Hvac final accurate - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Hvac final accurate? On this page you'll find 71 study documents about Hvac final accurate.
Page 4 out of 71 results
Sort by
-
NCCER Module 2 Exam Questions and Answers 100% pass
- Exam (elaborations) • 23 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NCCER Module 2 Exam Questions and Answers 100% pass 
An estimator is preparing a bid for a home remodeling project. She has determined that 
the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and 
the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be 
needed? - Answer- 1,037 feet 
A plumbing contractor bid the rough-in work for a new three story office building based 
an estimate of 850 hours of a journey-level plumber's time on the job....
-
HVAC Controls Unit 14 Final Exam 2024.
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $10.49
- + learn more
HVAC Controls Unit 14 Final Exam 2024. 
 
 
If a mercury bulb thermostat is not mounted perfectly level, there will be a large difference between the actual room temperature and the thermostat's set point. - CORRECT ANSWER The correct answer is 'True'. 
 
Line voltage thermostats have heavier contacts and use which type of sensing element? - CORRECT ANSWER The correct answer is: all of the above 
a. bimetal 
 
b. bellows 
 
c. remote bulb 
 
The best type of switch to detect air movement is...
-
CSLB B General Practice Questions and Answers Latest Update 2023-2024 | 100% Verified
- Exam (elaborations) • 18 pages • 2023
-
- $16.49
- + learn more
CSLB B General Practice Questions and Answers Latest Update | 100% Verified. What does "rough grade" refer to in excavation and grading? 
A. The natural grade at the worksite 
B. The grade prior to grading 
C. The final grade 
D. The grade approximately conforming to the finish grade: The grade approximately conforming to the finish grade 
6. 1. How many days can earth from a trench be piled up against a structure? 
A 18 
B. 7 
CSLB B General Practice Questions and Answers | 100% 
Correct Ans...
-
Asbestos Project Monitor Questions and Answers 2024 100% Accurate
- Exam (elaborations) • 7 pages • 2024
-
Available in package deal
-
- $17.99
- + learn more
Asbestos Project Monitor Questions and Answers 2024 100% Accurate 
Name the two classifications of asbestos fibers 
Serpentine and Amphibole 
 
 
 
Of the six types of asbestos fibers, which are the two most common? 
Chrysotile and Amosite 
 
 
 
Which type of asbestos is the most difficult to keep wet? 
Amosite 
 
 
 
What is asbestosis? 
Scarring of the lung tissue and alveoli 
 
 
 
What is mesothelioma? 
Abnormal, uncontrolled growth (pleural and peritoneal membranes). 
 
 
 
What is lung ca...
-
HVAC final exam unit 11 complete solutions
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
HVAC final exam unit 11 complete solutions 
To check the temperature leads of an electronic thermometer for low temperature, they should be 
stirred in a container of Crushed ice and pure water 
Ohm's law is represented with the formula I=E/R 
A device commonly used for detecting refrigerant leaks is a(n) Halide torch 
Three reference points for checking temperature measuring instruments are 32, 98, 212 degrees 
If the ammeter is off by more than _____% it should be sent to the repair sho...
Want to regain your expenses?
-
NCCER Module 2 Exam Questions and Answers 100% pass
- Exam (elaborations) • 23 pages • 2024
-
- $12.49
- + learn more
NCCER Module 2 Exam Questions and Answers 100% pass 
An estimator is preparing a bid for a home remodeling project. She has determined that 
the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and 
the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be 
needed? - Answer- 1,037 feet 
A plumbing contractor bid the rough-in work for a new three story office building based 
an estimate of 850 hours of a journey-level plumber's time on the job....
-
NCCER Module 2 Exam Questions and Answers 100% pass
- Exam (elaborations) • 23 pages • 2024
-
- $13.49
- + learn more
NCCER Module 2 Exam Questions and Answers 100% pass 
An estimator is preparing a bid for a home remodeling project. She has determined that 
the new garage needs 324 feet of 2x10 lumber; the new rec room requires 430 feet; and 
the new upstairs bonus room needs 283 feet. How many feet of 2x10 lumber will be 
needed? - Answer- 1,037 feet 
A plumbing contractor bid the rough-in work for a new three story office building based 
an estimate of 850 hours of a journey-level plumber's time on the job....
-
CSLB B Exam Practice Questions and Answers Latest Update 2023-2024
- Exam (elaborations) • 18 pages • 2023
-
Available in package deal
-
- $14.49
- + learn more
CSLB B Exam Practice Questions and Answers Latest Update . What backfill should be used after concrete forms have been removed? 
A. Silt 
B. Gravel 
C. Clay 
D. Sand: clay 
4. 1. The best type of material to set a house foundation on is: 
A. Loam/peat 
B. Clay 
C. Gravel 
D. Sand: gravel 
5. 1. What does "rough grade" refer to in excavation and grading? 
A. The natural grade at the worksite 
B. The grade prior to grading 
C. The final grade 
D. The grade approximately conforming to the finish ...
-
HVAC final exam, unit 12 Accurate 100%
- Exam (elaborations) • 2 pages • 2024
-
Available in package deal
-
- $8.49
- + learn more
An ampere is - ANSWER A measure of the quality of electrons flowing past a point in the electrical circuit in a given time 
 
What part of an atom moves from one atom to another? - ANSWER electron 
 
An element in an electric heating unit is applied to a 232-volt power supply. The current flow through the element
-
HVAC unit 14 verified answer
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $9.49
- + learn more
HVAC final exam unit 14 verified answers 
When a water regulating valve is used to control the head pressure of a water-cooled system, the valve's 
spring is acting against which pressure to modulate the water flow? ️Head pressure of the system 
To prove that the combustion blower motor is operating before ignition, a ______ would be used. 
️Sail switch 
The difference between system overshoot and system lag is called? ️Temperature swing 
The purpose of a heat anticipator is to_____...
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia