Army acquisition test - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Army acquisition test? On this page you'll find 249 study documents about Army acquisition test.

All 249 results

Sort by

CLG 001_ Fiscal Law Exam version 2/ with 100% 2024 verified answers Popular
  • CLG 001_ Fiscal Law Exam version 2/ with 100% 2024 verified answers

  • Exam (elaborations) • 20 pages • 2023
  • QUESTION 1 1. Which of the following is a correct statement of Fiscal Law Philosophy: If the law is silent as to whether a purchase can be made, it is probably safe to spend appropriated funds. authorized by Congress. If the commander says buy it, don’t worry about Fiscal Law Regulations. Absent a specific prohibition, expending appropriated funds is permitted. 20 points QUESTION 2 1. It is July 2010. The contracting officer at Fort Mason is about to award a contract for a comput...
    (1)
  • $8.49
  • 2x sold
  • + learn more
Army Acquisition Exam 1 Questions with 100% Correct Answers | Latest Version 2024/2025 | Expert Verified | Ace the Test
  • Army Acquisition Exam 1 Questions with 100% Correct Answers | Latest Version 2024/2025 | Expert Verified | Ace the Test

  • Exam (elaborations) • 14 pages • 2024
  • Army Acquisition Exam 1 Questions with 100% Correct Answers | Latest Version 2024/2025 | Expert Verified | Ace the Test
    (0)
  • $12.49
  • + learn more
AIPM Exam #2 Questions and Answers 100% Pass
  • AIPM Exam #2 Questions and Answers 100% Pass

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • AIPM Exam #2 Questions and Answers 100% Pass What is the purpose of Test and Evaluation (T&E)? - Answer- - To help reduce or manage risks in: Development, Acquisitions, Utilization Who are the customers of T&E? - Answer- - Developers / Acquisition Managers: - Designers and Engineers: - End-Users: What are the various test Agencies? - Answer- - DOT&E - ATEC - AEC - OTC Who is the DOT&E? - Answer- - The principal staff assistant and senior advisor to the Secretary of Defense on operatio...
    (0)
  • $12.49
  • + learn more
SEJPME 2 Test Bank: Module 1 to 24 Questions with Answers 2023 (Already Graded A+)
  • SEJPME 2 Test Bank: Module 1 to 24 Questions with Answers 2023 (Already Graded A+)

  • Exam (elaborations) • 120 pages • 2023
  • SEJPME 2 Test Bank: Module 1 to 24 Questions with Answers 2023 (Already Graded A+) Which hostile environment often presents complex emotional and ethical dilemmas? [objective68] major combat operations humanitarian assistance operations support for civil authorities irregular warfare environment 8) Ethical conduct in the procurement process is particularly important to ensure fair and competitive in-theater acquisition efforts and ensure these processes do not have a negative impact on t...
    (0)
  • $25.49
  • 1x sold
  • + learn more
AAPC PM Exam 1 | Questions with 100% Correct Answers | Latest Update 2024 | Verified
  • AAPC PM Exam 1 | Questions with 100% Correct Answers | Latest Update 2024 | Verified

  • Exam (elaborations) • 27 pages • 2024
  • AAPC PM Exam 1 | Questions with 100% Correct Answers | Latest Update 2024 | Verified Define the Defense Acquisition Workforce Improvement Act (DAWIA) - Established: AC positions, structured approach, standards (certification), training, DAU Identify the three reasons why Congress passed DAWIA and the requirements of the law - Defense systems are complex Defense systems are costly Requires qualified personnel Define the role of the DoD Directors of Acquisition Career Management (DACM). - ...
    (0)
  • $9.99
  • + learn more
ACQ 202 MODULE 1-4 FULL EXAM WITH GUARANTEED ACCURATE ANSWERS |VERIFIED
  • ACQ 202 MODULE 1-4 FULL EXAM WITH GUARANTEED ACCURATE ANSWERS |VERIFIED

  • Exam (elaborations) • 20 pages • 2024
  • There are four basic techniques used by the DoD for creating cost estimates: Analogy, Parametric, and Actual Costs are three techniques. - ACCURATE ANSWEREngineering Which appropriation category would fund the design of new equipment, material, or software? - ACCURATE ANSWERResearch, Development, Test and Evaluation What's the primary purpose of an Analysis of Alternatives (AoA)? - ACCURATE ANSWERProvide decision-making aid in selecting a cost-effective material alternative When compar...
    (0)
  • $15.49
  • + learn more
CSCI 202 Final Exam Questions With Answers Latest 2023/2024 Graded A+
  • CSCI 202 Final Exam Questions With Answers Latest 2023/2024 Graded A+

  • Exam (elaborations) • 69 pages • 2023
  • CSCI 202 Final Exam Questions With Answers Latest 2023/2024 Graded A+. Which one of the following organizations would evaluate measures of effectiveness (MOEs) to determine how well a munitions system can perform its mission? Marine Corps Operational Test and Evaluation Activity (MCOTEA) Marine Corps Systems Command (MARCORSYSCOM) Defense Contract Management Agency (DCMA) Joint Interoperability Test Command (JITC) 4) Which one of the following test and evaluation (T&E) products is requi...
    (0)
  • $15.49
  • + learn more
AIPM Exam #2 Questions and Answers 100% Pass
  • AIPM Exam #2 Questions and Answers 100% Pass

  • Exam (elaborations) • 35 pages • 2024
  • Available in package deal
  • AIPM Exam #2 Questions and Answers 100% Pass What is the purpose of Test and Evaluation (T&E)? - Answer- - To help reduce or manage risks in: Development, Acquisitions, Utilization Who are the customers of T&E? - Answer- - Developers / Acquisition Managers: - Designers and Engineers: - End-Users: What are the various test Agencies? - Answer- - DOT&E - ATEC - AEC - OTC Who is the DOT&E? - Answer- - The principal staff assistant and senior advisor to the Secretary of Defense on operatio...
    (0)
  • $13.49
  • + learn more
Defense Acquisition University ACQ 101/ACQ101 all module tests.
  • Defense Acquisition University ACQ 101/ACQ101 all module tests.

  • Other • 54 pages • 2022
  • Defense Acquisition University ACQ 101/ACQ101 all module tests Fall 2022 Questions and correct Answers. Defense Acquisition University; ACQ 101 all module Exams 1) A system can be defined as: All elements (e.g., hardware, software, logistics support, personnel) needed to assist the Department of Defense (DoD) to conduct its mission of deterring or winning war The deployment and fielding processes used by the Department of Defense (DoD) to conduct its mission of deterring or winnin...
    (0)
  • $11.48
  • 4x sold
  • + learn more
Range Safety questions with correct answers
  • Range Safety questions with correct answers

  • Exam (elaborations) • 6 pages • 2024
  • Director Army Staff (DAS) - Correct Answer-Who is the Proponent of AR 385-63 and DA PAM 385-63? What authority does the DAS have as the proponent of range safety regulations? - Correct Answer-. The proponent has authority to approve exceptions or waivers to this regulation that are consištent with controlling law and regulations. The DAS may delegate this approval authority, in writing, to a division chief within the proponent agency or its direct reporting unit or field operating agency,...
    (0)
  • $12.99
  • + learn more