Crane load charts exam - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Crane load charts exam? On this page you'll find 44 study documents about Crane load charts exam.

All 44 results

Sort by

NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) Popular
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% VERIFIED) Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed fro...
    (0)
  • $14.99
  • 1x sold
  • + learn more
Crane Load Charts Exam Review Questions and Answers
  • Crane Load Charts Exam Review Questions and Answers

  • Exam (elaborations) • 6 pages • 2024
  • Crane configuration includes - Reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction. How does the operator determine the manufacturers recommended rope for the crane - Read the manufacturer load chart or operator manual. Capacities above the bold line on the load chart are based on. - Structural Strength If replacing the hoist line wire rope on a crane, howdo you determine the size or type of wire rope t...
    (0)
  • $8.00
  • + learn more
NCCCO Crane Load Charts Exam Review Questions and Answers
  • NCCCO Crane Load Charts Exam Review Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • Who can recreate or replace load charts for cranes? Only the crane manufacturer What is the gross load? The total weight of everything below the boom tip. What is the Net load? The gross load minus all applicable deductions. Do all cranes have both structural and stability based load charts? No. They are no longer required to. Name some requirements for a load chart to be accurate. Equipment in original condition Operated by experienced and qualified personnel Ideal weather conditions...
    (0)
  • $8.00
  • + learn more
OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED)

  • Exam (elaborations) • 23 pages • 2024
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (GRADED) The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required in the construction...
    (0)
  • $15.99
  • + learn more
OECP Exam Questions With 100% Correct Answers Latest Update 2024/2025 (VERIFIED)
  • OECP Exam Questions With 100% Correct Answers Latest Update 2024/2025 (VERIFIED)

  • Exam (elaborations) • 23 pages • 2024
  • OECP Exam Questions With 100% Correct Answers 2024/2025 (VERIFIED) The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required in the constructi...
    (0)
  • $14.99
  • + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 13 pages • 2024
  • Available in package deal
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom h...
    (0)
  • $13.99
  • + learn more
NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

  • Exam (elaborations) • 13 pages • 2024
  • NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from...
    (0)
  • $14.49
  • + learn more
OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)
  • OECP Exam Questions With 100% Correct Answers, Latest Updated 2024/2025 (GRADED)

  • Exam (elaborations) • 23 pages • 2024
  • What are the four different types of crane signals? Hand Voice Audible New 2. The shaded area on a load chart indicates _______? A structural chart 3. The minimum distance to a power line of unknown voltage is ? 50' 4. When hoisting personnel and have known voltage, can you use Table A and get closer than 20'? Never! 5. What is the minimum tale swing clearance requirement 2' 6. What kind of rigger is required for A/D? Qualified Rigger 7. Signal training is now required i...
    (0)
  • $15.49
  • + learn more
NCCCO Practice Exam Questions and Answers (Graded A)
  • NCCCO Practice Exam Questions and Answers (Graded A)

  • Exam (elaborations) • 6 pages • 2024
  • NCCCO Practice Exam Questions and Answers (Graded A)NCCCO Practice Exam Questions and Answers (Graded A)NCCCO Practice Exam Questions and Answers (Graded A)NCCCO Practice Exam Questions and Answers (Graded A) Crane configuration includes: A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or mounted, off sets, wire rope type or construction B. hoist drum speeds, line pull, wire rope size and rigging C. load charts, LMI, axle weights and center of ...
    (0)
  • $11.49
  • + learn more
NCCCO MOBILE CRANE / NCCCO  MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100  QUESTIONS AND CORRECT  DETAILED ANSWERS VERIFIED  ANSWERS GRADED A+
  • NCCCO MOBILE CRANE / NCCCO MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS VERIFIED ANSWERS GRADED A+

  • Exam (elaborations) • 29 pages • 2024
  • NCCCO MOBILE CRANE / NCCCO MOBILE CRANE EXAM 2023- 2024 ACTUAL EXAM 100 QUESTIONS AND CORRECT DETAILED ANSWERS VERIFIED ANSWERS GRADED A+ Where must the operator's manual be kept during crane operations? - ANSWER-The operator's manual must be kept in the cab at all times. According to ASME B30.5, what are the minimal requirements to meet crane operatorqualifications? - ANSWER-Physical, Written Test, Practical Test What hand signal must be obeyed at all times? - ANSWER-Stop ...
    (0)
  • $22.49
  • + learn more