Nccco 8 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco 8? On this page you'll find 92 study documents about Nccco 8.

Page 4 out of 92 results

Sort by

NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% correct answers a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump do...
    (0)
  • $14.99
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - ANS c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - ANS a. 3. The lo...
    (0)
  • $11.49
  • + learn more
NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A
  • NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A

  • Exam (elaborations) • 4 pages • 2024
  • NCCCO RIGGING 1 & 2 Final Exam Latest Updated Q&A OSHA 1910 - CORRECT ANSWER-General Industry Standards OSHA 1926 - CORRECT ANSWER-Construction Industry Standards OSHA 1910.180 - CORRECT ANSWER-Crawler, Locomotive and Truck Cranes OSHA 1910.184 - CORRECT ANSWER-Slings OSHA 1926.251 - CORRECT ANSWER-Rigging Equipment used for material handling OSHA 1926.1400 - CORRECT ANSWER-Cranes and Derricks used in construction ASME B30.3 - CORRECT ANSWER-Tower Cranes ASME B30.5 - CORRECT ANSWER-Mobi...
    (0)
  • $11.99
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% correct answers a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump down, feet...
    (0)
  • $14.49
  • + learn more
NCCCO 8 LATEST 2024 EXAM TEST BANK COMPLETE QUESTIONS WITH CORRECT DETAILED ANSWERS
  • NCCCO 8 LATEST 2024 EXAM TEST BANK COMPLETE QUESTIONS WITH CORRECT DETAILED ANSWERS

  • Exam (elaborations) • 4 pages • 2024
  • NCCCO 8 LATEST 2024 EXAM TEST BANK COMPLETE QUESTIONS WITH CORRECT DETAILED ANSWERS When crane is in transit and you are required to pass under 50kV power lines, what is OSHA's minimum required clearance: - Answer-6 feet The tipping axis of a crawler crane: - Answer-depends if the idler or sprocket are in line or offset from the track rollers As you boom down, the leverage of the load on the crane will: - Answer-increase Eccentric main boom tip reeving causes: - Answer-twisting of...
    (0)
  • $11.99
  • + learn more
NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct)

  • Exam (elaborations) • 16 pages • 2024
  • NCCCO Tower Crane Exam Questions and Answers Latest Update 2024/2025 (100% Correct) Hydraulic systems should have their proper fluid level checked - ANSWER Daily If power fails during operations, the following shouldn't apply - ANSWER Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - ANSWER Person responsible for lift Where should climbing inst...
    (0)
  • $14.99
  • + learn more
NCCCO MOBILE CRANE EXAM WITH  QUESTIONS AND CORRECT ANSWERS  [ACTUAL 100%]
  • NCCCO MOBILE CRANE EXAM WITH QUESTIONS AND CORRECT ANSWERS [ACTUAL 100%]

  • Exam (elaborations) • 24 pages • 2024
  • NCCCO MOBILE CRANE EXAM WITH QUESTIONS AND CORRECT ANSWERS [ACTUAL 100%] 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - ANS---c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% ...
    (0)
  • $20.99
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO MOBILE CRANE EXAM QUESTIONS AND ANSWERS LATEST 2024/2025 (100% CORRECT) What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom correct answers c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8%...
    (0)
  • $14.99
  • + learn more
NCCCO TWR Practice Test Study Guide  Exam with 100% Verified Answers
  • NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers 1. Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-OSHA 1926.550(g) 2. According to ASME B30.3, the prohibited zone for power lines that are 60kV is? - CORRECT ANSWER-15ft 3. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of? - CORRECT ANSWER-5 to 1 4. According to ASME B30.3, when lifting a suspended personnel platform the design fa...
    (0)
  • $13.99
  • + learn more
NCCCO MOBILE CRANE EXAM QUESTIONS WITH 100% ANSWERS
  • NCCCO MOBILE CRANE EXAM QUESTIONS WITH 100% ANSWERS

  • Exam (elaborations) • 24 pages • 2024
  • NCCCO MOBILE CRANE EXAM QUESTIONS WITH 100% ANSWERS 1. What Standard Method hand signal is being illustrated? a. Swing b. Stop c. Emergency Stop d. Travel correct answers a. 8. Who should an operator respond to a "stop" signal from? a. Appointed signal person only b. Project manager only c. Superintendent only d. Anyone correct answers d. 2. Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacturer states otherwise? a. T...
    (0)
  • $21.89
  • + learn more