Asme bpvc Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Asme bpvc? On this page you'll find 16 study documents about Asme bpvc.
All 16 results
Sort by
-
API 510 Latest Update Graded A+
- Exam (elaborations) • 37 pages • 2024
-
- $11.99
- + learn more
Scope of API 510 
4 in service activities 
4 construction code oddities 
what is the purpose? 
In-service inspection, repair, alteration and rerating. Pressure vessels and PRD's 
All in-service hydrocarbon and chemical process vessels. Unless voided by RBI 1.2.2 
A) Vessels constructed under a construcion code. ASME BPVC 
B) vessel constructed without a code 
C) vessel constucted under special jurisdictional acceptance 
D) vessel constructed under code but lost is nameplate or stamp. Nonstandar...
-
API 510 Latest Update Graded A+
- Exam (elaborations) • 37 pages • 2024
- Available in package deal
-
- $10.99
- + learn more
API 510 Latest Update Graded A+ 
 
Scope of API 510 
4 in service activities 
4 construction code oddities 
what is the purpose? 
In-service inspection, repair, alteration and rerating. Pressure vessels and PRD's 
All in-service hydrocarbon and chemical process vessels. Unless voided by RBI 1.2.2 
A) Vessels constructed under a construcion code. ASME BPVC 
B) vessel constructed without a code 
C) vessel constucted under special jurisdictional acceptance 
D) vessel constructed under code but l...
-
ABSA 4A UNIT 11 Complete Questions & Answers!!
- Exam (elaborations) • 11 pages • 2024
-
Available in package deal
-
- $13.29
- + learn more
Which of the following is NOT an advantage of an electric boiler over other boilers? 
 
Select one: 
a. More efficient 
b. Does not need water treatment 
c. Very compact 
d. Quiet operation - ANSWER b. Does not need water treatment 
 
Why does an electrode boiler not need a low water cut-off? 
 
Select one: 
a. The current flow stops if the water level drops below the electrodes 
b. The current in the electrodes ensures the water level is high enough 
c. There is no possibility of low water leve...
-
PART B - BOILER SAFETY DEVICES Exam Questions With Verified Answers
- Exam (elaborations) • 33 pages • 2024
-
- $13.49
- + learn more
PART B - BOILER SAFETY DEVICES 
Exam Questions With Verified Answers 
Pressure relief valve is a device designed to actuate on: 
a. outlet static pressure 
b. inlet static pressure 
c. inlet dynamic pressure 
d. outlet dynamic pressure - answerb 
As per ASME PTC-25, a PRV that may be actuated by pressure or temperature at valve inlet is a: 
a. safety relief valve 
b. safety valve 
c. temperature & pressure relief valve 
d. pressure relief valve - answerc 
A Relief Valve is a PRV characterized by...
-
Power Engineering CH B3 Questions and Answers 2023
- Exam (elaborations) • 6 pages • 2023
-
Available in package deal
-
- $11.49
- + learn more
Power Engineering CH B3 Questions and Answers 2023 
With reference to ASME BPVC I, PG-73 (2017): Each safety valve or safety relief valve shall have a substantial lifting device activated only when the valve is subjected to a pressure at least _____ % of the boiler operating pressure: 
75 
 
 
 
The following component is included in a 'fuel oil train' but not 'fuel gas trains': 
Low Oil temperature cut-off switch 
 
 
 
According to ASME BPVC I, PG-73 (2015), the use of pressure relief valv...
Make study stress less painful
-
Level 1 CSA 178.2 Questions and Answers Already Passed
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $9.99
- + learn more
Level 1 CSA 178.2 Questions and Answers Already Passed 
True or False: The fume generation rate for a welding process is used to measure the welder's exposure to fume. False 
What source recommends the types of ventilation to reduce welder exposure to welding fume? 
a) CSA Standard W117.2 
b) Company health and safety policies c) The Occupational Health and Safety Act a) CSA Standard W117.2 
Is the leg length of a concave fillet weld the same as the weld size? No 
What is a prequalified joint? ...
-
API 510 Latest Update Graded A+
- Exam (elaborations) • 37 pages • 2024
-
- $11.99
- + learn more
Scope of API 510 
4 in service activities 
4 construction code oddities 
what is the purpose? 
In-service inspection, repair, alteration and rerating. Pressure vessels and PRD's 
All in-service hydrocarbon and chemical process vessels. Unless voided by RBI 1.2.2 
A) Vessels constructed under a construcion code. ASME BPVC 
B) vessel constructed without a code 
C) vessel constucted under special jurisdictional acceptance 
D) vessel constructed under code but lost is nameplate or stamp. Nonstandar...
-
Unit 3 - Chapter 4 - Boiler Fittings Questions and Answers 2023
- Exam (elaborations) • 5 pages • 2023
-
Available in package deal
-
- $16.99
- + learn more
Unit 3 - Chapter 4 - Boiler Fittings Questions and Answers 2023 
What must be taken into consideration for boiler fittings? 
Operating temp 
Operating pressure 
Material compatibility 
 
 
 
CSA B51 Boiler, Pressure Vessel and Pressure Piping Code requires all pressure fittings to be registered as pressure components if designed for service at: 
Pressures greater than 103 kPa and temps above 63 degrees celsius 
Pressures greater than 1720 kPa. 
 
 
 
Manufacturer has to do what to register a fit...
-
Unit 3 Boiler Safety Devices Questions and Answers 2023
- Exam (elaborations) • 5 pages • 2023
-
Available in package deal
-
- $11.99
- + learn more
Unit 3 Boiler Safety Devices Questions and Answers 2023 
A leveling indicator is found on a/an: 
Two-Position Mercury pressure controls 
 
 
 
Boiler blowdown lines have a specific size range based on: 
boiler capacity 
 
 
 
With reference to ASME BPVC IV, HG 400.1 (b): Steam heating boiler safety valve(s) shall not be smaller than: 
DN 15 
 
 
 
The low water fuel cut-off: 
shuts off the fuel if the water level is too low 
 
 
 
The purpose of the ________ on top of the spindle above the sprin...
-
API 510 Questions and Answers 100% Pass
- Exam (elaborations) • 25 pages • 2024
-
Available in package deal
-
- $8.69
- + learn more
API 510 Questions and Answers 100% Pass 
 
 
 
Scope of API 510 
4 in service activities 
4 construction code oddities 
what is the purpose? 
In-service inspection, repair, alteration and rerating. Pressure vessels and PRD's 
All in-service hydrocarbon and chemical process vessels. Unless voided by RBI 1.2.2 
A) Vessels constructed under a construcion code. ASME BPVC 
B) vessel constructed without a code 
C) vessel constucted under special jurisdictional acceptance 
D) vessel constructed under...
Study stress? For sellers on Stuvia, these are actually golden times. KA-CHING! Earn from your study resources too and start uploading now. Discover all about earning on Stuvia