Crane load charts exam - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Crane load charts exam? On this page you'll find 44 study documents about Crane load charts exam.
Page 4 out of 44 results
Sort by
-
NCCCO 7 Crane-Load Charts Exam Review Questions and Answers
- Exam (elaborations) • 6 pages • 2024
-
Available in package deal
-
- $8.00
- + learn more
Crane configuration includes: - Reeving, boom length, counterweight, on outriggers, on rubber, extensions or jibs stowed or mounted, offsets, wire rope type or construction 
How does the operator determine the manufacturers recommended rope for the crane? - Read the manufacturer load chart or operator manual 
Capacities above the bold line on the load chart are based on: - Structural strength 
If replacing the hoist line wire rope on a crane, how do you determine the size or type of 
wire rope t...
-
Certified mobile crane operator prep Test Questions And Answers 100% Pass.
- Exam (elaborations) • 10 pages • 2024
-
- $11.49
- + learn more
werNever 
what is the purpose of a boom length indicator? - answerto provide the actual boom length at 
the time of use. 
when can the operator leave the crane? - answerafter securing the crane 
when can a crane be side loaded - answerwith a freely suspened load 
the deflection of a boom will cause the load to? - answerincrease the radius 
which inspection has a competent person making records of the inspection? - answerMonth 
when should tag lines be used? - answerwhen the rotation of the suspe...
-
NCCCO Practice exam | Questions and Correct Answers | Latest Update 2024/2025 | Graded A+
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
NCCCO Practice exam | Questions 
and Correct Answers | Latest Update 
2024/2025 | Graded A+ 
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, 
extensions or jibs stowed or mounted, off sets, wire rope type or 
construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. drum rotation indicator, anti-two block, axle lock outs, and positive 
house lock - Answer -A 
How does th...
-
OECP 2024 Exam Questions Marking Scheme with Complete Solutions
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
OECP 2024 Exam Questions Marking 
Scheme with Complete Solutions 
what type of fire extinguisher is required on a crane - Answer- 10BC 
what should am operator do in the event of a power line contact - Answer- remain in the 
machine unless fire or emergency 
what is the minimum distance from a 200kv power line - Answer- 20ft 
where must electrocution warnings be displayed - Answer- 1 in the cab, 2 on the outside 
a boom angle indicator does not show what? - Answer- boom deflection 
hand signals ...
-
OECP 2024 Exam Questions Marking Scheme with Complete Solutions
- Exam (elaborations) • 7 pages • 2024
-
- $11.49
- + learn more
OECP 2024 Exam Questions Marking 
Scheme with Complete Solutions 
what type of fire extinguisher is required on a crane - Answer- 10BC 
what should am operator do in the event of a power line contact - Answer- remain in the 
machine unless fire or emergency 
what is the minimum distance from a 200kv power line - Answer- 20ft 
where must electrocution warnings be displayed - Answer- 1 in the cab, 2 on the outside 
a boom angle indicator does not show what? - Answer- boom deflection 
hand signals ...
As you read this, a fellow student has made another $4.70
-
OSHA 30 Exam Questions And Answers (Verified And Updated)
- Exam (elaborations) • 15 pages • 2024
-
- $12.49
- + learn more
OSHA 30 Exam Questions And Answers 
(Verified And Updated) 
Those who work on a crane or near crane operations must be trained. Which of the following is 
true for this training? - answerD. All of the above 
Certain inspections of crane equipment may be made by a(n) ___________ person; however, 
crane inspections are typically required to be made by a(n) __________ person. - 
answerCompetent, qualified 
After safety-related modifications have been made to crane equipment, the equipment must be 
...
-
Osha 30 Crane safety Exam Questions With 100% Correct Answers
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
Osha 30 Crane safety Exam Questions 
With 100% Correct Answers 
standards for crane safety can be found in - answera. 29 cfr 19 subpart cc 
which of the following is an employer requirement - answerd. all of the above 
you must assure your crane is stable by each except - answerb on-board seismograph 
load charts must - answerb. indicate rated lifting capacity ad be visible to operator 
an annual inspection of each crane is - answerd all of the above 
cranes must maintain a min of ___ feet away ...
-
NCCCO Lattice Boom General Knowledge Exam Questions With All Correct Answers
- Exam (elaborations) • 11 pages • 2024
-
- $10.99
- + learn more
NCCCO Lattice Boom General Knowledge Exam Questions With All Correct Answers 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - Answer-c. 
 
/.1. Where must the operator's manual be kept during crane operations? 
a. The operator's manual must be kept in a location that is readily available 
b. The operator's manual must...
-
PHR/SPHR Terms Exam 282 Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 131 pages • 2024
-
Available in package deal
-
- $12.99
- + learn more
PHR/SPHR Terms Exam 282 Questions with Verified Answers 
 
B. aPHR 
C. SHRM-CP 
D. IPMA-SCP 
F. SPHR-SCP - CORRECT ANSWER 1. Which of the following are valid HR certifications? 
A. SPHRca 
B. aPHR 
C. SHRM-CP 
D. IPMA-SCP 
E. Intern-CP 
F. SPHR-SCP 
 
Human Resource Certification Institute (HRCI) - CORRECT ANSWER 1. ______________ was accredited by the National Commission for Certifying Agencies (NCCA) in 2008. 
 
A. SHPRi - (1) HRCI 
B. aPHR - (1) HRCI 
C. SHRM-SCP - (2) 
D. IPMA-CP - (3) - CO...
-
Ncco mobile crane test NEWEST 2024 EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES VERIFIED ANSWERS |ALREADY GRADED A+
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
Ncco mobile crane test NEWEST 2024 EXAM COMPLETE QUESTIONS AND 
CORRECT DETAILED 
ANSWERS WITH 
RATIONALES VERIFIED 
ANSWERS |ALREADY 
GRADED A+ 
 
 
 
 
 
 
 
When a spinning load presents a danger the 
operator should –	 
 
️️️ANS-Use a tagline 
 
 
 
If a value is not listed in the capacity charts , and 
you're in between boom lengths , you should –	 
 
 ️️️NS-: use the next longer length 
 
 
 
 
 
 
The jib capacity is 8 tons and the ball wei...
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia