Answers 2024.
  • Crane Course Pro Final Exam With Complete Verified Answers 2024.

  • Exam (elaborations) • 4 pages • 2024
  • Crane Course Pro Final Exam With Complete Verified Answers 2024.
    (0)
  • $9.99
  • + learn more
Course 158 Crane Safety: Basic QUESTIONS AND ANSWERS
  • Course 158 Crane Safety: Basic QUESTIONS AND ANSWERS

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • Course 158 Crane Safety: Basic QUESTIONS AND ANSWERS
    (0)
  • $7.99
  • + learn more
CHST Self-Assessment Questions and  Answers 100% Pass
  • CHST Self-Assessment Questions and Answers 100% Pass

  • Exam (elaborations) • 18 pages • 2024
  • Available in package deal
  • CHST Self-Assessment Questions and Answers 100% Pass An experienced engineer is NECESSARY when designing a: Movable scaffold system. A worker is using a jackhammer to break concrete. For this work: The worker must be provided with safety glasses, safety shoes, a hard hat, and hearing protection. Which term is characterized by an organization's request to be added to a contractor's liability insurance policy? Additional insured Bituminous-material melting kettles: Should not be...
    (0)
  • $9.99
  • + learn more
FDNY COF S-60 Watchperson at Construction Sites (Citywide) Exam Questions and Answers 100% Pass
  • FDNY COF S-60 Watchperson at Construction Sites (Citywide) Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • FDNY COF S-60 Watchperson at Construction Sites (Citywide) Exam Questions and Answers 100% Pass *ALTERATION* - Correct Answer ️️ -Any construction, addition, change of use or occupancy, or renovation to a building or structure in existence *CONSTRUCTION* - Correct Answer ️️ -The excavation, erection, alteration, and repair of buildings or any component parts, including all operations incidental thereto *COMPETENT PERSON* - Correct Answer ️️ -A person who is capable of identifyi...
    (0)
  • $12.49
  • + learn more
Dogging || with 100% Error-free Answers.
  • Dogging || with 100% Error-free Answers.

  • Exam (elaborations) • 9 pages • 2024
  • How long do you have to apply for a HRW license after passing assessment? correct answers 60 days What happens if a person doesnt renew their HRW license? correct answers The existing license cannot be renewed If you want the license again, you will have to complete the HRW course at an RTO again When can you perform HRW if you don't have a HRW license? correct answers Only if you're enrolled in a RTO course for the relevant HRW class and being supervised by a person with a license for...
    (0)
  • $11.29
  • + learn more
Course 158 Crane Safety Basic Questions with complete solution 2023/2024
  • Course 158 Crane Safety Basic Questions with complete solution 2023/2024

  • Exam (elaborations) • 5 pages • 2023
  • Course 158 Crane Safety Basic Questions with complete solution 2023/2024 Lifting device incorporating a cable suspended latticed boom or hydraulic telescopic boom designed to be moved between operating locations by transport over the road - correct answer mobile crane Include crawler mounted, wheel-mounted, rough terrain, all-terrain, commercial truck-mounted, and boom truck cranes - correct answer mobile crane Lifting structures which utilize a vertical mast or tower to support a working...
    (0)
  • $13.99
  • + learn more
Rigging practices course Questions and 100% Verified Correct Answers 2023/2024
  • Rigging practices course Questions and 100% Verified Correct Answers 2023/2024

  • Exam (elaborations) • 7 pages • 2023
  • Available in package deal
  • Rigging practices course Questions and 100% Verified Correct Answers 2023/2024 A load chart range diagram can best be used to help identify: - Correct Answer net capacity for mobile crane working at maximum radius, exceeding what percentage of the cranes capacity requires the radius to be verified? - Correct Answer 80% the minimum depth of thread engagement for a 1/2 in eyebolt into steel object is? - Correct Answer 3/4 in when tying knots in synthetic rope lashing, the rated load is i...
    (0)
  • $8.49
  • + learn more
Signal Person Training Course Study Guide question with verified solutions 2023/2024
  • Signal Person Training Course Study Guide question with verified solutions 2023/2024

  • Exam (elaborations) • 5 pages • 2023
  • Available in package deal
  • Signal Person Training Course Study Guide. During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A According to ASME B30.5, prior to qualifying all signals persons must be tested by whom? - corre...
    (0)
  • $11.49
  • + learn more
Signal Person Training Course Study Guide Questions with complete solution 2023/2024
  • Signal Person Training Course Study Guide Questions with complete solution 2023/2024

  • Exam (elaborations) • 5 pages • 2023
  • Signal Person Training Course Study Guide Questions with complete solution 2023/2024 During all crane movements, ASME B30.5 states that communication shall be maintained: - correct answer Continuously If the communication is disrupted at any time while the crane is in operation, the operator Shall: - correct answer Stop all crane movements OSHA's Standard hand signals would be located in: - correct answer OSHA 1926.1400 Appendix A According to ASME B30.5, prior to qualifying all signa...
    (0)
  • $13.49
  • + learn more