Nccco core crane - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nccco core crane? On this page you'll find 149 study documents about Nccco core crane.
Page 4 out of 149 results
Sort by
-
NCCCO Core Test (New 2023/ 2024 Update) Practice Questions and 100% Correct Verified Answers| Grade A
- Exam (elaborations) • 22 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
NCCCO Core Test (New 2023/ 2024 Update) 
Practice Questions and 100% Correct Verified Answers| Grade A 
 
QUESTION 
 What happens to ground bearing pressure if you move a crawler crane from soft ground to 
harder ground? 
 
Answer: 
 It increases 
 
 
QUESTION 
 When may a swivel be used with rotation resistant wire rope? 
 
Answer: 
 If the rope manufacturer approves 
 
 
QUESTION 
 What should you do on pick and carry operations? 
 
Answer: 
 Keep the boom as short as possible 
 
 
QUEST...
-
NCCCO Certification of Crane Operators Core Exam Questions and Answers 100% Pass | Graded A+
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $15.09
- + learn more
NCCCO Certification of Crane Operators Core Exam Questions and Answers 100% Pass | Graded A+
-
NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $10.89
- + learn more
NCCCO Core Exam Prep (2023/ 2024 Update) Questions and 100% Correct Verified Answers| Grade A 
 
 
What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? - ANSWER Boom up 
 
 
 
When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? - ANSWER 1% 
 
 
 
Th...
-
NCCCO Exam Bundle (Graded A)
- Package deal • 26 items • 2023
-
- $40.99
- + learn more
Crane Operator Definitions & Acronyms Exam Questions and Answers


Exam (elaborations)
NCCCO 3 Exam Questions with correct Answers


Exam (elaborations)
Nccco 5 Exam Questions and Answers


Exam (elaborations)
NCCCO 6 Exam with correct Answers


Exam (elaborations)
NCCCO Acronyms Exam Questions and Answers


Exam (elaborations)
Nccco Core + Special
-
NCCCO CORE EXAM / NCCCO Core Exam 2023-2024 ACTUAL EXAM QUESTIONS AND CORRECT ANSWERS VERIFIED ANSWERS GRADED A+
- Exam (elaborations) • 27 pages • 2024
-
- $17.99
- + learn more
NCCCO CORE EXAM / NCCCO 
Core Exam 
ACTUAL EXAM QUESTIONS 
AND CORRECT ANSWERS 
VERIFIED ANSWERS GRADED 
A+ 
Mobile crane is more stable when: - ANSWER-The 
cranes leverage is greater than the load leverage 
Cranes that have been idle for _____ Months or more must 
be given a monthly inspection by a qualified person. - 
ANSWER-3 
Which of the following is an accurate statement about 
luffing jibs? - ANSWER-It raises and lowers 
independent from the boom 
What is the weakest quadrant of a boom t...
Want to regain your expenses?
-
NCCCO Certification of Crane Operators Core Exam Quiz Study Guide with Answers 100% Pass | Graded A+
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
NCCCO Certification of Crane Operators Core Exam Quiz Study Guide with Answers 100% Pass | Graded A+
-
NCCCO core 343 Questions with 100% Verified Correct Answers
- Exam (elaborations) • 28 pages • 2024
- Available in package deal
-
- $10.49
- + learn more
NCCCO core 343 Questions with 100% Verified Correct Answers 
If taking sides strain on a boom what concerns the operator the most - Correct Answers Boom damage 
 
If a crane load chart has capacities listed in the shaded area this means that - Correct Answers If overloaded structural confidence will be compromised 
 
As the layers of rope on a drum increase the allowable line Pull wil - Correct Answers Decrease 
 
Of the following actions which one will most likely cause a side load condition - ...
-
NCCCO CORE | Questions and Correct Solutions | Latest Update 2024/2025 | Graded A+
- Exam (elaborations) • 13 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NCCCO CORE | Questions and Correct 
Solutions | Latest Update 
2024/2025 | Graded A+ 
Before leveling a mobile crane on outriggers, an operator should 
ensure: - Answer -there is no weight of the crane bearing on any tires 
Operating a mobile crane with a long boom, on uneven ground, what 
support condition should be considered? - Answer -Keeping 90 degree 
angle between cylinder rod and pad 
What is the primary purpose fir a rooster sheave or auxiliary boom 
point sheave? - Answer -Separate the...
-
NCCCO CORE ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS |ALREADY GRADED A+ LATEST
- Exam (elaborations) • 14 pages • 2024
-
- $12.99
- + learn more
NCCCO CORE ACTUAL EXAM QUESTIONS 
AND CORRECT DETAILED ANSWERS 
|ALREADY GRADED A+ LATEST 
Which of the following is an auxillary boom, or extension of the 
main boom? - ANSWER jib 
All wire rope on a crane(hoist lines, boom hoist lines, pendant 
lines) have a standdardizied design safety factor of; - ANSWER 
will vary depending on the crane and application 
To avoid torosional loading, the boom tip sheaves should be 
reeved: - ANSWER symmetrical 
T or F 
When determining whether a crane i...
-
NCCCO TELESCOPIC BOOM CRANE—SWING CAB (TLL) For Use in CCO Written Examinations
- Exam (elaborations) • 18 pages • 2024
-
Available in package deal
-
- $14.99
- + learn more
NCCCO Telescopic Boom Crane -Core Winter 2024 Final Practice Exam Review Questions and Answers 100% Pass 
For Use in CCO Written Examinations
How much did you already spend on Stuvia? Imagine there are plenty more of you out there paying for study notes, but this time YOU are the seller. Ka-ching! Discover all about earning on Stuvia