Cosc 275 exam 2 - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Cosc 275 exam 2? On this page you'll find 63 study documents about Cosc 275 exam 2.
All 63 results
Sort by
-
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023
- Exam (elaborations) • 10 pages • 2023
-
Available in package deal
-
- $30.49
- 3x sold
- + learn more
COSC 275 Exam 1 Palmer Questions and Answers fully solved 2023 
Estimating: 
The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. 
 
 
 
Take-off: 
The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the project. 
 
 
 
Quantities: 
Measured amounts of construction...
-
COSC 275 EXAM 2 LATEST UPDATE
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $9.49
- + learn more
COSC 275 EXAM 2 LATEST UPDATE...
-
COSC 275 Exam 2 Palmer; Questions and Answers % Correct
- Exam (elaborations) • 14 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
COSC 275 Exam 2 Palmer; Questions and 
Answers % Correct 
Hard bid low price Correct answer-Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
Competitive sealed proposals Correct answer-Involves criteria other than price when 
awarding contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule
-
COSC 275 Exam 2 (Palmer) Questions with Correct Answers
- Exam (elaborations) • 11 pages • 2024
-
- $12.99
- + learn more
Hard bid low price Correct Answer-Owner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
 
Competitive sealed proposals Correct Answer-Involves criteria other than price when awarding contract 
Weight given to each criteria that will be considered 
 
Construction Manager at Risk CMAR Correct Answer-Construction manager hired in design phase to assist designer in constructibility. Also gives the owner a good handle on the cost. 
 
Design Build Correct Answer-Only one co...
-
COSC 275 Exam 2 Palmer Study Guide
- Exam (elaborations) • 7 pages • 2024
-
- $13.49
- + learn more
COSC 275 Exam 2 Palmer Study Guide
Get paid weekly? You can!
-
COSC 275 Exam 2 Palmer; Questions and Answers % Correct
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
COSC 275 Exam 2 Palmer; Questions and 
Answers % Correct 
Measures Correct answer-1" = 25.40 milimeters 
1 sq. M(m^2) = 10.764 sq. ft or = 1.196 sq. yd. 
1 kg = 2.2046 lbs 
Geometric Formula: 
Circle Correct answer-Circumference =2r*pi 
Area = pi*r^2 
Geometric Formula: 
Triangle Correct answer-Area: B*1/2H
-
COSC 275 EXAM 2 WITH QUESTIONS AND ANSWERS
- Exam (elaborations) • 5 pages • 2024
- Available in package deal
-
- $8.99
- + learn more
COSC 275 EXAM 2 WITH QUESTIONS AND ANSWERS...
-
COSC 275 Exam 2 (Palmer) | Latest Update | 2024/2025 | Graded A+
- Exam (elaborations) • 13 pages • 2024
-
Available in package deal
-
- $10.00
- + learn more
COSC 275 Exam 2 (Palmer) | Latest 
Update | 2024/2025 | Graded A+ 
 
Air Barrier A component of the envelop system that prohibits air leakage into a building and 
reduces the risk of condensation build up. House wrap and fluid applied barriers are examples. 
 
Air/Vapor Barrier is always installed on (Inside/outside) of wall. Inside 
 
Anchor Bolt A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, 
or machinery 
 
Beam A structural member that primarily resists load...
-
COSC 275 Exam 2 Palmer Questions And Answers 100% Verified.
- Exam (elaborations) • 7 pages • 2024
- Available in package deal
-
- $11.49
- + learn more
COSC 275 Exam 2 Palmer Questions And 
Answers 100% Verified. 
Hard bid low price - answerOwner hires architect 
Architect designs 
Contractors bid 
Awarded to low bidder 
Competitive sealed proposals - answerInvolves criteria other than price when awarding 
contract 
Weight given to each criteria that will be considered 
Criteria: (changes) 
- Cost 
- Previous experience 
- Qualification of staff 
- Financial stability 
- Project schedule 
Construction Manager at Risk CMAR - answerConstruction m...
-
COSC 275 Exam 2 Palmer With Complete Solution
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $13.99
- + learn more
COSC 275 Exam 2 Palmer With Complete Solution...
-
COSC 275 EXAM 2 PALMER QUESTIONS & ANSWERS SCORED A+ TO PASS!!
- Exam (elaborations) • 6 pages • 2024
- Available in package deal
-
- $7.99
- + learn more
Girder - Answer-A large principal beam of steel, reinforced concrete, wood, or a combination of these, 
used to support other structural members at isolated points along its length 
Anchor Bolt - Answer-A threaded bolt, usually embeded in a foundation, for sealing a sill, framework, or 
machinery 
Beam - Answer-A structural member that primarily resists loads applied laterally to the axis 
Column - Answer-A long, relatively slender, supporting pillar. A column is usually loaded axially in 
compr...