Bsci 4610 test 2 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Bsci 4610 test 2? On this page you'll find 4 study documents about Bsci 4610 test 2.

All 4 results

Sort by

BSCI 4610 Test 2 Question and answers rated A+ 2024
  • BSCI 4610 Test 2 Question and answers rated A+ 2024

  • Exam (elaborations) • 5 pages • 2024
  • BSCI 4610 Test 2 Question and answers rated A+ 2024 BSCI 4610 Test 2 owners A compensable delay is a failure of the ______ obligation a project incurs negative float due to non-excusable delays A Recovery Schedule is often required when... shared between the Contractor AND Owner If a contract states that time extensions will only be granted for delays to the critical path, the Contractor can assume that the float of a project is... Time Impact Analysis with Scheduling _____...
    (0)
  • $12.49
  • + learn more
BSCI 4610 Test 1 Question and answers 100% correct 2024
  • BSCI 4610 Test 1 Question and answers 100% correct 2024

  • Exam (elaborations) • 5 pages • 2024
  • BSCI 4610 Test 1 Question and answers 100% correct 2024 BSCI 4610 Test 1 - Holley Hoisting and access are considered top considerations in site utilities. - correct answer T Sites with sand while easy to move, pose security issues - correct answer T Temp. underpinning insulations are considered real schedules activities with real potential to impact the schedule. - correct answer T A dewatering systems with multiple pvc pipes are installed in a sleeve around a project perimete...
    (0)
  • $13.49
  • + learn more
BSCI 4610 Quiz 2 Question and answers rated A+ 2024
  • BSCI 4610 Quiz 2 Question and answers rated A+ 2024

  • Exam (elaborations) • 4 pages • 2024
  • BSCI 4610 Quiz 2 Question and answers rated A+ 2024 BSCI 4610 Quiz 2/Test 1 Project Resources - correct answer Manpower Material Machinery Money Biggest Concerns Regarding Material - correct answer Procurement, Storage, Lead Times Resources: Crew Productivity - correct answer High = 1.2 Standard = 1.0 Below = .85 Ex Crew Productivity - correct answer A Standard Crew 145 yds of 6" concrete. 6,000 cyds on the project. How many days? - 6,000/145(1.0) = 41.4 Days Hig...
    (0)
  • $13.99
  • + learn more