Bmps swppp - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Bmps swppp? On this page you'll find 49 study documents about Bmps swppp.
All 49 results
Sort by
-
DEQ- Stormwater Management Inspector Exam Questions and Answers Graded A 2024
- Exam (elaborations) • 8 pages • 2024
-
Available in package deal
-
- $11.99
- 1x sold
- + learn more
What two plans in the SWPPP must be approved? - Erosion and sediment control plans and stormwater management plans must be approved. 
 
Does the stormwater management plan address runoff during construction or after? - The stormwater management plan addresses post-construction stormwater runoff. 
 
What impact does impervious cover have on water quality? - The volume and velocity of stormwater runoff increases as natural vegetation is replaced with roads, buildings, parking areas and other imper...
-
CISEC Exam with verified answers
- Exam (elaborations) • 10 pages • 2023
-
- $8.99
- 10x sold
- + learn more
CISEC Exam with verified answers 
LDP. 
 
NPDES 
 
 
CWA Penalty Types 
 
What documents are required on site? 
 
Who is the "operator"? Also the LRP. 
When do you need permit coverage? 
 
Large Land Development 
 
Vertical Projects 
 
Bix Box Projects 
 
Linear Projects 
) 
 
What is erosion? 
What are the three types of Wind Erosion? 
 
Which method of wind erosion moves the most soil? 
 
What are the types of water erosion? 
 
Raindrop Erosion 
 
Sheet Erosion 
 
Rill and Gull...
-
CEPSCI PRACTICE TEST
- Exam (elaborations) • 14 pages • 2023
-
- $13.49
- 1x sold
- + learn more
1972 clean water act 
Administered by the US environmental protection agency (EPA) Created the NPDES 
 
 
 
1987 
Amendment to CWA CALLED WATER QUALITY ACT 
 
 
 
NPDES in south carolina 
South Carolina is NPDES delegated state. 
 
 
 
NPDES regulations are administered by 
SCDHEC 
 
 
 
CGP authorizes 
stormwater discharges from construction sites 
 
 
 
Who must obtain NPDES coverage 
land disturbing activities greater than or equal to 1 acre 
-land disturbance less than 1 ac within 1/2 miles ...
-
BMPs SWPPP TEST 2024
- Exam (elaborations) • 4 pages • 2024
- Available in package deal
-
- $8.49
- + learn more
BMPs SWPPP TEST 2024...
-
BMPs SWPPP – Questions & Fully Detailed Answers
- Exam (elaborations) • 3 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
BMPs SWPPP – Questions & Fully Detailed Answers
Too much month left at the end of the money?
-
COSC 253 Exam 1 || Already Passed.
- Exam (elaborations) • 15 pages • 2024
-
Available in package deal
-
- $11.99
- + learn more
A _____ of______ is an individual authorization by TCEQ allowing you to proceed with construction. correct answers Notice, Intent 
 
A Construction Site Notice is required for all sites greater than____ acre. correct answers one 
 
TCEQ stands for_______. correct answers Texas Commission on Environmental Quality 
 
SWPPP stands for_______. correct answers Stormwater Pollution Prevention Plan 
 
(T/F) The SWPPP must remain on site at all times. correct answers T 
 
SWPPP inspections are required ...
-
CISEC Exam Latest 2024 Updated Questions with 100% Correct Answers | Updated | Download to score A+
- Exam (elaborations) • 26 pages • 2024
-
- $12.99
- + learn more
CISEC Exam Latest 2024 Updated Questions with 100% Correct Answers | Updated | Download to score A+ .LDP. NPDES CWA Penalty Types What documents are required on site? Who is the "operator"? Also the LRP. When do you need permit coverage? Large Land Development Vertical Projects Bix Box Projects Linear Projects ) What is erosion? What are the three types of Wind Erosion? Which method of wind erosion moves the most soil? What are the types of water erosion? Raindrop Erosion Sheet Erosion Rill an...
-
CISEC ACTUAL EXAM (20242025) QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+ GRADE BOOSTER UPDATE
- Exam (elaborations) • 26 pages • 2024
-
- $13.49
- + learn more
CISEC ACTUAL EXAM 20242025 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+ GRADE BOOSTER UPDATE LDP. NPDES CWA Penalty Types What documents are required on site? Who is the "operator"? Also the LRP. When do you need permit coverage? Large Land Development Vertical Projects Bix Box Projects Linear Projects ) What is erosion? What are the three types of Wind Erosion? Which method of wind erosion moves the most soil? What are the types of water erosi...
-
CESSWI Part 2 Exam Questions And Answers All Verified
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
CESSWI Part 2 Exam Questions And Answers All Verified 
 
Multiple Hat Role 
Primary Role - Determine Regulatory Compliance of site 
Official Representative On-Site 
Fact Finder and Record Keeper 
Enforcement Case Developer 
Technical Instructor 
 
 
CESSWI 
Certified Erosion, Sediment and StormWater Inspector 
 
 
Good Inspectors Skills 
Inquisitiveness, Thoroughness, Consistency, Integrity, Conflict Resolution, and Communication 
 
 
Plan Types 
SWPPP, ESCP, Drainage/Grading Plan, SPCC, SWMP 
...
-
Cesswi 2 Questions And Answers 2024 Update A+
- Exam (elaborations) • 9 pages • 2024
- Available in package deal
-
- $8.39
- + learn more
Temporary stabilization - Answer-stone or plastic as a BMP to reduce erosion by stabilizing areas that 
will lay bare for an extended amount of time. EX. stockpiles, dikes, dams 
5 types of plans - Answer-1. SWPPP 
2. erosion and sed. plan (ESCP) 
3. drainage plan/grading plan 
4. spill prevention control and countermeasure plan (SPCC) 
5. MS4 stormwater management plan/program (SWMP) 
SWPPP - Answer--required by NPDES for industrial, multi sector, and construction general permits 
-addresses op...
$6.50 for your textbook summary multiplied by 100 fellow students... Do the math: that's a lot of money! Don't be a thief of your own wallet and start uploading yours now. Discover all about earning on Stuvia