Aia contract Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Aia contract? On this page you'll find 230 study documents about Aia contract.

All 230 results

Sort by

CDT Exam Questions With Correct Answers 100% Solved Popular
  • CDT Exam Questions With Correct Answers 100% Solved

  • Exam (elaborations) • 42 pages • 2024
  • CDT Exam Questions With Correct Answers 100% Solved Which of these documents, might we find in the Project Manual but they are not contract documents? (A) The Agreement (B) Procurement Documents (C) Addendum (D) Supplemental Conditions - answerAnswer: B Reference: PDPG 11.1.6 Explanation: Procurement requirements are addressed to prospective bidders or proposers interested in the project. Although not necessarily part of a contract, the procurement requirements are usually bound wit...
    (1)
  • $14.49
  • 2x sold
  • + learn more
CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version Popular
  • CDT Exam Questions | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 65 pages • 2024 Popular
  • Available in package deal
  • Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14. - Answer: C - Contractor. Safety provisi...
    (1)
  • $15.49
  • 2x sold
  • + learn more
AIA contract document A201 - Study Set
  • AIA contract document A201 - Study Set

  • Exam (elaborations) • 18 pages • 2024
  • AIA contract document A201 - Study Set A201 covers what information? - General conditions of the contract for construction. According to section 1.1.1 what are acceptable modifications to the contract issued after execution? - 1) A written amendment to the contract signed by both parties 2) A change order 3) A construction change directive 4) A written order for a minor change in work issued by the architect. What items do the contract documents not include? - Advertisement or inv...
    (0)
  • $9.99
  • + learn more
 CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT
  • CMIT Exam (200 multiple choice) Questions with Verified Answers,100% CORRECT

  • Exam (elaborations) • 29 pages • 2023
  • CMIT Exam (200 multiple choice) Questions with Verified Answers A CM's role and responsibilities are governed solely by the Owner/CM Agreement. True False - CORRECT ANSWER True There are two basic forms of CM, agency and at-risk. Each form provides for the basic services of construction management practice. However, there are some key differences. Which of the following do not apply to both CM forms? A) Both forms provide advice to the owner on constructibility, budget and the schedule....
    (0)
  • $11.99
  • 1x sold
  • + learn more
FL Business and Finance Practice Test 100% Correct
  • FL Business and Finance Practice Test 100% Correct

  • Exam (elaborations) • 23 pages • 2023
  • FL Business and Finance Practice Test 100% Correct The owner must prove financial capability no later than ________ days prior to the expiration of the time for withdrawal of bids. A. 3 B. 5 C.7 D.30 Answer: C. 7 - AIA 701.6.2 How many copies of the plans and specifications shall the contractor maintain on site? A. 1 B. 2 C. 3 D. 4 Answer: A. 1 - AIA201 2.3.6 Contracts entered into by unlicensed contractors ________________. A. are immoral B.are illegal C. are enforceable D. are unenforceable...
    (0)
  • $9.99
  • 1x sold
  • + learn more
AIA contract document A201 - Study Set Exam 2023-2024
  • AIA contract document A201 - Study Set Exam 2023-2024

  • Exam (elaborations) • 13 pages • 2023
  • AIA contract document A201 - Study Set Exam ...
    (0)
  • $9.49
  • + learn more
AIA contract document A201 - Study Set  | 85 Questions with 100% Correct Answers | Updated & Verified
  • AIA contract document A201 - Study Set | 85 Questions with 100% Correct Answers | Updated & Verified

  • Exam (elaborations) • 18 pages • 2023
  • A201 covers what information? - General conditions of the contract for construction. According to section 1.1.1 what are acceptable modifications to the contract issued after execution? - 1) A written amendment to the contract signed by both parties 2) A change order 3) A construction change directive 4) A written order for a minor change in work issued by the architect. What items do the contract documents not include? - Advertisement or invitation to bid, Instructions to bidders, samp...
    (0)
  • $15.49
  • + learn more
CDT Exam questions and Answers 100%  Correct
  • CDT Exam questions and Answers 100% Correct

  • Exam (elaborations) • 53 pages • 2024
  • CDT Exam questions and Answers 100% Correct Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CC...
    (0)
  • $18.49
  • + learn more
CDT Exam|100 Questions and Answers 100% Accurate
  • CDT Exam|100 Questions and Answers 100% Accurate

  • Exam (elaborations) • 52 pages • 2024
  • CDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% AccurateCDT Exam|100 Questions and Answers 100% Accurate Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above...
    (0)
  • $12.99
  • + learn more
CDT Exam Questions and Answers (Verified).
  • CDT Exam Questions and Answers (Verified).

  • Exam (elaborations) • 54 pages • 2023
  • CDT Exam Questions and Answers (Verified). Select the entity which is generally assigned the following duties and responsibilities by the Conditions of the Contract: Protection of job site workers and stored materials. A - Architect/Engineer B - Owner C - Contractor D - Varies, as stated in the Supplementary Conditions E - None of the above Reference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through 7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9....
    (0)
  • $12.99
  • + learn more