Crane operators - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Crane operators? On this page you'll find 289 study documents about Crane operators.
Page 4 out of 289 results
Sort by
-
CATEGORY 3 NON-CAB OPERATED TEST QUESTIONS WITH CORRECT ANSWERS
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $6.99
- 1x sold
- + learn more
Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as ______ cranes CORRECT ANSWER Category 2 
 
The expiration date that is of particular importance to crane operators is CORRECT ANSWER The certification expiration date of the crane 
 
Who is primarily responsible for evaluating a Crane Operators physical and emotional fitness CORRECT ANSWER crane operator 
 
A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane. CORRECT ANSWER Category 3 
 
...
-
NCCCO Certification of Crane Operators Core Exam Practice Questions 100% Pass | Graded A+ David Mungai [Date] [Course title]
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO Certification of Crane Operators Core Exam Practice Questions 100% Pass | Graded A+
-
NCCCO NATIONAL COMMISSION FOR THE CERTIFICATION OF CRANE OPERATORS
- Exam (elaborations) • 2 pages • 2024
- Available in package deal
-
- $14.79
- + learn more
NCCCO NATIONAL COMMISSION FOR THE 
CERTIFICATION OF CRANE OPERATORS
-
crane test 2022 with complete solution;(To study for ct crane operators test)
- Exam (elaborations) • 5 pages • 2023
-
- $9.49
- + learn more
crane test 2022 with complete solution;(To study for ct crane operators test) 
 
Side loading can occur when: 
The crane is out of level, during rapid swing, dragging or pulling loads sideways, improperly performed tilt-up operations, or high winds 
Crane's leverage 
Crane weight times the horizontal distance from the center of gravity to the tipping axis 
Load's leverage 
The horizontal distance from the center of gravity of the load to the tipping axis times the load weight 
Margin of stabil...
-
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)
- Exam (elaborations) • 23 pages • 2024
-
- $15.99
- + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED) The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required in 
the construction...
Get paid weekly? You can!
-
OECP Exam Questions With 100% Correct Answers 2024/2025
- Exam (elaborations) • 23 pages • 2024
-
- $15.49
- + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025. What are the four different types of 
crane signals? 
Hand 
Voice 
Audible 
New 
2. The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D...
-
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Verified)
- Exam (elaborations) • 16 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
If load is undetermined who is to find out if load weight does not exceed crane rating at radius 
at which the load is to be lifted - ANSWER Person responsible for lift 
Where should climbing instructions be kept - ANSWER ON Site 
All climbing operations shall be performed under the supervision of - ANSWER Qualified 
person 
When cranes are erected, load limiting devices shall be tested for proper setting and 
operation - ANSWER Before crane is placed in service 
Hooks shall be equipped with lat...
-
crane test 2022 with complete solution;(To study for ct crane operators test)
- Exam (elaborations) • 5 pages • 2023
-
- $9.49
- + learn more
crane test 2022 with complete solution;(To study for ct crane operators test) 
 
Side loading can occur when: 
The crane is out of level, during rapid swing, dragging or pulling loads sideways, improperly performed tilt-up operations, or high winds 
Crane's leverage 
Crane weight times the horizontal distance from the center of gravity to the tipping axis 
Load's leverage 
The horizontal distance from the center of gravity of the load to the tipping axis times the load weight 
Margin of stabil...
-
OECP Exam Questions With 100% Correct Answers Latest Update 2024/2025 (VERIFIED)
- Exam (elaborations) • 23 pages • 2024
-
- $14.99
- + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (VERIFIED) The shaded area on a load chart 
indicates _______? 
A structural chart 
3. The minimum distance to a power 
line of unknown voltage is ? 
50' 
4. When hoisting personnel and have 
known voltage, can you use Table A 
and get closer than 20'? 
Never! 
5. What is the minimum tale swing 
clearance requirement 
2' 
6. What kind of rigger is required for 
A/D? 
Qualified Rigger 
7. Signal training is now required in 
the constructi...
-
General crane safety Exam Questions With 100% Correct Answers
- Exam (elaborations) • 28 pages • 2024
-
- $13.49
- + learn more
General crane safety Exam Questions With 
100% Correct Answers 
The minimum crane team for a mobile crane on outriggers would consist of- 
A) The Crane Operator, Rigger Supervisor, and Crane Rigger 
B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and 
Crane Rigger 
C) The Crane Operator, Crane Supervisor, and Crane Rigger 
D) The Crane Operator and Rigger-in-Charge 
E) The Crane Operator, Crane Walker, and Crane Rigger - answerC) The Crane Operator, 
Crane Supervisor, and Crane Rigge...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia