Overhead crane test - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Overhead crane test? On this page you'll find 171 study documents about Overhead crane test.
Page 4 out of 171 results
Sort by
-
Cranes Exam With Correct Answers
- Exam (elaborations) • 13 pages • 2024
-
- $9.49
- + learn more
How many months at a maximum do personnel have to qualify as a maintenance technician? -Answer 3 
 
Floating cranes, aircraft-crash cranes, and virtually all pierside cranes are under the cognizance of what? -Answer NAVFAC 
 
What is a shock absorbing device installed to cushion the impact of contacting a posotive stop? -Answer bumper 
 
Which type of lifts require additional attention in operational areas such as selection, training, and qualification of crane crew members, organization and ...
-
NCCO CORE EXAM 1 Questions and Answers
- Exam (elaborations) • 45 pages • 2024
-
Available in package deal
-
- $12.00
- + learn more
An outrigger float should be approximately how much larger that the outrigger pad? 
3 times 
Where should the slings be attached when lifting lattice boom sections? 
use the end connections 
When assembling lattice boom sections, which set of pins are installed first? 
both upper 
When installing the boom pins, the pin should be pointing; 
out away from boom center 
When dismantling a lattice boom, which boom pins should be removed first? 
both lower 
What position should the gantry of a crane b...
-
Crane Safety Practice Questions with Solutions 2024
- Exam (elaborations) • 7 pages • 2024
-
- $17.99
- + learn more
Crane Safety Practice Questions with Solutions 2024 
Which of the following conditions or activities create hazardous crane operational situations? 
a. High wind 
b. Following standard signals from only one signal person 
c. Using synthetic slings 
d. Leveling machine to within 1% level 
High wind 
 
 
 
Which of the following equipment types is covered by the OSHA Subpart CC standard? 
a. Bucket trucks 
b. Excavators 
c. Crawler Cranes 
d. Fork lifts 
c. Crawler cranes 
 
 
 
A_________________...
-
TOWER CRANE QUESTIONS AND ANSWERS.
- Exam (elaborations) • 11 pages • 2023
- Available in package deal
-
- $13.49
- + learn more
Which of the following OSHA regulations govern suspended personnel platforms? 
OSHA 1926.1431 
 
 
 
According to ASME B30.3 The prohibited zone for power lines that are 60 kV is 
15 ft 
 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:05 
/ 
0:15 
Full screen 
According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of 
5 to 1 
 
 
 
According to ASME B30.3 when Lifting a suspended personnel platform design fa...
-
NCCCO CORE EXAM – 119 QUESTIONS WITH VERIFIED SOLUTIONS
- Exam (elaborations) • 10 pages • 2023
- Available in package deal
-
- $13.99
- + learn more
Before leveling a mobile crane on outriggers, an operator should ensure: 
 
 
there is no weight of the crane bearing on any tires 
 
 
 
1 / 119 
 
 
Profile Picture 
Created by 
krista_jansky 
 
Share 
 
Students also viewed 
NCCCO Core Prep Test 
Teacher 
178 terms 
Profile Picture 
ITSA-Teacher 
 
Preview 
NCCCO MOBILE CRANE 
99 terms 
Profile Picture 
Mari_Cela_Fer 
 
Preview 
Nccco core 
343 terms 
Profile Picture 
Max_Marino8 
 
Preview 
Nccco core 
343 terms 
Profile Picture 
mastersolut...
Get paid weekly? You can!
-
Cranes 2023 (Possible questions with A+ Graded answers)
- Exam (elaborations) • 18 pages • 2023
-
- $13.49
- + learn more
How many months at a maximum do personnel have to qualify as a maintenance technician? correct answers 3 
 
Floating cranes, aircraft-crash cranes, and virtually all pierside cranes are under the cognizance of what? correct answers NAVFAC 
 
What is a shock absorbing device installed to cushion the impact of contacting a posotive stop? correct answers bumper 
 
Which type of lifts require additional attention in operational areas such as selection, training, and qualification of crane crew membe...
-
Rigging Test Questions | Latest Update | 2024/2025 | Graded A+
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $9.73
- + learn more
Rigging Test Questions | Latest Update | 
 
2024/2025 | Graded A+ 
 
A four-point hook up is being used to lift 4000 Ibs. using a spreader bar such that the legs are 
vertical with exact same length slings. With each leg carrying an equal load, what is the stress on 
each sling? 1000 Ibs. 
 
a knot that is used to form a loop at any point in the rope between its ends is called a: 
bowline in a bight 
 
a shoulder type eyebolt must be used when you need to: put an angular pull on an eyebolt 
 
a ...
-
Massachusetts 2a Hoisting License Questions With Verified Answers Latest Updated 2024/2025 | Scored A+
- Exam (elaborations) • 21 pages • 2024
-
Available in package deal
-
- $14.49
- + learn more
Massachusetts 2a Hoisting License Questions With Verified Answers Latest Updated 2024/2025 | Scored A+. What is the prefered sling angle: answer- 60* 
4. The top of the spoil pile is called: answer- The crown 
5. A four footbdeep trench requires an additional ladder for each _ of open 
trench: answer- 25ft 
6. Materials mist be kept back from the edge of the trenxh a minimum of: 
answer- Two feet 
7. When can inspector revoke a hoistinf licence: answer- Failure to pay excise 
tax 
8. Who develop...
-
NCCCO CORE SAMPLE TEST QUESTIONS AND ANSWERS 2024
- Exam (elaborations) • 8 pages • 2023
- Available in package deal
-
- $14.49
- + learn more
A frequent inspection is: 
Daily to monthly 
 
 
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
Boom Up 
(Appendix A to Subpart CC of Part 1926--Standard Hand Signals) 
 
 
 
Brainpower 
Read More 
Previous 
Play 
Next 
Rewind 10 seconds 
Move forward 10 seconds 
Unmute 
0:00 
/ 
0:00 
Full screen 
2. When hoisting personnel, within what percentage of level must a telescopic bo...
-
Michigan residential builders license maintenance and alterations 2 practice exam with verified solutions
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
Between $110,000 and $120,000 
In the previous year, a company had revenues of $500,000, project overhead of $40,000 and company overhead of $75,000. The company expects the percentage for project and company overhead to remain the same for the current year. The company desires to make a 10% profit on a project it is bidding. The project would have $80,000 in direct costs. What should the bid price be? 
 
 
 
Failing to disclose one subcontractor's bid to another 
Which of the following is cons...
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia