Tie line frequency bias - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Tie line frequency bias? On this page you'll find 205 study documents about Tie line frequency bias.
Page 4 out of 205 results
Sort by
-
SOS NERC Prep - RElIABILITY Exam| 200 QUESTIONS AND ANSWERS | GRADED A
- Exam (elaborations) • 109 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decrease Net Interchange Schedule by 20 MWs. 
 
D) Increase Net Interchange Sche...
-
EPRI Chapter Test Questions with Verified Solutions
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
EPRI Chapter Test Questions with Verified Solutions If a generator is producing 500MW and 200Mvar, the generator is: Lagging 
87 Is the IEEE device number for a differential relay. 
Can a Synchronous machine have a negative torque angle? What doies this mean? Yes, the machine is absorbing active power. 
A customer load is fed at 12o Volts. The customer's voltage is doubled while the load magnitude stays the same. What effect does this have on the power losses? Decreases the losses by a factor o...
-
SOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution
- Exam (elaborations) • 49 pages • 2023
- Available in package deal
-
- $9.99
- + learn more
SOS NERC Prep - RElIABILITY Exam | latest 2023/24 with complete solution 
 
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
 
A) Increase Net Interchange Schedule by 20 MWs. 
 
B) Inform the Reliability Coordinator that you cannot participate in the time error correction. 
 
C) Decr...
-
NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
- $10.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
-
NERC Study test in depth Examination and 100% correctly verified Solutions Latest version 2023/2024
- Exam (elaborations) • 12 pages • 2024
-
Available in package deal
-
- $11.49
- + learn more
NERC Study test in depth Examination and 100% correctly verified Solutions Latest version 2023/2024 
 
What type of relay is relay 21? - correct answer Distance relay 
 
Each BA shall operate its AGC on? - correct answer Tie-line frequency bias 
 
What type of relay is relay 64 - correct answer Ground relay 
 
If ACE is 50 before a disturbance it must return to______________ - correct answer 0 
 
An_____________is a contract between a PSE and another party to purchase or sell energy - co...
And that's how you make extra money
-
NERC SOS QUIZ QUESTIONS WITH 100% CORRECT ANSWERS.
- Exam (elaborations) • 46 pages • 2023
-
- $14.49
- + learn more
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing Authority is not permitted to provide which of the following for any other Balancing Authority entities? 
Regulation of other services related to control performance 
 
 
 
1. It is the obligation of each Balancing Authority to fulfill its commitment to the Interconnection and not ________ the other balancing Authorities in the Interconnection 
Burden 
 
 
 
A Balancing Authority is performing Overlap R...
-
NERC RC questions with correct answers
- Exam (elaborations) • 7 pages • 2023
- Available in package deal
-
- $13.49
- + learn more
System studies identify what CORRECT ANSWER Predict operations and identify constraints 
 
If ACE remains the same and frequency goes up what has happened? CORRECT ANSWER Someone lost load 
 
When a generator has its AVR in service it is a? CORRECT ANSWER Dynamic source of reactive power 
 
Black start resource testing is done every? CORRECT ANSWER 3 years 
 
Each BA shall operate its AGC on? CORRECT ANSWER Tie line Frequency Bias 
 
When is voltage reduction reportable? CORRECT ANSWER Greater t...
-
NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS
- Exam (elaborations) • 17 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS 
 You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? Answer--4MW 
 
Net actual interchange minus Net scheduled interchange is what? Answer-Inadvertent interchange 
 
Suppose your interconnection operators a...
-
HSI Final Test Questions with Correct Answer Latest Update
- Exam (elaborations) • 20 pages • 2024
- Available in package deal
-
- $16.49
- + learn more
HSI Final Test Questions with Correct Answer Latest Update 
 
 
Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and your AGC is pulsing your units down . What should you do 
 
•Leave AGC in operation but investigate 
•Place AGC in constant frequency control 
•Place AGC in flat tie line control 
•Suspend AGC and investigate - Answer-•Suspend AGC and investigate 
 
When a Balancing Authority's ACE value is the same sign as the frequency deviation , which NERC ...
-
NERC RC Test with Complete Solution
- Exam (elaborations) • 6 pages • 2023
- Available in package deal
-
- $7.99
- + learn more
System studies identify what -Answer Predict operations and identify constraints 
If ACE remains the same and frequency goes up what has happened? -Answer Someone lost 
load 
When a generator has its AVR in service it is a? -Answer Dynamic source of reactive power 
Black start resource testing is done every? -Answer 3 years 
Each BA shall operate its AGC on? -Answer Tie line Frequency Bias 
When is voltage reduction reportable? -Answer Greater than 3% 
Reactors do what? -Answer Absorb VARs 
What...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia