Cslb test 4 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cslb test 4? On this page you'll find 111 study documents about Cslb test 4.
Page 4 out of 111 results
Sort by
-
CSLB Concrete C8 License Practice Test #1 Questions and Answers 100% Correct
- Exam (elaborations) • 11 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
CSLB Concrete C8 License Practice Test #1 Questions and Answers 100% CorrectCSLB Concrete C8 License Practice Test #1 Questions and Answers 100% CorrectCSLB Concrete C8 License Practice Test #1 Questions and Answers 100% CorrectCSLB Concrete C8 License Practice Test #1 Questions and Answers 100% Correct 
What is the volume of a cylinder if the diameter equals 3 feet and the length equals to 12 feet? - ANSWER-84.78 cubic feet 
 
Explanation: 
There are two ways to solve the problem. However, rega...
-
CSLB B LICENSE GENERAL CONTRACTOR EXAM With 100% Correct Answers
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
CSLB B LICENSE GENERAL 
CONTRACTOR EXAM With 100% Correct 
Answers 
If unused mortar stiffens due to hydration of cement, what must you do? - answerDiscard the 
mortar 
What minimum time must you wait before caulking or grouting new tiles? - answer24-48 
Hours 
How long should you wait before installing tile on a shower pan? - answer24 Hours 
Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths 
greater than 0.5 and less than 1.5 tons/sq ft (tsf), are ty...
-
CSLB Concrete C8 License Practice Test 3 with Questions and Answers
- Exam (elaborations) • 12 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
CSLB Concrete C8 License Practice Test 3 with Questions and Answers 
 
The slope of the side gutter from the edge of the shoulder to the bottom of the gutter, shall NOT be more than_________. ANSWER 6:1 
 
If the temperature during the concrete repair/restoration works is below________ ͨ F, warm water needs to be used. ANSWER 50, 
 
Explanation: 
Additionally insulation covers are also required. 
 
In columns where multiple layers of reinforcement steel is required to be arranged in groups, the...
-
CSLB Concrete C8 License Practice Test #4 Questions And Well Explained Answers
- Exam (elaborations) • 11 pages • 2024
-
- $7.99
- + learn more
CSLB Concrete C8 License Practice Test 
#4 Questions And Well Explained 
Answers 
 
 
 
 Which of the following factors directly impact each other in the process of cost estimation for a 
concrete building project? - answer Interest rate, Holding cost, Cost escalation 
 
 Which of the following points are true about Work Breakdown Structure (WBS) in the planning 
of a construction project? - answer Decomposing of a task into doable, measureable, estimable , 
and schedulable units 
 ...
-
CSLB CONTRACTOR'S LAW & BUSINESS EXAM QUESTIONS AND ANSWERS 100% PASS
- Exam (elaborations) • 41 pages • 2024
-
- $13.49
- + learn more
CSLB CONTRACTOR'S LAW & BUSINESS EXAM 
QUESTIONS AND ANSWERS 100% PASS 
An employer remits State disability taxes withheld from an employees wages to what 
agency? - Correct Answer ️️ -Employment Development Department 
Which act establishes the rights of workers to organize into unions and negotiate 
contracts? - Correct Answer ️️ -National Labor Relations Act of 1935 
A contractor has had a problem with employees stealing tools and equipment from job 
sites. When conducting job interv...
Too much month left at the end of the money?
-
Contractors State License Exam Practice Questions and Answers (100% Pass)
- Exam (elaborations) • 19 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
-
Study Guide Exam Questions From All CSLB Trade Test.
- Exam (elaborations) • 30 pages • 2024
-
Available in package deal
-
- $13.99
- + learn more
Study Guide Exam Questions From All CSLB Trade Test. 
 
 
The lifting lines should be as vertical as possible - CORRECT ANSWER When using a crane to lift a 12,000-gallon tank out of the excavation, what is the preferable position of the rigging lines attached to the tank's lifting eyes? 
 
A. One lifting line should be horizontal 
B. The lifting lines should be as far apart as possibles 
C. The lifting lines should be as horizontal as possible 
D. The lifting lines should be as vertical as pos...
-
CSLB Health and Safety Study Guide Test.
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
CSLB Health and Safety Study Guide Test. 
 
 
2.5 cubic yards - CORRECT ANSWER Back up warning light required if vehicle is at least this size 
 
When does cal osha require new employees to be trained - CORRECT ANSWER At the time they are hired 
 
14" - CORRECT ANSWER Minimum plank width for ladder jack scaffold 
 
Employers with 10 or less employees - CORRECT ANSWER Cal osha does not require records for this employer 
 
Where should a flagged stand in a work area - CORRECT ANSWER 100' from wo...
-
CSLB CONTRACTOR’S PRACTISE LAW EXAM / 50+ QUESTIONS AND VERIFIED ANSWERS / 2023/2024 ALL CORRECT / GRADED A+.
- Exam (elaborations) • 11 pages • 2023
-
- $10.49
- + learn more
CSLB CONTRACTOR’S 
PRACTISE LAW EXAM / 50+ 
QUESTIONS AND 
VERIFIED ANSWERS / 
2023/2024 ALL CORRECT / 
GRADED A+. 
CSLB Contractor's Law practice test 2023 
2023 
1. When should you let your attorney see a construction contract? 
A. Before you let the client see the contract 
B. After the contract is prepared but before you sign it 
C. After the building permit is obtained 
D. After the contract is signed by you and the client: B. After the contract is 
prepared but before you sign it 
2. Wh...
-
CSLB Contractor's Law practice test Part 2 Questions and Answers (100% Pass)CSLB Contractor's Law practice test Part 2 Questions and Answers (100% Pass) When should you let your attorney see a construction contract? A. Before you let the client see
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
CSLB Contractor's Law practice test Part 2 
Questions and Answers (100% Pass) 
When should you let your attorney see a construction contract? 
A. Before you let the client see the contract 
B. After the contract is prepared but before you sign it 
C. After the building permit is obtained 
D. After the contract is signed by you and the client - Answer️️ -B. After the 
contract is prepared but before you sign it 
Which is the most correct statement as to what must be included in every home 
i...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia