When backfilling - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about When backfilling? On this page you'll find 118 study documents about When backfilling.
Page 4 out of 118 results
Sort by
-
2a Hoisting license Exam Questions With Correct Answers.
- Exam (elaborations) • 18 pages • 2024
-
- $11.49
- + learn more
2a Hoisting license Exam Questions With 
Correct Answers. 
What is the purpose of the swing gear on an excavator - answerIt connects the car body to the 
tracks 
Who is responisble for inspecting a trench before anyone goes in it - answerThe equipment 
operator 
What is the prefered sling angle - answer60* 
The top of the spoil pile is called - answerThe crown 
A four footbdeep trench requires an additional ladder for each _ of open trench - answer25ft 
Materials mist be kept back from the edge ...
-
NASCLA Commercial Building Exam Questions with 100% Correct Answers
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NASCLA Commercial Building Exam 
Questions with 100% Correct Answers 
What is the minimum ceiling height for means of Egress? - answerNot less than 7 feet 6 
inches 
Emergency Power must illuminate for how long? - answerNo less than 90 minutes 
Elevators are required in a building with how many stories? - answerMore than 3 (or at 
least 4). 
What is the size of the refuge space for one wheel chair? - answer30 inches by 48 inches 
Each area of refuge shall be separated from the remainder of the s...
-
Kentucky UST Certification Exam Review Questions and Verified Answers Update 2024-2025 (100% VERIFIED)
- Exam (elaborations) • 43 pages • 2024
- Available in package deal
-
- $17.49
- + learn more
Kentucky UST Certification Exam Review Questions and Verified Answers Update (100% VERIFIED) When you are lifting a tank, using the lifting lugs, which of these procedures 
should be followed? - correct answers attach a triangle cable through the 
lugs with no more than a 30 degree angle from the center line. 
After you unload a new tank on a clean level surface at the job site what else 
should you do prior to inspection and pre-testing? - correct answers 
Chock the tank to prevent it from Rol...
-
NASCLA Commercial Building Exam 100% Solved
- Exam (elaborations) • 18 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
NASCLA Commercial Building Exam 100% 
Solved 
What is the minimum ceiling height for means of Egress? -answer Not less than 7 feet 6 
inches 
Emergency Power must illuminate for how long? -answer No less than 90 minutes 
Elevators are required in a building with how many stories? -answer More than 3 (or at 
least 4). 
What is the size of the refuge space for one wheel chair? -answer 30 inches by 48 inches 
Each area of refuge shall be separated from the remainder of the story by what? -answer 
S...
-
2a Hoisting license Exam Questions With Complete Solutions (Verified And Updated)
- Exam (elaborations) • 11 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
2a Hoisting license Exam Questions With 
Complete Solutions (Verified And Updated) 
What is the purpose of the swing gear on an excavator - answerIt connects the car body to 
the tracks 
Who is responisble for inspecting a trench before anyone goes in it - answerThe equipment 
operator 
What is the prefered sling angle - answer60* 
The top of the spoil pile is called - answerThe crown 
A four footbdeep trench requires an additional ladder for each _ of open trench - answer25ft 
Materials mist be...
Fear of missing out? Then don’t!
-
Site Engineering for Landscape Architects (Strom, Nathan, Woland) 2023/2024
- Exam (elaborations) • 9 pages • 2023
-
Available in package deal
-
- $15.49
- + learn more
Site Engineering for Landscape Architects (Strom, Nathan, Woland)A grading plan should show; - correct answer All existing and proposed features of the site. Including: all buildings, structures, walls, walks, steps, roads, utilities lines, utility structures, and underground structures. 
 
spot elevations are used to supplement contours in 6 situations: - correct answer 1. To indicate variations from the normal slope between contour lines. 
2. To indicate elevations of intersecting planes (buil...
-
Kentucky UST Certification Exam Practice Questions With 100% Verified Answers | Latest Update 2023/2024
- Exam (elaborations) • 43 pages • 2023
-
- $23.49
- + learn more
when installing a steel tank which has zinc anodes welded directly onto the 
tank for cathodic protection you should - correct answers remove the 
plastic wrapping around the anodes prior to installation 
if local authorities and tank manufacturers permit a sand slurry mixture to 
be used for backfilling a tank what steps should be taken to ensure that use 
of the slurry is proper? - correct answers use only Personnel trained in 
the sand slurry method by the tank manufacturer and use the method...
-
Mass Hoisting Test Questions With Complete Solutions (Verified And Updated)
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Mass Hoisting Test Questions With Complete 
Solutions (Verified And Updated) 
What is the purpose of the swing gear on an excavator - answerIt connects the car body to 
the tracks 
Who is responsible for inspecting a trench before anyone goes in it - answerThe equipment 
operator 
What is the preferred sling angle of these angles? 
60 degrees 
45 degrees 
30 degrees - answer60 degrees 
The top of the spoil pile is called - answerCrown 
A four foot deep trench requires an additional ladder for ev...
-
Mass Hoisting Test Questions With Complete Solutions (Verified And Updated)
- Exam (elaborations) • 10 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
Mass Hoisting Test Questions With Complete 
Solutions (Verified And Updated) 
What is the purpose of the swing gear on an excavator - answerIt connects the car body to 
the tracks 
Who is responsible for inspecting a trench before anyone goes in it - answerThe equipment 
operator 
What is the preferred sling angle of these angles? 
60 degrees 
45 degrees 
30 degrees - answer60 degrees 
The top of the spoil pile is called - answerCrown 
A four foot deep trench requires an additional ladder for ev...
-
AHIT up to electrical Practice Questions and Answers (100% Pass)
- Exam (elaborations) • 88 pages • 2024
- Available in package deal
-
- $12.49
- + learn more
AHIT up to electrical Practice Questions and 
Answers (100% Pass) 
What is the overall purpose of the structural inspection? 
a. to report signs of water penetration 
b. to check for code compliance 
c. to identify major structural deficiencies 
d. to recommend inspection by a structural engineer - Answer️️ -c 
What part of a home's structure is least likely to be visible to the home 
inspector? 
a. crawl space 
b. footings 
c. attic 
d. foundation - Answer️️ -b 
When should the home in...
Do you wonder why so many students wear nice clothes, have money to spare and enjoy tons of free time? Well, they sell on Stuvia! Imagine your study notes being downloaded a dozen times for $15 each. Every. Single. Day. Discover all about earning on Stuvia