Nerc ba test - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Nerc ba test? On this page you'll find 84 study documents about Nerc ba test.
Page 4 out of 84 results
Sort by
-
NERC Prep - Bal, Int, & Trans Test
- Exam (elaborations) • 12 pages • 2023
-
- $9.49
- + learn more
NERC Prep - Bal, Int, & Trans Test 
 
b. NERC Operating Committee - What group can approve a change in the Disturbance Recovery Period for an Interconnection? 
 a. NERC Interconnection Working Group 
 b. NERC Operating Committee 
 c. NERC Regional Council 
 d. NERC Disturbance Analysis Working Group 
c. Check targets and equipment - What is the first thing an operator should do after a relay operation? 
 a. Check power system stabilizers 
 b. Notify adjacent Transmission and Balancing areas 
 ...
-
NERC Reliability Test Bank | WITH COMPLETE SOLUTION 2023/24
- Exam (elaborations) • 32 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
NERC Reliability Test Bank | WITH COMPLETE SOLUTION 2023/24 
 
A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen instantaneously in the change of which of the following values? 
1. Actual Net Interchange 
2. Scheduled Frequency 
3. Scheduled Net Interchange 
4. Area Control Error 
 
1 & 4 
3 & 4 
1 & 3 
4 only - 1 & 4. 
 
Due to the loss of load in the area, the BA will have excess generation and the excess will be exported into the Interconne...
-
NERC Test Complete Questions And Answers With Latest Quiz
- Exam (elaborations) • 7 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
NERC Test Complete Questions And Answers With Latest Quiz 
According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ 60 minutes 
 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days 2 business days 
 
During restoration efforts load pick-ups should not exceed_____________ percentage of synchronized generation capacity 5%
-
Nerc Test Question and answers already passed 2023
- Exam (elaborations) • 7 pages • 2023
-
Available in package deal
-
- $12.99
- + learn more
Nerc Test Question and answers already passed 2023 
 
According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is less than_________________ - correct answer 60 minutes 
 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within how many days - correct answer 2 business days 
 
During restoration efforts load pick-ups should not exceed_____________ percentage of synchronized generation capacity - correct ans...
-
Nerc Test Questions and Answers
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
NERC Test Questions with Correct Answers 
 
What percentage of load gives a 1 Hz change in an island condition? - Correct Answer: 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Correct Answer: Nothing! ACE bias and interchange schedule will improve frequency 
 
If ACE is Zero, why not adjust generation to help frequency? - Correct Answer: Could overload equipment, this is a NERC violation 
 
When restoring from blackout conditio...
Too much month left at the end of the money?
-
NERC Test Questions| with complete solution
- Exam (elaborations) • 11 pages • 2023
-
- $9.49
- + learn more
NERC Test Questions| with complete solution 
 
What percentage of load gives a 1 Hz change in an island condition? - 6-10% (Think 6-10 day island vacation) 
If ACE is Zero but system Hz is off, what should a system operator do? - Nothing! ACE bias and interchange schedule will improve frequency 
If ACE is Zero, why not adjust generation to help frequency? - Could overload equipment, this is a NERC violation 
When restoring from blackout condition, what should be done with load? - All load b...
-
NERC Test Questions | ACTUAL QUESTION AND ANSWERS | UPDATED 2023/24
- Exam (elaborations) • 11 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
NERC Test Questions | ACTUAL QUESTION AND ANSWERS | UPDATED 2023/24 
 
What percentage of load gives a 1 Hz change in an island condition? - 6-10% (Think 6-10 day island vacation) 
If ACE is Zero but system Hz is off, what should a system operator do? - Nothing! ACE bias and interchange schedule will improve frequency 
If ACE is Zero, why not adjust generation to help frequency? - Could overload equipment, this is a NERC violation 
When restoring from blackout condition, what should ...
-
NERC RC Test with Complete Solution
- Exam (elaborations) • 6 pages • 2023
-
Available in package deal
-
- $7.39
- + learn more
NERC RC Test with Complete Solution 
 
System studies identify what -Answer Predict operations and identify constraints 
 
If ACE remains the same and frequency goes up what has happened? -Answer Someone lost load 
 
When a generator has its AVR in service it is a? -Answer Dynamic source of reactive power 
 
Black start resource testing is done every? -Answer 3 years 
 
Each BA shall operate its AGC on? -Answer Tie line Frequency Bias 
 
When is voltage reduction reportable? -Answer Greater than...
-
NERC Test Questions with 100% Verified Solutions( Rated A+)
- Exam (elaborations) • 22 pages • 2023
-
Available in package deal
-
- $12.99
- + learn more
What percentage of load gives a 1 Hz change in an island condition? - 6-10% (Think 6-10 day island vacation) 
 
If ACE is Zero but system Hz is off, what should a system operator do? - Nothing! ACE bias and interchange schedule will improve frequency 
 
If ACE is Zero, why not adjust generation to help frequency? - Could overload equipment, this is a NERC violation 
 
When restoring from blackout condition, what should be done with load? - All load breakers should be opened, load sho...
-
NERC PREP TEST 101 QUESTIONS AND ANSWERS (100% CORRECT SOLUTIONS)
- Exam (elaborations) • 73 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 MW, which of the following events would most likely occur? 
 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All automatic reactors would connect to the system 
a. Generator MVAR output would increase 
 
 
2. When system conditions are such that emergency procedures are expected to be implemented, which of the fo...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia