500 mwh - Samenvattingen en Aantekeningen

Op zoek naar een samenvatting over 500 mwh? Op deze pagina vind je 18 samenvattingen over 500 mwh.

Alle 18 resultaten

Sorteer op

KNOWN NERC EXAM QUESTIONS From Class Questions and Correct Answers
  • KNOWN NERC EXAM QUESTIONS From Class Questions and Correct Answers

  • Tentamen (uitwerkingen) • 10 pagina's • 2024
  • A 50 MVA generator is currently producing 40 MWs and 10 MVARs. What are the dynamic reactive reserves currently on this generator? a) 50 b) 30 c) 0 d) 20 - Correct Answer: d) 20 A Balancing Authority has a Frequency Bias Setting of -200 MW/.1Hz. What is the Balancing Authority's Frequency Response for a frequency of 59.95 Hz? a) 10 MWs b) 50 MWs c) 100 MWs d) 200 MWs - Correct Answer: c) 100 MWs A Balancing Authority is scheduled to receive 300 MWs from the north and 400 MWs ...
  • Dants
    (0)
  • $12.99
  • + meer info
NERC Interchange Transaction Exam (100% Correct Answers)
  • NERC Interchange Transaction Exam (100% Correct Answers)

  • Tentamen (uitwerkingen) • 17 pagina's • 2023
  • Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must include a portion o fthe unit's MW output as an adjustment to the ________ in its ACE equation. net actual interchange (NIA) A dynamic schedule is commonly used for scheduling jointly-owned generation between Balancing Authority Areas. To properly acco...
  • ProfGoodlucK
    (0)
  • $9.99
  • + meer info
NERC Certification Practice Questions and Answers (Already GRADED A)
  • NERC Certification Practice Questions and Answers (Already GRADED A)

  • Tentamen (uitwerkingen) • 13 pagina's • 2023
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Area...
  • ProfGoodlucK
    (0)
  • $9.99
  • + meer info
KNOWN NERC EXAM QUESTIONS: From Class
  • KNOWN NERC EXAM QUESTIONS: From Class

  • Tentamen (uitwerkingen) • 6 pagina's • 2023
  • KNOWN NERC EXAM QUESTIONS: From Class A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS - b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A...
  • STUVATE
    (0)
  • $9.99
  • + meer info
NERC book quiz Questions and Answers (100% Correct Elaborations)
  • NERC book quiz Questions and Answers (100% Correct Elaborations)

  • Tentamen (uitwerkingen) • 29 pagina's • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? -4MW Net actual interchange minus Net scheduled interchange is what? Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate a...
  • ProfGoodlucK
    (0)
  • $10.49
  • + meer info
 NERC book Quiz Questions and Answers 2023-2024 Graded A
  • NERC book Quiz Questions and Answers 2023-2024 Graded A

  • Tentamen (uitwerkingen) • 13 pagina's • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
  • PossibleA
    (0)
  • $12.49
  • + meer info
Interchange Transaction- Test Questions with Correct Solutions Latest update 2025 (Rated A+)
  • Interchange Transaction- Test Questions with Correct Solutions Latest update 2025 (Rated A+)

  • Tentamen (uitwerkingen) • 10 pagina's • 2025
  • Interchange Transaction- Test Questions with Correct Solutions Latest update 2025 (Rated A+) Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must include a portion o fthe unit's MW output as an adjustment to the ________ in its ACE equation. - Answers net actual interchange (NIA) A dynamic schedule is ...
  • TutorJosh
    (0)
  • $8.39
  • + meer info
 NERC book Quiz Questions and Answers 2023-2024 Graded A
  • NERC book Quiz Questions and Answers 2023-2024 Graded A

  • Tentamen (uitwerkingen) • 13 pagina's • 2023
  • You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? - -4MW Net actual interchange minus Net scheduled interchange is what? - Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at ...
  • Bestzone
    (0)
  • $11.49
  • + meer info
KNOWN NERC EXAM QUESTIONS FROM CLASS(FULLY SOLVED).
  • KNOWN NERC EXAM QUESTIONS FROM CLASS(FULLY SOLVED).

  • Tentamen (uitwerkingen) • 11 pagina's • 2023
  • Ook in voordeelbundel
  • A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. What is the most likely cause? a) Loss of a large generator in the area b) An inaccurate load forecast c) Loss of a major transmission line d) A malfunction of EMS b) An inaccurate load forecast Balancing Area A notices that the Interconnection frequency is 59.94 Hz and their ACE is 0. Which of the following could be the cause of this reading? a) A net under-generation in Balancing Ar...
  • BRAINBOOSTERS
    (0)
  • $14.49
  • + meer info
 NERC Interchange Transaction | questions and answers
  • NERC Interchange Transaction | questions and answers

  • Tentamen (uitwerkingen) • 8 pagina's • 2023
  • Ook in voordeelbundel
  • NERC Interchange Transaction | questions and answers Generating units jointly owned by two or more Balancing Authorities may be modeled in the AGC systems as a "virtual" tie line flow (pseudo-tie). To properly account for the jointly owned unit as a pseudo-tie, each Balancing Authority must include a portion o fthe unit's MW output as an adjustment to the ________ in its ACE equation. - net actual interchange (NIA) A dynamic schedule is commonly used for scheduling jointly-owned generat...
  • STUVATE
    (0)
  • $9.49
  • + meer info