Mobile cranes no 1 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Mobile cranes no 1? On this page you'll find 169 study documents about Mobile cranes no 1.
Page 4 out of 169 results
Sort by
-
Commercial Real Estate SAE - Champion's School of Real Estate 495 Questions with Verified Answers,100% CORRECT
- Exam (elaborations) • 75 pages • 2023
-
- $13.49
- 3x sold
- + learn more
Commercial Real Estate SAE - Champion's School of Real Estate 495 Questions with Verified Answers 
 
Productivity Management - CORRECT ANSWER Measuring the results from the use of available systems and tools for prospecting activities 
 
CRM - CORRECT ANSWER Contact Relationship Manager, a tool used to automate prospecting tasks and manage leads 
 
Geographic farming - CORRECT ANSWER A particular area that may include neighborhoods that a sales agent or broker markets for the solicitation of bu...
-
NCCCO CORE | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NCCCO CORE | Questions and Correct 
Solutions | Latest Update 
2024/2025 | Graded A+ 
Before leveling a mobile crane on outriggers, an operator should 
ensure: - Answer -there is no weight of the crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what 
support condition should be considered? - Answer -Keeping 90 degree 
angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom 
point sheave? - Answer -Separate the...
-
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED
- Exam (elaborations) • 9 pages • 2024
-
Available in package deal
-
- $12.39
- + learn more
NCCCO CORE 2024 TEST QUESTIONS ALL ANSWERED 
 
Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER- there is no weight of the crane bearing on any tires 
 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER- Keeping 90 degree angle between cylinder rod and pad 
 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER- Separate the boom hoist lines 
 
How many randomly ...
-
Lattice Boom Crane Review Questions With 100% Correct Answers!!
- Exam (elaborations) • 4 pages • 2024
-
- $7.99
- + learn more
On lattice boom cranes with power load lowering mounted on the hoist, a heavy load should be lowered 
by; - Power load lowering feature and the foot brake 
A pin-connected lattice boom is being dismantled. After connecting the equalizer(bridle) to the 
connecting lugs on the boom butt, which boom connecting pins should be removed first? - Lower 
connection pins, located ahead of the equalizer 
Using a mobile crane on a barge, the cranes load capacity ratings will be? - replaced by a list chart 
...
-
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) When hoisting personnel, within what percentage of level must a telescopic boom crane be in 
order for the gross ratings in the load chart to remain valid? 
a. 1% 
b. 2% 
c. 5% 
d. 8% correct answers a. 
3. The load line of the crane you're operating contacts an energized power line. There's no sign of 
any other danger, such as fire. What should you do? 
a. Climb down carefully from the crane cab 
b. Jump do...
Fear of missing out? Then don’t!
-
NCCCO CORE Questions | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 11 pages • 2024
-
- $8.49
- + learn more
Before leveling a mobile crane on outriggers, an operator should ensure: - there is no weight of the 
crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what support condition should be 
considered? - Keeping 90 degree angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - Separate the 
boom hoist lines 
How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, ...
-
NCCCO CORE EXAM – 119 QUESTIONS WITH VERIFIED SOLUTIONS
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $13.99
- + learn more
Before leveling a mobile crane on outriggers, an operator should ensure: 
 
 
there is no weight of the crane bearing on any tires 
 
 
 
1 / 119 
 
 
Profile Picture 
Created by 
krista_jansky 
 
Share 
 
Students also viewed 
NCCCO Core Prep Test 
Teacher 
178 terms 
Profile Picture 
ITSA-Teacher 
 
Preview 
NCCCO MOBILE CRANE 
99 terms 
Profile Picture 
Mari_Cela_Fer 
 
Preview 
Nccco core 
343 terms 
Profile Picture 
Max_Marino8 
 
Preview 
Nccco core 
343 terms 
Profile Picture 
mastersolut...
-
Mobile Cranes No. 1 Study Guide | 100% Correct Answers | Verified | Latest 2024 Version
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
The load radius as shown on the capacity chart is the distance from the center of rotation to the 
centerline of the vertical host line with: - The rated load suspended. 
If the jib angle to ground is changed from 50 degrees to 40 degrees, this would affect the capacity of the 
crane how? - Capacity will decrease. 
Load capacity charts are based on 75% of tipping for crawler cranes without out riggers. For wheel 
mounted cranes, using outriggers fully extended, capacities are based on what perce...
-
GENERAL CRANE SAFETY EXAM 2024- 2025 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) Latest Update
- Exam (elaborations) • 49 pages • 2024
-
- $15.99
- + learn more
The minimum crane team for a mobile crane on outriggers would consist ofA) The Crane Operator, Rigger Supervisor, and Crane Rigger 
B) The Crane Operator, Crane Supervisor, Rigger Supervisor, and 
Crane Rigger 
C) The Crane Operator, Crane Supervisor, and Crane Rigger 
D) The Crane Operator and Rigger-in-Charge 
E) The Crane Operator, Crane Walker, and Crane Rigger 
 C) The Crane Operator, Crane Supervisor, and Crane Rigger 
When operating floating cranes, you must start swinging or rotating qu...
-
NCCCO Crane Operator Exam Questions and Answers
- Exam (elaborations) • 28 pages • 2024
-
Available in package deal
-
- $12.00
- + learn more
Which statement best describes the importance Osha 29 CFR 1926.550 places on a crane manufacturers instructions specifications and limitations? - They must be followed exactly as the law 
According to Osha 29 CFR 1926.550 where must hand signals be placed - On the job site 
According to Osha 1910.180, how accurate must the load weight be when making picks in the structural portion of the load chart - Plus or minus 10% 
According to Osha 1910.180, are cranes allowed to be over weight - Yes, but o...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia