Api 1169 stuvia Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Api 1169 stuvia? On this page you'll find 11 study documents about Api 1169 stuvia.

All 11 results

Sort by

API 1169 Exam Questions & Answers 100% Accurate
  • API 1169 Exam Questions & Answers 100% Accurate

  • Exam (elaborations) • 35 pages • 2023
  • Class Soil Rock Class 1 30 (762) 18 (457) Class 2, 3, 4 36 (914) 24 (610) Drainage ditches of public roads and railroad crossings 36 (914) 24 (610) - Answer Class Soil Rock Class 1 Class 2, 3, 4 Drainage ditches of public roads and railroad crossings RT Examination - Answer Which non-destructive testing method is specified in API 1104 30 - Answer Calc the top width of a bell hole exc that is 8 ft deep and 6 ft wide. Soil C. Phase III - Answer EPA - Phase for containment c...
    (0)
  • $12.99
  • + learn more
API 1169 Test Questions & Answers
  • API 1169 Test Questions & Answers

  • Exam (elaborations) • 15 pages • 2023
  • Which of the following equipment may NOT be required for a pressure test? - Answer internal line clamps before testing begins, a ________ with explanatory notes and data should be prepared - Answer pressure test procedure the pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelinesshould be performed in accordance with - Answer ASME B31.4, 49 Code of Federal Regulations, Part 195 and any other applicable governmental regulations. Before the ac...
    (0)
  • $12.99
  • + learn more
API 1169 STUDY GUIDE WITH COMPLETE SOLUTION
  • API 1169 STUDY GUIDE WITH COMPLETE SOLUTION

  • Exam (elaborations) • 29 pages • 2023
  • OSHA 1910 - Answer ______ document has the largest PPE section and safety definitions OSHA 1926 - Answer _______ document has construction safety, safety focused on eye and face protection, excavation safety, scaffolds, cranes riggings, use of explosives' 33 CFR 321 - Answer ______ document covers Dams/ Dikes, very infrequently used, very short and you will quickly be able to find what you need 49 CFR - Answer ____ document has hazardous materials tables, hazardous shipping tables 4...
    (0)
  • $11.99
  • + learn more
API 1169 Study Test Questions Test RM#3 Correct 100%
  • API 1169 Study Test Questions Test RM#3 Correct 100%

  • Exam (elaborations) • 15 pages • 2023
  • One main category variable of pressure test planning that an operator must consider is the _________________. - Answer purpose Field beveling of pipe ends by manual oxygen cutting is acceptable if authorized by the company. - Answer True Location of casings cathode protection external anodes, and utility crossings should all be recorded on the. - Answer as-built drawings Releasing air or water pressure through valves, at a test head, after the testing of a pipe is called a____________. ...
    (0)
  • $11.99
  • + learn more
API 1169 Sample Test Questions With Correct Answers
  • API 1169 Sample Test Questions With Correct Answers

  • Exam (elaborations) • 6 pages • 2023
  • Which of the following equipment may NOT be required for a pressure test? - Answer Internal line up clamps Before testing begins, a _____________ with explanatory notes and data should be prepared. - Answer Pressure test procedure The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines should be performed in accordance with: - Answer ASME, Code of Federal Regulations and any other applicable governmental regulations. Before the actual line ...
    (0)
  • $10.99
  • + learn more
API 1169 Study Test Questions Test RM#1 Correct 100%
  • API 1169 Study Test Questions Test RM#1 Correct 100%

  • Exam (elaborations) • 14 pages • 2023
  • According to FERC, environmental Inspectors shall have _____________ status in regards to all other craft inspectors. - Answer Equal According to Title 49 CFR 195, any new pipe with a diameter greater than ___________ inches must be marked with the specification, the SMYS/Grade, and pipe size. - Answer 4.5 This legislation covers hazardous substance, site contamination, and cleanup - Answer Comprehensive environmental recovery, compensation, and liability act. A blueprint showing the ex...
    (0)
  • $10.99
  • + learn more
API 1169 Recommended Practice Exam Questions With Correct Answers
  • API 1169 Recommended Practice Exam Questions With Correct Answers

  • Exam (elaborations) • 6 pages • 2023
  • API Specification 5L - Answers Specification for line pipe APL Recommended Practice 5L1 - Answers Recommended practice for railroad transportation of line pipe API Recommended Practice 5LT - Answers Recommended practice for truck transportation of line pipe API Recommended Practice 5LW - Answers Recommended practice for transportation of line pipe on barges and marine vessel API Specification 6D - Answers Specification for pipeline valves API Recommended Practice 1102 - Answers St...
    (0)
  • $10.99
  • + learn more
API 1169 Exam Questions & Answers Solved 100%
  • API 1169 Exam Questions & Answers Solved 100%

  • Exam (elaborations) • 6 pages • 2023
  • FERC - Answer Federal Energy Regulatory Commission OSHA - Answer Occupational Safety and Hazard Administration PHMSA - Answer Pipeline Hazardous Materials and Safety Administration INGAA - Answer Interstate Natural Gas Association of America CFR - Answer Code of Federal Regulations EPA - Answer Environmental Protection Act CERCLA - Answer Comprehensive Environmental Response, Compensation and Liability Act also known as Superfund CERCLA purpose - Answer To remedy threats to ...
    (0)
  • $10.49
  • + learn more
API 1169 III Questions & Answers
  • API 1169 III Questions & Answers

  • Exam (elaborations) • 6 pages • 2023
  • All excavations made in type B soil 20' or less in depth which have vertically sided lower portions shall be - Answer Required to have the lower portion be shielded or supported to a height at least 18" above the top of the vertical side A confined space is? - Answer A space that can be entered bodily by an individual but is not designed for continuous occupancy and has limited and restricted means of entry and exit. What info concerning position should be noted on the qualified WPS? - A...
    (0)
  • $11.49
  • + learn more
API 1169 Sample Test 2 Questions With Verified Answers
  • API 1169 Sample Test 2 Questions With Verified Answers

  • Exam (elaborations) • 5 pages • 2023
  • Electrical survey methods may be used as an indication of suspected corrosive areas where surface conditions permit sufficiently accurate. Common methods of electrical survey include: - Answer 1. Pipe to soil potentials 2. Surface potentials (cell to cell) 3. Soul resistivity measurements Each transmissions line or main must be constructed in accordance with comprehensive ______ that are consistent with 49 cfr 192. - Answer Written specifications or standards One in every ten lengths of...
    (0)
  • $10.99
  • + learn more