Nccco tower crane test - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nccco tower crane test? On this page you'll find 43 study documents about Nccco tower crane test.

Page 4 out of 43 results

Sort by

NCCCO Core Test Prep (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct
  • NCCCO Core Test Prep (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct

  • Exam (elaborations) • 35 pages • 2023
  • NCCCO Core Test Prep (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct QUESTION With the boom at its highest angle and its shortest radius, how many wraps of wire rope need to be on the drum at all times? Answer: 2 QUESTION When measuring load radius of the crane. You measure from the axis of rotation of the crane to the ? Answer: Center of gravity of the load QUESTION What must be deducted from the gross capacity of t...
    (0)
  • $10.99
  • + learn more
NCCCO Overhead Crane Test (New 2023/ 2024 Update) Questions and Verified  Answers| Graded A| 100% Correct
  • NCCCO Overhead Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct

  • Exam (elaborations) • 22 pages • 2023
  • NCCCO Overhead Crane Test (New 2023/ 2024 Update) Questions and Verified Answers| Graded A| 100% Correct QUESTION What should an operator first determine before making a lift? Answer: weight of the load QUESTION A wire rope designated as 6 X 19 has? Answer: 6 strands with 19 wires QUESTION What is the safe working load (SWL) of a wire rope defined as? Answer: breaking strength divided by safety factor QUESTION What is the vertical movem...
    (0)
  • $10.49
  • + learn more
Tower Cranes NCCCO Study Guide Final  Exam with Verified Solutions
  • Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Tower Cranes NCCCO Study Guide Final Exam with Verified Solutions T or F Very few areas in either the US or Canada require certification to operate a tower crane - CORRECT ANSWER-false T or F Self erecting tower cranes are easier to erect than a conventional tower crane, but erection time takes longer - CORRECT ANSWER-false How does the crane rotate with a fixed tower base? - CORRECT ANSWER-slewing ring beneath the jib T or F A mono type of tower can be either fixed or slewing - ...
    (0)
  • $10.49
  • + learn more
NCCCO Tower Crane Exam Questions with Correct Answers
  • NCCCO Tower Crane Exam Questions with Correct Answers

  • Exam (elaborations) • 11 pages • 2024
  • NCCCO Tower Crane Exam Questions with Correct Answers Splices in rall tracks shall have - Answer-Smooth Joints Hydraulic systems should have their proper fluid level checked - Answer-Daily If power fails during operations, the following shouldn't apply - Answer-Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - Answer-Person responsible for l...
    (0)
  • $12.99
  • + learn more
NCCCO Technical Theory Test Tower Crane A04 EXAM SOLUTION
  • NCCCO Technical Theory Test Tower Crane A04 EXAM SOLUTION

  • Exam (elaborations) • 22 pages • 2024
  • NCCCO Technical Theory Test Tower Crane A04 EXAM SOLUTION
    (0)
  • $13.49
  • + learn more
NCCCO tower crane Questions With 100%Verified AnswersA+GRADED
  • NCCCO tower crane Questions With 100%Verified AnswersA+GRADED

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • NCCCO tower crane Questions With 100%Verified AnswersA+GRADED Splices in rall tracks shall have - correct answer...Smooth Joints Hydraulic systems should have their proper fluid level checked - correct answer...Daily If power fails during operations, the following shouldn't apply - correct answer...Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to ...
    (0)
  • $10.98
  • + learn more
Nccco Test Questions And Answers With Verified Solutions Rated A+
  • Nccco Test Questions And Answers With Verified Solutions Rated A+

  • Exam (elaborations) • 2 pages • 2024
  • Available in package deal
  • Nccco Test Questions And Answers With Verified Solutions Rated A+
    (0)
  • $9.49
  • + learn more
NCCCO Tower Crane Tests | 100% Correct Answers | Verified | Latest 2024 Version
  • NCCCO Tower Crane Tests | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 13 pages • 2024
  • Splices in rail tracks shall have - Smooth Joints Hydraulic systems should have their proper fluid level checked - Daily If power fails during operations, the following shouldn't apply - Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - Person responsible for lift Where should climbing instructions be kept - ON Site All climbing operations sh...
    (0)
  • $12.99
  • + learn more
NCCCO TOWER CRANE 2023-2024 TEST WITH 100% CORRECT ANSWERS
  • NCCCO TOWER CRANE 2023-2024 TEST WITH 100% CORRECT ANSWERS

  • Exam (elaborations) • 22 pages • 2024
  • NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORRECT ANSWERS NCCCO TOWER CRANE TEST WITH 100% CORREC...
    (0)
  • $27.99
  • + learn more
Nccco signal person test Questions and Answers 100% Pass
  • Nccco signal person test Questions and Answers 100% Pass

  • Exam (elaborations) • 7 pages • 2024
  • Nccco signal person test Questions and Answers 100% Pass continuously - ANSWER-during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements - ANSWER-if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a - ANSWER-OSHA's standard method crane hand signals would be located in the following designated person - ANSWER-according to asme b30.5 prior to qualifying all signal persons...
    (0)
  • $11.49
  • + learn more