Asme test - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Asme test? On this page you'll find 618 study documents about Asme test.

All 618 results

Sort by

100 Elevator Final Exam 100% Correct Answers  Verified  Latest 2024 Version lennyhov Popular
  • 100 Elevator Final Exam 100% Correct Answers Verified Latest 2024 Version lennyhov

  • Exam (elaborations) • 14 pages • 2024
  • 100 Elevator Final Exam | 100% Correct Answers | Verified | Latest 2024 Version Which of the following is a term used to describe a body harness used in conjunction with a shock absorbing lanyard? - Personal fall arrest system A mechanic is working on a construction job, and finds the carpenter using a powder activated tool to anchor wall track. Of the following, which precaution should the mechanic take? - Wear hearing protection Which is the best way to communicate with your coworkers w...
    (0)
  • $12.99
  • 2x sold
  • + learn more
Florida LP Master Qualifier Exam | 100% Correct Answers | Verified | Latest 2024 Version Popular
  • Florida LP Master Qualifier Exam | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 5 pages • 2024 Popular
  • Florida LP Master Qualifier Exam | 100% Correct Answers | Verified | Latest 2024 Version When must a dispensing unit have a License to operate in the state of Florida? - When selling to the public What are the insurance requirements for dispensing units in Florida? - 1 Mil Cat 2 Ins Have a qualifier What kind of accident must be reported - Cause of death or medical care Property damage more than 1000 When must accidents be reported - Cause of death or professional medical car...
    (0)
  • $9.78
  • 1x sold
  • + learn more
Tower Crane (Questions and Answers)
  • Tower Crane (Questions and Answers)

  • Exam (elaborations) • 8 pages • 2023
  • Which of the following OSHA regulations govern suspended personnel platforms? correct answers OSHA 1926.1431 According to ASME B30.3 The prohibited zone for power lines that are 60 kV is correct answers 15 ft According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of correct answers 5 to 1 According to ASME B30.3 when Lifting a suspended personnel platform design factor for the rigging hardware is correct answers 5 to 1 According to ASME B30.3 Load hoist ...
    (0)
  • $10.39
  • 1x sold
  • + learn more
Minnesota Special Engineer Boiler License Practice Exam Questions and Answers | Updated 2024/2025 | Graded A+
  • Minnesota Special Engineer Boiler License Practice Exam Questions and Answers | Updated 2024/2025 | Graded A+

  • Exam (elaborations) • 7 pages • 2024
  • For the purpose of rating boiler horsepower for an Engineers License only, how many square feet of boiler surface shall be equivalent to one boiler horsepower on a boiler? - ANSWER 10 Sq. Ft. Heating Surface What is meant by the term "Low Pressure Boiler"? - ANSWER Boilers operating at a steam or other vapor pressure of 15psig or less, or a hot water or other liquid boiler in which the pressure does not exceed 160 psig or a temperature of 250 degrees F. A person holding a current State ...
    (0)
  • $12.49
  • 1x sold
  • + learn more
Nccco Core + Specialty Test Prep Questions and Answers 100% Correct
  • Nccco Core + Specialty Test Prep Questions and Answers 100% Correct

  • Exam (elaborations) • 13 pages • 2024
  • Nccco Core + Specialty Test Prep Questions and Answers 100% CorrectNccco Core + Specialty Test Prep Questions and Answers 100% CorrectNccco Core + Specialty Test Prep Questions and Answers 100% CorrectNccco Core + Specialty Test Prep Questions and Answers 100% Correct ASME B30.5 - ANSWER - Mobile and Locomotive cranes, all types ASME B30.3 - ANSWER - Tower Cranes ASME B30.23 - ANSWER - Personel Lifting Regs OSHA 29 CFR 1926.1400 Series - ANSWER - Cranes & Derrick's used in Constructio...
    (0)
  • $11.99
  • + learn more
CETP 1.0: Module 8 2024 | Questions with 100% Correct Answers | Verified | Latest Update | Graded A+
  • CETP 1.0: Module 8 2024 | Questions with 100% Correct Answers | Verified | Latest Update | Graded A+

  • Exam (elaborations) • 5 pages • 2024
  • CETP 1.0: Module 8 2024 | Questions with 100% Correct Answers | Verified | Latest Update | Graded A+ All cylinders built today are built according to _____ specifications. Before 1967, these specifications were under the control of the Interstate Commerce Commission. - A. EPA B. ASME C. PERC D. DOT Which of the following is a type of cylinder? - A. Cargo B. Return C. Portable D. Movable Regardless of the intended service every cylinder has a device to protect the cylinder _____. - A. Va...
    (0)
  • $9.49
  • 1x sold
  • + learn more
Nccco Core + Specialty Test Prep QUESTIONS AND ANSWERS CORRECT SOLUTIONS(RATED A+)
  • Nccco Core + Specialty Test Prep QUESTIONS AND ANSWERS CORRECT SOLUTIONS(RATED A+)

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • ASME B30.5 - ANSWER Mobile and Locomotive cranes, all types ASME B30.3 - ANSWER Tower Cranes ASME B30.23 - ANSWER Personel Lifting Regs OSHA 29 CFR 1926.1400 Series - ANSWER Cranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - ANSWER 2 randomly broken wires in 6 diameters. Load test platform 125% / 5 minutes before use. Frequent + daily inspection. 100' per minute lower speed. Gate must Open Inward. OSHA 29 CFR 1926.1402 Ground Conditions - ANSWER...
    (0)
  • $14.99
  • + learn more
Nccco Core + Specialty Test Prep Questions & Answers(RATED A+)
  • Nccco Core + Specialty Test Prep Questions & Answers(RATED A+)

  • Exam (elaborations) • 12 pages • 2024
  • ASME B30.5 - ANSWERMobile and Locomotive cranes, all types ASME B30.3 - ANSWERTower Cranes ASME B30.23 - ANSWERPersonel Lifting Regs OSHA 29 CFR 1926.1400 Series - ANSWERCranes & Derrick's used in Construction regs. Rotation Resistant Wire Rope - ANSWER2 randomly broken wires in 6 diameters. 4 randomly broken wires in 30 diameters. Safety factor 5.0 Safety factor personel lifts 10-1 ASME B30.9 - ANSWERSlings Extended Crawlers Will? - ANSWERIncrease over the side ca...
    (0)
  • $13.99
  • + learn more
API 570 - Open Book - Practice Exam 2024 Already Passed
  • API 570 - Open Book - Practice Exam 2024 Already Passed

  • Exam (elaborations) • 22 pages • 2024
  • A Hydrotest is conducted on an underground line as a substitute for the external inspection. The test pressure is 200 Psig. At the end of the test, the pressure must be at least - API 570 9.8.6 190 Psig. Determine the maximum allowed pressure for a Class 300 flange that has a design temperature of 950 °F. The flange material is ASTM A217 Gr. C12 - B16.5 Table 1.1-1 375 Psig. An 8 NPS pipe is being replaced with A106 gr. B material. The pipe retirement thickness (Tmin) is 0.218" and the ...
    (0)
  • $10.99
  • + learn more
NCCCO TWR Practice Test Study Guide  Exam with 100% Verified Answers
  • NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers

  • Exam (elaborations) • 11 pages • 2024
  • NCCCO TWR Practice Test Study Guide Exam with 100% Verified Answers 1. Which of the following OSHA regulations govern suspended personnel platforms? - CORRECT ANSWER-OSHA 1926.550(g) 2. According to ASME B30.3, the prohibited zone for power lines that are 60kV is? - CORRECT ANSWER-15ft 3. According to ASME B30.3, load hoist rotation resistant wire rope has a design factor of? - CORRECT ANSWER-5 to 1 4. According to ASME B30.3, when lifting a suspended personnel platform the design fa...
    (0)
  • $13.49
  • + learn more