Mssc pre maintenance - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Mssc pre maintenance? On this page you'll find 37 study documents about Mssc pre maintenance.
Page 4 out of 37 results
Sort by
-
MSSC - Pre-Maintenance questions and correct|verified|A+graded solutions
- Exam (elaborations) • 11 pages • 2024
-
- $9.49
- + learn more
_____________ are used to remove undissolved contaminates in 
hydraulic fluid. 
a. Magnets - Filters 
______________________ prevents large particles from damaging the 
pump and it placed in 
the reservoir - Strainer 
A _____________ is a non-destructive test that uses a colored spray to 
reveal imperfections in a weld - dye-penetrant test 
A green welding hose normally indicates that this hose carries - 
Oxygen 
A lube oil sample from a gearbox should be taken 
__________________________ - As c...
-
MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 1 WITH 100% CORRECT ANSWERS 2023 ALREADY GRADED A+
- Exam (elaborations) • 8 pages • 2024
-
- $11.49
- + learn more
MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 1 WITH 100% CORRECT ANSWERS 2023 ALREADY GRADED A+ 
 
Metals that contain iron, such as mild steel, are called ____________metals. - answer ferrous 
 
Metals contain iron, such as steel, have ________ properties. - answer magnetic 
 
Metals treated by __________ processes become soft. - answer annealing 
 
An explosion can occur if __________ comes in contact with oil. - answer high pressure oxygen 
 
What device should be stored at a minimum of 20 feet fr...
-
MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS
- Exam (elaborations) • 6 pages • 2024
-
- $10.99
- + learn more
MSSC CPT MAINTENANCE AWARENESS PRE-QUIZ 2 WITH 100% CORRECT ANSWERS 
 
The 3 types of shafts to adjacent shaft power transmissions are _______ - answer belt drive -- chain drive -- gear drive 
 
The proper place to lock out an electrical control system is at the__________ - answer disconnect switch 
 
To _______________ workers should ALWAYS interrupt the power at the motor disconnect. - answer perform lockout/tagout 
 
What agency suggests that a worker inspect and test all equipment, assuming ...
-
MSSC CPT Maintenance Pre-Quiz Final Exercise Correctly Answered (RATED A+)
- Exam (elaborations) • 7 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
A chain should be replaced when its length becomes________ longer than the original length. - ANSWER 3% 
 
Daily maintenance involves daily records because - ANSWER recurring events can be analyzed to troubleshoot problems 
 
Prior to shutting down a machine for preventive maintenance, the operator MUST - ANSWER remove all the debris and any residue from the machine 
 
The best place for an operator to find information regarding the handling of all lubricants and safety precautions is in - ANSWE...
-
MSSC CPT Maintenance Pre-Quiz Final Exercise
- Exam (elaborations) • 7 pages • 2023
-
- $10.99
- + learn more
MSSC CPT Maintenance Pre-Quiz 
Final Exercise
And that's how you make extra money
-
MSSC CPT Maintenance Pre-Quiz Final Exercise
- Exam (elaborations) • 7 pages • 2023
-
- $10.99
- + learn more
MSSC CPT Maintenance Pre-Quiz 
Final Exercise
-
MSSC CPT Maintenance Pre-Quiz Final Exercise
- Exam (elaborations) • 7 pages • 2023
-
- $10.99
- + learn more
MSSC CPT Maintenance Pre-Quiz 
Final Exercise
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia