Mws part two - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Mws part two? On this page you'll find 41 study documents about Mws part two.

Page 4 out of 41 results

Sort by

Fire Apparatus Driver/Operator - MWS Challenge Review- 98 QUESTIONS- WITH COMPLETE SOLUTIONS
  • Fire Apparatus Driver/Operator - MWS Challenge Review- 98 QUESTIONS- WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 13 pages • 2023
  • Identify TWO correct statements about conducting a daily inspection of an MWS apparatus equipped with a fire pump correct answer: A. Check to make sure the auxiliary fuel tank is at least 1/2 full B. Operates the pump drive control - Correct Answer C. Ensure that the fire pump and booster lines are full D. Check the pump gearbox oil level E. Confirm that the foam tank level is full - Correct Answer Place the steps for Part II of the pressure control test in the correct order corr...
    (0)
  • $12.49
  • + learn more
NERC Certification Exam Questions With Correct Answers
  • NERC Certification Exam Questions With Correct Answers

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - Answer B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - Answer B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - Answer B) False True/False ...
    (0)
  • $11.49
  • + learn more
Practice Test NERC Questions and Correct Answers (GRADED A+)
  • Practice Test NERC Questions and Correct Answers (GRADED A+)

  • Exam (elaborations) • 48 pages • 2023
  • A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? The phase angle will increase. When load is increased phase angle will increase. A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? 90 pf= mw/mva The high side of a delta-wye connection transformer is connected to a power s...
    (0)
  • $11.99
  • + learn more
Water Shuttle Operations QUESTIONS WITH COMPLETE SOLUTIONS
  • Water Shuttle Operations QUESTIONS WITH COMPLETE SOLUTIONS

  • Exam (elaborations) • 4 pages • 2023
  • You've been asked to help prepare a pre-incident plan for water shuttle operations that may be needed at a small factory in your jurisdiction. The best choice for the route of travel between the fill site and the dump site is: correct answer: A five-mile, circular route where the leg from the fill site would be downhill and the leg from the dump site would be uphill. You've been asked to help with pre-incident planning of water shuttle operations in your jurisdiction. First, you'll need t...
    (0)
  • $11.49
  • + learn more
SOS NERC Prep - Reliability Exam Latest 2023.
  • SOS NERC Prep - Reliability Exam Latest 2023.

  • Exam (elaborations) • 68 pages • 2023
  • SOS NERC Prep - Reliability Exam The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by...
    (0)
  • $13.99
  • + learn more
NERC Prep - Bal, Int, & Trans Test 2023
  • NERC Prep - Bal, Int, & Trans Test 2023

  • Exam (elaborations) • 13 pages • 2023
  • Available in package deal
  • b. NERC Operating Committee - ANSWER-What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment - ANSWER-What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equ...
    (0)
  • $12.49
  • + learn more
NERC Practice Test  Questions With Verified Answers
  • NERC Practice Test Questions With Verified Answers

  • Exam (elaborations) • 24 pages • 2024
  • Available in package deal
  • A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - Answer The phase angle will increase. When load is increased phase angle will increase. A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - Answer 90 pf= mw/mva The high side of a delta-wye connection transformer is connected ...
    (0)
  • $12.99
  • + learn more
SOS NERC Prep - Reliability Exam questions with complete solution 2023
  • SOS NERC Prep - Reliability Exam questions with complete solution 2023

  • Exam (elaborations) • 54 pages • 2023
  • Available in package deal
  • SOS NERC Prep - Reliability Exam questions with complete solution 2023The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease N...
    (0)
  • $30.49
  • + learn more
Practice Test NERC Questions with Correct Solutions| Rated A+
  • Practice Test NERC Questions with Correct Solutions| Rated A+

  • Exam (elaborations) • 27 pages • 2023
  • A transmission line is operating with a voltage phase angle different of 30 degrees between the sending Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle difference will be? - The phase angle will increase. When load is increased phase angle will increase. A load has a power factor of 0.9 lagging. If the load draws 100 MVA, what is the MW draw? - 90 pf= mw/mva The high side of a delta-wye connection transformer is connected to a pow...
    (0)
  • $11.99
  • + learn more
NERC PREP - BAL, INT, & TRANS TEST QUESTIONS AND ANSWERS
  • NERC PREP - BAL, INT, & TRANS TEST QUESTIONS AND ANSWERS

  • Exam (elaborations) • 15 pages • 2023
  • Available in package deal
  • b. NERC Operating Committee What group can approve a change in the Disturbance Recovery Period for an Interconnection? a. NERC Interconnection Working Group b. NERC Operating Committee c. NERC Regional Council d. NERC Disturbance Analysis Working Group c. Check targets and equipment What is the first thing an operator should do after a relay operation? a. Check power system stabilizers b. Notify adjacent Transmission and Balancing areas c. Check targets and equipment d. Notify t...
    (0)
  • $13.99
  • + learn more