Overhead crane - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Overhead crane? On this page you'll find 579 study documents about Overhead crane.

Page 4 out of 579 results

Sort by

Massachusetts 1B Hoisting License Exam Prep Questions And Answers Latest Updated 2024/2025 | Scored A+
  • Massachusetts 1B Hoisting License Exam Prep Questions And Answers Latest Updated 2024/2025 | Scored A+

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • Massachusetts 1B Hoisting License Exam Prep Questions And Answers Latest Updated 2024/2025 | Scored A+. manufacturer's specification: all hoisting machinery shall be operated in accor- dance with the: 2.  inoperable and secure: maintenance repair and refueling shall be done when the machine is: 3.  daily: visual inspection shall be made of wire ropes, bearings, gears, friction clutches, brakes, chain drives and other parts subject to wear on all hoisting machinery to ens...
    (0)
  • $14.99
  • 1x sold
  • + learn more
NCCCO Overhead Crane Exam Questions Marking Scheme New Update (A+ Pass)
  • NCCCO Overhead Crane Exam Questions Marking Scheme New Update (A+ Pass)

  • Exam (elaborations) • 8 pages • 2024
  • NCCCO Overhead Crane Exam Questions Marking Scheme New Update (A+ Pass) Overhead cranes with more than one hoisting unit shall have? - Answers -Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? - Answers -Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? - Answers -Removes power to entire crane. Most loads should be rigged to within how many degrees of level? - Answers -5 According to ASME B30.2, what is...
    (0)
  • $10.99
  • + learn more
NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+
  • NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NCCCO Overhead Crane Exam Questions with 100% Verified Correct Answers Rated A+ Overhead cranes with more than one hoisting unit shall have what? - Correct Answer its rated load marked on it What is the purpose of the "E" (Emergency) stop on an overhead crane? - Correct Answer removes power to entire crane How often does O.S.H.A. require a written wire rope inspection? - Correct Answer once a month Most loads should be rigged to within how many degrees of level? - Correct Answer five...
    (0)
  • $10.49
  • + learn more
Overhead Crane Test Questions and Answers
  • Overhead Crane Test Questions and Answers

  • Exam (elaborations) • 7 pages • 2024
  • Overhead Crane Test Questions and Answers
    (0)
  • $10.99
  • + learn more
NCCCO OVERHEAD CRANE EXAM 2023-2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A
  • NCCCO OVERHEAD CRANE EXAM 2023-2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A

  • Exam (elaborations) • 15 pages • 2023
  • NCCCO OVERHEAD CRANE EXAM ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A
    (0)
  • $25.49
  • + learn more
NCCCO Overhead Crane Questions and answers with 100% correct solutions | A+ Grade
  • NCCCO Overhead Crane Questions and answers with 100% correct solutions | A+ Grade

  • Exam (elaborations) • 12 pages • 2024
  • Available in package deal
  • Overhead cranes with more than one hoisting unit shall have? Its rated load marked on it. How often does O.S.H.A. require a written wire rope inspection? Once a month What is the purpose of the "E" (Emergency) stop on an overhead crane? Removes power to entire crane. Most loads should be rigged to within how many degrees of level? 5 According to ASME B30.2, what is the safety factor for rigging? 5 to 1 According to O.S.H.A. frequent inspections shall be performed? Daily to monthly
    (0)
  • $13.48
  • + learn more
 NCCCO OVERHEAD CRANE EXAM (ACTUAL) 2024 QUESTIONS AND ANSWERS
  • NCCCO OVERHEAD CRANE EXAM (ACTUAL) 2024 QUESTIONS AND ANSWERS

  • Exam (elaborations) • 15 pages • 2024
  • NCCCO OVERHEAD CRANE EXAM (ACTUAL) 2024 QUESTIONS AND ANSWERS
    (0)
  • $12.99
  • + learn more
Module 6 NCCER into to Basic rigging questions with correct answers
  • Module 6 NCCER into to Basic rigging questions with correct answers

  • Exam (elaborations) • 6 pages • 2023
  • During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal? CORRECT ANSWER (Anyone on the ground who is in sight of the crane operator). The recommendation when lifting a load longer then __________ is to use two choker hitches. CORRECT ANSWER (12 feet) A hand-operated winching device that should never be used for vertical overhead lifting is a (CORRECT ANSWER come-along All chain hoists use a ____________ to lift heavy loads. CORRECT...
    (2)
  • $7.99
  • 9x sold
  • + learn more
NCCCO Overhead Crane Questions With Complete Solutions
  • NCCCO Overhead Crane Questions With Complete Solutions

  • Exam (elaborations) • 12 pages • 2023
  • NCCCO Overhead Crane Questions With Complete Solutions
    (0)
  • $10.99
  • + learn more
Overhead Crane Test  questions with correct answers.
  • Overhead Crane Test questions with correct answers.

  • Exam (elaborations) • 8 pages • 2024
  • its rated load marked on it - ANSWER - Overhead cranes with more than one hoisting unit shall have what? removes power to entire crane - ANSWER - What is the purpose of the "E" (Emergency) stop on an overhead crane? once a month - ANSWER - How often does O.S.H.A. require a written wire rope inspection? five - ANSWER - Most loads should be rigged to within how many degrees of level? 5 to 1 - ANSWER - According to ASME B30.2, what is the safety factor for rigging? d...
    (0)
  • $10.49
  • + learn more