Cm 410 - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cm 410? On this page you'll find 111 study documents about Cm 410.

All 111 results

Sort by

LSU CM 4100 CONSTRUCTION SCHEDULING AND CONTROL QUIZ 3 actual questions and answers 2024-2025 Louisiana State University Popular
  • LSU CM 4100 CONSTRUCTION SCHEDULING AND CONTROL QUIZ 3 actual questions and answers 2024-2025 Louisiana State University

  • Exam (elaborations) • 36 pages • 2024 Popular
  • LSU CM 4100 CONSTRUCTION SCHEDULING AND CONTROL QUIZ 3 actual questions and answers Louisiana State University
    (1)
  • $12.49
  • 1x sold
  • + learn more
LSU CM 4100 Construction Scheduling and Cost Control Quiz 1 scored 100 out of 100 2024-2025 Louisiana State University
  • LSU CM 4100 Construction Scheduling and Cost Control Quiz 1 scored 100 out of 100 2024-2025 Louisiana State University

  • Exam (elaborations) • 10 pages • 2024
  • LSU CM 4100 Construction Scheduling and Cost Control Quiz 1 scored 100 out of Louisiana State University
    (0)
  • $12.49
  • 1x sold
  • + learn more
CM 4100 Construction Scheduling and Cost Control passed quiz 4 2024-2025 Louisiana State University
  • CM 4100 Construction Scheduling and Cost Control passed quiz 4 2024-2025 Louisiana State University

  • Exam (elaborations) • 25 pages • 2024
  • CM 4100 Construction Scheduling and Cost Control passed quiz Louisiana State University
    (1)
  • $13.99
  • + learn more
SCM 410 Exam 2024/2025 with 100% correct answers
  • SCM 410 Exam 2024/2025 with 100% correct answers

  • Exam (elaborations) • 23 pages • 2024
  • supply chain A set of three or more entities (organizations or individuals) directly involved in the upstream and downstream flows of products, services, finances, and/or information from a source to a customer. Supply Chain Orientation The recognition by an organization of the systemic, strategic implications of the tactical activities involved in managing the various flows in a supply chain Previous Pause Next Rewind 10 seconds Move forward 10 seconds Unmute 0:08 / 0:...
    (0)
  • $16.99
  • + learn more
CM 4101 Exam 1 Questions And Answers 2024
  • CM 4101 Exam 1 Questions And Answers 2024

  • Exam (elaborations) • 15 pages • 2024
  • CM 4101 Exam 1 Questions And Answers 2024 (ESi) (EFi) (LFi) (LSi) (Ti) (TFi) (FFi) - ANS-Early Activity Start Early Activity Finish Late Activity Finish Late Activity Start Duration Total Float Free Float Why Plan, Schedule and Control? (6) - ANS--Complexity of construction projects -To control resource consumption -To communicate the construction plan -To establish production goals -To monitor and measure project progress -To manage changes What is a primary means that gen...
    (0)
  • $13.99
  • + learn more
CM 410 Final Exam Questions And Answers 100% Correct
  • CM 410 Final Exam Questions And Answers 100% Correct

  • Exam (elaborations) • 8 pages • 2024
  • Available in package deal
  • 5 types of bonds* - ANSWERBid bond Performance bond Payment bond Warranty bond Green bond *A101* - ANSWERLUMP sum contract *A111* - ANSWERCOST OF THE WORK PLUS FEE *A121 CMc* - ANSWERCM @ Risk *A131 CMc* - ANSWERCM @ Management A141 - ANSWERDesign-build *A201* - ANSWERGeneral Conditions A401 - ANSWERAgreement between contractor and sub All Risk Insurance - ANSWERInsurance that covers loss caused by all perils except those specifically excluded in the contract. Cover...
    (0)
  • $14.99
  • + learn more
LSU CM 4100 Construction Scheduling and Cost Control study ahead complete | questions and answers 2024-2025 |Louisiana State University
  • LSU CM 4100 Construction Scheduling and Cost Control study ahead complete | questions and answers 2024-2025 |Louisiana State University

  • Exam (elaborations) • 34 pages • 2024
  • LSU CM 4100 Construction Scheduling and Cost Control study ahead complete | questions and answers |Louisiana State University
    (0)
  • $12.49
  • + learn more
CM 4101 Final Exam Prep Test Questions Answered 100% Correct
  • CM 4101 Final Exam Prep Test Questions Answered 100% Correct

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • Bar Charts - Answer simple and time scaled presentations that show how major work activities are scheduled advantages bar charts - Answer simple and easy to use disadvantages bar charts - Answer -cannot determine project status -cannot determine needs for adjustments -activites for acceleration cannot be determined -relies on extra links to show logical relationships between activities, otherwise relationships cannot be determined networks - Answer graphic representations using nodes and...
    (0)
  • $12.99
  • + learn more
CM 4101 Exam Questions Solved 100% Correct
  • CM 4101 Exam Questions Solved 100% Correct

  • Exam (elaborations) • 15 pages • 2024
  • Available in package deal
  • What are graphic representations using nodes and links. - Answer Networks What is a discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. - Answer Activity What is the point in time or an instant at which the status of completion of a project or an activity can be defined. - Answer Even
    (0)
  • $12.74
  • + learn more