500 mwh - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about 500 mwh? On this page you'll find 18 study documents about 500 mwh.
All 18 results
Sort by
![KNOWN NERC EXAM QUESTIONS From Class Questions and Correct Answers](/docpics/4145737/65975d0f649f8_4145737_121_171.jpeg)
-
KNOWN NERC EXAM QUESTIONS From Class Questions and Correct Answers
- Exam (elaborations) • 10 pages • 2024
-
Dants
-
- $12.99
- + learn more
A 50 MVA generator is currently producing 40 MWs and 10 MVARs. What are the dynamic reactive reserves currently on this generator? 
 
a) 50 
b) 30 
c) 0 
d) 20 - Correct Answer: d) 20 
 
A Balancing Authority has a Frequency Bias Setting of -200 MW/.1Hz. What is the Balancing Authority's Frequency Response for a frequency of 59.95 Hz? 
 
a) 10 MWs 
b) 50 MWs 
c) 100 MWs 
d) 200 MWs - Correct Answer: c) 100 MWs 
 
A Balancing Authority is scheduled to receive 300 MWs from the north and 400 MWs ...
![NERC Interchange Transaction Exam (100% Correct Answers)](/docpics/3614701/6529161c6eada_3614701_121_171.jpeg)
-
NERC Interchange Transaction Exam (100% Correct Answers)
- Exam (elaborations) • 17 pages • 2023
-
Available in package deal
-
ProfGoodlucK
-
- $12.49
- + learn more
Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must include a portion o fthe unit's MW output as an adjustment to the ________ in its ACE equation. 
net actual interchange (NIA) 
 
 
A dynamic schedule is commonly used for scheduling jointly-owned generation between Balancing Authority Areas. To properly acco...
![NERC Certification Practice Questions and Answers (Already GRADED A)](/docpics/3605036/6527182204144_3605036_121_171.jpeg)
-
NERC Certification Practice Questions and Answers (Already GRADED A)
- Exam (elaborations) • 13 pages • 2023
-
Available in package deal
-
ProfGoodlucK
-
- $9.99
- + learn more
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS 
b) An inaccurate load forecast 
 
 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? 
 
a) A net under-generation in Balancing Area...
![KNOWN NERC EXAM QUESTIONS: From Class](/docpics/3591742/6524f3476ffc5_3591742_121_171.jpeg)
-
KNOWN NERC EXAM QUESTIONS: From Class
- Exam (elaborations) • 6 pages • 2023
-
STUVATE
-
- $9.99
- + learn more
KNOWN NERC EXAM QUESTIONS: From Class 
 
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - b) An inaccurate load forecast 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? 
 
a) A...
![NERC book quiz Questions and Answers (100% Correct Elaborations)](/docpics/3604965/65271569801f1_3604965_121_171.jpeg)
-
NERC book quiz Questions and Answers (100% Correct Elaborations)
- Exam (elaborations) • 29 pages • 2023
-
Available in package deal
-
ProfGoodlucK
-
- $10.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? 
-4MW 
 
 
Net actual interchange minus Net scheduled interchange is what? 
Inadvertent interchange 
 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
![NERC book Quiz Questions and Answers 2023-2024 Graded A](/docpics/3606630/6527af4780b68_3606630_121_171.jpeg)
-
NERC book Quiz Questions and Answers 2023-2024 Graded A
- Exam (elaborations) • 13 pages • 2023
-
PossibleA
-
- $12.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW 
 
Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
![Interchange Transaction- Test Questions with Correct Solutions Latest update 2025 (Rated A+)](/docpics/6918789/6777ae3b798a3_6918789_121_171.jpeg)
-
Interchange Transaction- Test Questions with Correct Solutions Latest update 2025 (Rated A+)
- Exam (elaborations) • 10 pages • 2025
-
TutorJosh
-
- $8.39
- + learn more
Interchange Transaction- Test Questions with Correct Solutions Latest update 2025 (Rated A+) 
Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must include a portion o fthe unit's MW output as an adjustment to the ________ in its ACE equation. - Answers net actual interchange (NIA) 
A dynamic schedule is ...
![NERC book Quiz Questions and Answers 2023-2024 Graded A](/docpics/3606641/6527afc3a631c_3606641_121_171.jpeg)
-
NERC book Quiz Questions and Answers 2023-2024 Graded A
- Exam (elaborations) • 13 pages • 2023
-
Bestzone
-
- $11.49
- + learn more
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW 
 
Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange 
 
Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
![KNOWN NERC EXAM QUESTIONS FROM CLASS(FULLY SOLVED).](/docpics/3730445/65401b740d81a_3730445_121_171.jpeg)
-
KNOWN NERC EXAM QUESTIONS FROM CLASS(FULLY SOLVED).
- Exam (elaborations) • 11 pages • 2023
- Available in package deal
-
BRAINBOOSTERS
-
- $14.49
- + learn more
A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? 
 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS 
b) An inaccurate load forecast 
 
 
 
Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? 
 
a) A net under-generation in Balancing Ar...
![NERC Interchange Transaction | questions and answers](/docpics/3625410/652c605609fe6_3625410_121_171.jpeg)
-
NERC Interchange Transaction | questions and answers
- Exam (elaborations) • 8 pages • 2023
- Available in package deal
-
STUVATE
-
- $9.49
- + learn more
NERC Interchange Transaction | questions and answers 
 
Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must include a portion o fthe unit's MW output as an adjustment to the ________ in its ACE equation. - net actual interchange (NIA) 
A dynamic schedule is commonly used for scheduling jointly-owned generat...
![Verkoop je kennis op stuvia](https://www.stuvia.com/hosted-imgs/app/stock-fotos/banner_seller_big.jpg)
How did he do that? By selling his study resources on Stuvia. Try it yourself! Discover all about earning on Stuvia