High frequency generators - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about High frequency generators? On this page you'll find 308 study documents about High frequency generators.
Page 4 out of 308 results
Sort by
-
SOS NERC Prep - RElIABILITY Exam Questions With Correct Answers
- Exam (elaborations) • 78 pages • 2024
- Available in package deal
-
- $13.49
- + learn more
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decrease Net Interchange Schedule by 20 MWs. 
 
D) Increase Net Interchange Sche...
-
PJM Generation Operation Exam |65 Questions with 100% Correct Answers | Verified | Updated 2024
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Control center facilities must have a minimum of how many days of fuel for the backup generator? - ️️5 days 
 
If PJM ACE shows overgeneration, actual imports are: - ️️Less than scheduled 
 
Who should a generator contact at PJM to clear an outage ticket? - ️️Master Coordinator 
 
To correct for a slow or fast clock, system frequency schedules are offset by: - ️️+/-.02 Hz 
 
What frequency would PJM set to correct for fast-time error? - ️️59.98Hz 
 
What frequency would PJM s...
-
SOS NERC RELIABILITY EXAM QUESTIONS & ANSWERS LATEST 2023-2024 GRADED A+
- Exam (elaborations) • 69 pages • 2023
-
Available in package deal
-
- $15.49
- + learn more
SOS NERC RELIABILITY EXAM QUESTIONS & ANSWERS LATEST GRADED A+. The Reliability Coordinator just informed you of a slow time error correction 
which will begin at the top of the next hour. Your EMS system will not let you 
change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. 
What action should you take? 
A) Increase Net Interchange Schedule by 20 MWs. 
B) Inform the Reliability Coordinator that you cannot participate in the time error 
correction. 
C) Decrease Net Inte...
-
Practice Test ASRT CT Exam Questions with 100% Correct Answers 100% Solved
- Exam (elaborations) • 22 pages • 2024
-
- $11.49
- + learn more
Practice Test ASRT CT Exam Questions 
with 100% Correct Answers 100% Solved 
The z-axis refers to the ______ plane. 
a) coronal 
b) axial 
c) sagittal 
d) transverse - axial 
Generators are often times located within the gantry. These types of 
generators are typically: 
a) full wave/three-phase. 
b) medium frequency. 
c) high frequency. 
d) multiwave/two-phase. - high frequency 
Modern CT scanners rely on ____ to process acquired data. - 
minicomputers
-
NERC SOS quiz Questions and Answers (Already GRADED A)
- Exam (elaborations) • 60 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
A Balancing Authority is performing Overlap Regul...
Too much month left at the end of the money?
-
NERC book Quiz Questions and Answers 2023-2024 Graded A
- Exam (elaborations) • 13 pages • 2023
-
- $12.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW 
 
Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
-
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified)
- Exam (elaborations) • 54 pages • 2024
-
- $17.99
- + learn more
NERC TEST 200 Exam Questions and Answers Latest 2024/2025 (100% Verified) When system conditions are such that emergency procedures are expected to be 
implemented, which of the following actions should be considered first? 
a. Shed firm load 
b. Implement Active Load Management 
c. Return outaged equipment to service 
d. Request a voltage reduction - c. Return outaged equipment to service 
3. If your transmission path is rated for 1200 MW and 1000 MW are scheduled on 
it, but due to parallel fl...
-
NERC SOS QUIZ QUESTIONS WITH 100% CORRECT ANSWERS.
- Exam (elaborations) • 46 pages • 2023
-
- $14.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
 
A Balancing Authority is performing Overlap R...
-
Practice Test NERC Questions and Correct Answers (GRADED A+)
- Exam (elaborations) • 48 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? 
The phase angle will increase. When load is increased phase angle will increase. 
 
 
A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 
90 pf= mw/mva 
 
 
The high side of a delta-wye connection transformer is connected to a power s...
-
NERC Prep Test Questions with Complete Solutions Rated A+
- Exam (elaborations) • 57 pages • 2023
-
Available in package deal
-
- $9.49
- + learn more
NERC Prep Test Questions with Complete Solutions Rated A+ 
 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system -Answer a. Generator MVAR output would increase 
 
2. When system conditions are such that em...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia