Pjm generator exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Pjm generator exam? On this page you'll find 73 study documents about Pjm generator exam.

Page 4 out of 73 results

Sort by

PJM Exam Questions and Answers 100% Correct
  • PJM Exam Questions and Answers 100% Correct

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • PJM Exam Questions and Answers 100% Correct During reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO - Correct Answer ️️ -TO Generation available within 10 minutes for offline reserve units: Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? - Correct Answer ️️ -20 MVA Minimum MVARs for an aggr...
    (0)
  • $12.49
  • + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.

  • Exam (elaborations) • 39 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kVRead More When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
    (0)
  • $12.99
  • + learn more
PJM Generation Operation Exam 2024  with Verified Solutions
  • PJM Generation Operation Exam 2024 with Verified Solutions

  • Exam (elaborations) • 11 pages • 2024
  • Available in package deal
  • PJM Generation Operation Exam 2024 with Verified Solutions Control center facilities must have a minimum of how many days of fuel for the backup generator? 5 days If PJM ACE shows overgeneration, actual imports are: Less than scheduled Who should a generator contact at PJM to clear an outage ticket? Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: +/-.02 Hz What frequency would PJM set to correct for fast-time error? 59.98Hz ...
    (0)
  • $9.99
  • + learn more
PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions)
  • PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions)

  • Exam (elaborations) • 40 pages • 2024
  • Available in package deal
  • PJM Generation Dispatch Exam - Questions and Answers (Complete Solutions) Which of the following statements is correct concerning PJM assuming frequency control of the restoration process? A) PJM assumes control once an external transmission tie has been established. B) Once an Area Control Error can be calculated, PJM will assume control. C) Whenever it becomes too much of a burden for any one Transmission Owner within the RTO D) Whenever the Transmission Owners within the RTO agree to let PJ...
    (0)
  • $27.49
  • + learn more
PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024.

  • Exam (elaborations) • 39 pages • 2024
  • PJM Transmission Exam Study Guide | Questions with 100% Correct Answers | Verified| Latest Updated 2024. During System Restoration, what is the optimal Frequency Range? 59.75 - 61 Hz The 500 kV system has normal bus voltages between? 500 to 550 kVRead More When Connecting 2 islands, the operator must match? Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) 30 MW Gen/mile of energized 500 kV and 20 MW Load/mile of energi...
    (0)
  • $12.99
  • + learn more
PJM Exam Questions and Answers 100% Correct
  • PJM Exam Questions and Answers 100% Correct

  • Exam (elaborations) • 16 pages • 2024
  • Available in package deal
  • PJM Exam Questions and Answers 100% Correct During reactive testing, which entity must give approval to change an approved voltage schedule? PJM, TOP, MOC, GO - Correct Answer ️️ -TO Generation available within 10 minutes for offline reserve units: Quick-start (hydro), manual, operating, supplemental - Correct Answer ️️ -Quick-start (hydro) Minimum MVARs for an individual generator that is required to do reactive testing? - Correct Answer ️️ -20 MVA Minimum MVARs for an aggr...
    (0)
  • $12.49
  • + learn more
PJM Generation Dispatcher Exam Practice Questions and Answers 2023 Verified 100%
  • PJM Generation Dispatcher Exam Practice Questions and Answers 2023 Verified 100%

  • Exam (elaborations) • 5 pages • 2023
  • PJM Generation Dispatcher Exam Practice Questions and Answers 2023 Verified 100%
    (0)
  • $11.49
  • 1x sold
  • + learn more
PJM Transmission Exam Study Questions and Answers
  • PJM Transmission Exam Study Questions and Answers

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • PJM Transmission Exam Study Questions and Answers During System Restoration, what is the optimal Frequency Range? - Correct Answer ️️ -59.75 - 61 Hz The 500 kV system has normal bus voltages between? - Correct Answer ️️ -500 to 550 kV When Connecting 2 islands, the operator must match? - Correct Answer ️️ -Voltage, Phase Angle and Frequency What are the Minimum Source Requirements for a 500kV line? (Gen/mile and load/mile) - Correct Answer ️️ -30 MW Gen/mile of energized...
    (0)
  • $13.49
  • + learn more
PJM Generation Dispatcher Exam Practice - Questions and Answers
  • PJM Generation Dispatcher Exam Practice - Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • Available in package deal
  • PJM Generation Dispatcher Exam Practice - Questions and Answers An EXCITER on a traditional generator does what? Voltage regulation (AVR) if you change the excitation current, you change the voltage. ECO Min, ECO Max, and EMERG Max are generator _________________. Limits When synchronizing to the interconnection, what needs to be synchronized? Frequency, Voltage, and phase angle. GMD (GeoMagnetic Disturbance) procedure is implemented when? 10A or greater is measured by special equipment at Mis...
    (0)
  • $13.49
  • + learn more
PJM Generator Exam with complete solution
  • PJM Generator Exam with complete solution

  • Exam (elaborations) • 6 pages • 2023
  • Available in package deal
  • PJM Generator Exam with complete solution
    (0)
  • $7.99
  • + learn more