Peak hour demand Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Peak hour demand? On this page you'll find 908 study documents about Peak hour demand.
Page 4 out of 908 results
Sort by
![SOS NERC Prep - Reliability Exam (Fall 2023)](/docpics/3551040/651c3f5386b4f_3551040_121_171.jpeg)
-
SOS NERC Prep - Reliability Exam (Fall 2023)
- Exam (elaborations) • 51 pages • 2023
- Available in package deal
-
- $18.49
- + learn more
SOS NERC Prep - Reliability Exam (Fall 2023) A step-down transformer has a 2 to 1 turn ratio. If the power flowing into the high side of the transformer is 140 MWs, what is the power flowing out? A) 150 MWs B) 140 MWs C) 280 MWs D) 70 MWs Voltage of a 345 kV transmission line is at 90% of normal. If you energize a capacitor rated at 100 MVar, what will be the actual MVars gained? A) 50 MVars B) 81 MVars C) 90 MVars D) 30 MVars If generators are supplying reactive power to the system, the genera...
![Food Manager Practice Test Questions & Answers 100% Accurate](/docpics/4309001/65aff4954b5ff_4309001_121_171.jpeg)
-
Food Manager Practice Test Questions & Answers 100% Accurate
- Exam (elaborations) • 20 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
A food worker at bar was diagnosed with E. coli and has not shown symptoms for a couple of days. What must her manager do? 
a. restrict until regulatory approval is obtained 
b. Exclude until regulatory approval is obtained 
c. allow the worker to resume her normal duties 
d. require her to wear single-use gloves at all times. - Answer a. restrict until regulatory approval is obtained 
 
A large container of potato salad has been removed from cold holding at the correct temperature. How long can...
![EMC Test Q&A 2023](/docpics/3354333/64f25284b87db_3354333_121_171.jpeg)
-
EMC Test Q&A 2023
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
The average cost per kilowatt hour in the summer is? - Answer- 8 cents 
 
the average cost kilowatt hour per kilowatt hour in the winter is? - Answer- 6 cents 
 
What is Plant Doyle? - Answer- a large natural gas fired generating plant the produces electricity to meet peak summer demand. 
 
Most of the electricity produced by Oglethorpe power for member EMCs is generated in? - Answer- Coal burning steam plants. 
 
WEMC first natural gas turbines went on the line at a generation facility in what ...
![STATE FOOD SAFETY |80 QUESTIONS WITH COMPLETE VERIFIED SOLUTIONS|GUARANTEED SUCCESS](/docpics/3689336/6538315a763a3_3689336_121_171.jpeg)
-
STATE FOOD SAFETY |80 QUESTIONS WITH COMPLETE VERIFIED SOLUTIONS|GUARANTEED SUCCESS
- Exam (elaborations) • 23 pages • 2023
- Available in package deal
-
- $15.99
- + learn more
A Food Worker at a bar was diagnosed with E. Coli and has not shown symptoms for a couple of days. What must her manager do? 
A) Restrict until Regulatory approval is obtained 
B) Exclude until Regulatory approbal is obtained 
C) Allow the worker to resume her normal duties 
D) Require her to wear single-used gloves at all times 
A) Restrict until Regulartory approval is obtained 
 
 
 
A large container of potato salad has been removed from cold holding at the correct temperature. How long can ...
![AWS Certified Solutions Architect - Associate Practice Questions& ANSWERS ALL SOLUTION LATEST UPDATE 2024 GUARANTEED GRADE A+](/docpics/3964704/656eda3d0af89_3964704_121_171.jpeg)
-
AWS Certified Solutions Architect - Associate Practice Questions& ANSWERS ALL SOLUTION LATEST UPDATE 2024 GUARANTEED GRADE A+
- Exam (elaborations) • 65 pages • 2023
-
- $13.39
- + learn more
Amazon Glacier is designed for: (Choose 2 answers) 
 
A. active database storage. 
B. infrequently accessed data. 
C. data archives. 
D. frequently accessed data. 
E. cached session data. 
B. infrequently accessed data. 
C. data archives. 
Your web application front end consists of multiple EC2 instances behind an Elastic Load Balancer. You 
configured ELB to perform health checks on these EC2 instances. If an instance fails to pass health 
checks, which statement will be true? 
 
A. The instanc...
![AAAE CM Exam Module 1 Questions and Answers](/docpics/5214533/6639b24be6ef6_5214533_121_171.jpeg)
-
AAAE CM Exam Module 1 Questions and Answers
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $12.48
- + learn more
AAAE CM Exam Module 1 Questions and Answers 
The number of days an airport operator has to report a Part 139 deviation? - Answer ️️ -14 
days 
What is a form 5010? - Answer ️️ -"Airport Data and Information Program" - info pilots use 
before and during their flight to familiarize themselves with the airport. Changes to the airport 
(issues more serious than NOTAMS), significant changes to landing areas, and instrument 
approaches should all be in Form 5010. 
Purpose of Airport System P...
![AAAE CM Exam Module 1 Questions and Answers](/docpics/5214542/6639b2882e7fd_5214542_121_171.jpeg)
-
AAAE CM Exam Module 1 Questions and Answers
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $12.48
- + learn more
AAAE CM Exam Module 1 Questions and Answers 
The number of days an airport operator has to report a Part 139 deviation? - Answer ️️ -14 
days 
What is a form 5010? - Answer ️️ -"Airport Data and Information Program" - info pilots use 
before and during their flight to familiarize themselves with the airport. Changes to the airport 
(issues more serious than NOTAMS), significant changes to landing areas, and instrument 
approaches should all be in Form 5010. 
Purpose of Airport System P...
![NERC RC Exam (Latest Update 2024) Questions and Answers](/docpics/3605160/6527200fe4faf_3605160_121_171.jpeg)
-
NERC RC Exam (Latest Update 2024) Questions and Answers
- Exam (elaborations) • 17 pages • 2023
- Available in package deal
-
- $10.99
- + learn more
Common standard time period for station battery to handle outage of AC power to chargers 
8-12 hours 
 
 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed unsuccessful 
2 hours 
 
 
Transition period to backup control facility (fully functioning) 
2 hours 
 
 
Annual testing of backup control facility must prove to be functional for this long 
2 hours 
 
 
Every 2 years TO/TOP/DSP must provide how many hours of system restoration training to field switching pe...
![NERC book quiz Questions and Answers (100% Correct Elaborations)](/docpics/3604965/65271569801f1_3604965_121_171.jpeg)
-
NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
- Available in package deal
-
- $10.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
![CPIM Practice Questions & Answers Solved 100%](/docpics/4323743/65b1b83a49ad2_4323743_121_171.jpeg)
-
CPIM Practice Questions & Answers Solved 100%
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
Creating an extensive distribution system in order to reduce shipment time to customers conflicts with which of the following objectives? - Answer Lowest distribution costs 
 
Which is set up when a product is available from several sources but only one source gets all of the business? - Answer Single-Source Supplier 
 
Which originated with the department or person who will be the ultimate user - Answer Purchase requisition 
 
Which of the following provides insight into why the acquisition cos...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
That summary you just bought made someone very happy. Also get paid weekly? Sell your study resources on Stuvia! Discover all about earning on Stuvia