Plumbing level 2 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Plumbing level 2? On this page you'll find 605 study documents about Plumbing level 2.
Page 4 out of 605 results
Sort by
-
PLUMBING QUESTIONS AND ANSWERS | LATEST UPDATE | 2024/2025 | RATED A+
- Exam (elaborations) • 97 pages • 2024
-
- $11.47
- + learn more
PLUMBING QUESTIONS AND ANSWERS 
| LATEST UPDATE | 2024/2025 | RATED 
 
A+ 
 
What is the main purpose of a P-trap in plumbing? 
The P-trap prevents sewer gases from entering a building by creating a water seal. 
 
Why is it important to install vent pipes in a plumbing system? 
Vent pipes allow air to enter the plumbing system, preventing vacuum and ensuring proper 
drainage. 
 
What is the function of a shut-off valve in plumbing? 
The shut-off valve controls the flow of water, allowing the wat...
-
Plumbing Exam Questions and Answers 2024
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $14.49
- + learn more
Plumbing Exam Questions and Answers 2024 
A journeyman plumber and an apprentice, who are employed by a master plumber, are 
installing the DWV-system and water distribution system in a 2-½ story single family dwelling. 
QUESTION: What answer below shall be considered most correct to complete the following 
"Plumbing code knowledge" related statement: A trap that serves a single shower stall that is 
equipped with a hand shower, a rain head, and a standard shower head shall be no less than 
_...
-
Backflow Prevention Assembly Tester Exam V3 (Latest 2024/ 2025) Questions and Verified Answers| 100% Correct| Grade A
- Exam (elaborations) • 21 pages • 2024
-
Available in package deal
-
- $10.99
- + learn more
Backflow Prevention Assembly Tester Exam V3 (Latest 2024/ 2025) Questions and Verified Answers| 100% Correct| Grade A 
 
Q: A defensible backflow prevention program will maintain records on which of the following 
 
 
Answer: 
D. All of the above 
 A: backflow prevention assemblies within the system 
 B: complete list of certified backflow assembly testers 
 C: back flow prevention test reports 
 
 
 
Q: In responding to a potential backflow incident, the water purveyor must 
 
 
Answer: 
D. Im...
-
Revit Questions and Answers with Verified Solutions
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Revit Questions and Answers with 
 
Verified Solutions 
 
what does BIM stand for? Building Information Modeling 
 
what are the 2 things you can do in BIM? 1. build a model 
2. extract (take out) info from the model 
 
what best describes BIM? a building is modeled on a computer software three dimensionally 
and information is assigned to the components of the building that can be extracted from the 
model 
 
what is a parametric program? when an element's location is modified, adjacent elemen...
-
Building Utilities (Plumbing) Exam Questions and Answers
- Exam (elaborations) • 12 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Building Utilities (Plumbing) Exam 
Questions and Answers 
January 28, 1959 -Answer-National Plumbing Code of the Philippines ,prepared by 
NAMPAP, was promulgated and approved by Malacañang. Also, NAWASA was also 
created. 
Alter or Alteration -Answer-Any change, addition, or modification in construction or 
occupancy. 
Water Source -Answer-A place where water comes from, especially under the ground. 
Well -Answer-Deep hole drilled or dug into the ground to reach a reservoir of 
groundwater. 
...
Make study stress less painful
-
RECA Residential Exam 2023 Guide Correct 100%Fiduciary Representation - ANSWER - Trust and confidence - Best interests - Loyalty 5 Ds of Role Clarity - ANSWER 1. Discuss 2. Determine 3. Document 4. Disclose 5. Do Must disclose in writing - ANSWER - the
- Exam (elaborations) • 20 pages • 2023
-
- $10.39
- 1x sold
- + learn more
Fiduciary Representation - ANSWER - Trust and confidence 
- Best interests 
- Loyalty 
 
5 Ds of Role Clarity - ANSWER 1. Discuss 
2. Determine 
3. Document 
4. Disclose 
5. Do 
 
Must disclose in writing - ANSWER - the nature of services provided 
- whether professional has entered into representation relationship with other party 
- any conflicts of interest 
- any other facts that may influence consumers decision to proceed with relationship 
 
made to clarify and provide proof of undertandin...
-
Backflow Prevention Practice Exam Questions and Answers 2024 Graded A.
- Exam (elaborations) • 34 pages • 2024
- Available in package deal
-
- $12.99
- + learn more
Backflow Prevention Practice Exam Questions and Answers 2024 Graded A. 
A backflow preventer creates a closed plumbing system that 
requires the installation of a(n) _____? 
A. Expansion tank 
B. Globe valve 
C. Pressure reducing valve 
D. Temperature and pressure relief valve 
E. Utility box key - ANSWER Expansion tank 
A barometric loop must be installed 35 ft (10.7 m) above the highest 
____? 
A. Boiler 
B. Fixture outlet 
C. Gate valve 
D. Service connection 
E. Water meter - ANSWER Fixture ...
-
Journeyman Plumbing Test Study Guide Questions and Answers Rated A+
- Exam (elaborations) • 45 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
Journeyman Plumbing Test Study Guide Questions and Answers Rated A+ more restrictive provisions apply where conflicts occur between code and manufacture instructions. 
what shall be 3rd party certified as conforming to NSF 14 all plastic pipe, fittings and components. 
all strainer plates on drain inlets shall be designed and installed so that all openings are..? not greater than 1/2 inch (12.7) in least dimension. 
pipes through foundation walls need..? a relieving arch or a pipe sleeve which i...
-
Plumbing Level 1 Module 2 with 100% correct answers | verified | latest updated 2024
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
Plumbing Level 1 Module 2 with 100% correct answers | verified | latest updated 2024
-
BOMI - Design and Op I Key Concepts Chapters 1-8 Questions And Answers With Verified Solutions
- Exam (elaborations) • 31 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
0-20 DB Sound Level - Loudness: Very Faint 
Source: Whisper (5) 
100-200 DB Sound Level - Loudness: Deafening 
Source: Generator (5) 
20-40 DB Sound Level - Loudness: Faint 
Source: Quiet Conversation (5) 
4 Primary Project Delivery Methods - - Design Bid Build 
- Design Build 
- CMAR 
- Multiple Prime Contracts (2) 
4 Types of Shifting - Settlement, Upheaval, Sliding, Liquefaction. (4) 
40-60 DB Sound Level - Loudness: Moderate 
Source: Average Conversation (5) 
60-80 DB Sound Level - Loudness:...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia