Cslb test 2 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cslb test 2? On this page you'll find 308 study documents about Cslb test 2.

All 308 results

Sort by

CSLB Concrete C8 License Practice Test #2 Exam |  Questions and Answers Graded A+ Latest 2024/2025 Popular
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 100 pages • 2024
  • Available in package deal
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025 The maximum size of the conduit or pipe shall NOT exceed _______ of the thickness of the concrete. - CORRECT ANSWER 1/3 Which of the following tests for concrete is conducted at the site/field? - CORRECT ANSWER Color Test Explanation: Rest of the above are laboratory tests. If the concrete compressive strength specified is less than 3600 psi, it has the option of being tested at 28 days...
    (0)
  • $12.49
  • 1x sold
  • + learn more
CSLB Test 5 Exam | Questions and Answers  Graded A+ Latest 2024/2025
  • CSLB Test 5 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 34 pages • 2024
  • CSLB Test 5 Exam | Questions and Answers Graded A+ Latest 2024/2025 Where the voltage between conductors exceeds 300 volts, the minimum clearance of service drop conductors from flat roof structures is at least a. 3' b. 4' c. 8' d. 10' 8' Service conductors must have a clearance of not less than __ from windows a. 3' b. 4' c. 8' d. 10' 3' An appliance on a 20-amp branch circuit may not draw more than a. 5 amps b. 12 amps c. 16 amps d. 20 amps 16 amps What is the ...
    (0)
  • $12.49
  • + learn more
CSLB CONTRACTOR'S EXAM PRACTICE QUESTIONS AND ANSWERS LATEST UPDATE 2023-2024
  • CSLB CONTRACTOR'S EXAM PRACTICE QUESTIONS AND ANSWERS LATEST UPDATE 2023-2024

  • Exam (elaborations) • 24 pages • 2023
  • CSLB CONTRACTOR'S EXAM PRACTICE QUESTIONS AND ANSWERS LATEST UPDATE 2023-2024. Which act establishes the rights of workers to organize into unions and negotiate contracts? - Answer National Labor Relations Act of 1935 A contractor has had a problem with employees stealing tools and equipment from job sites. When conducting job interviews, may the contractor ask prospective employees about their arrest records? A. It is legal to ask prospective employees about arrests not leading to convi...
    (1)
  • $14.49
  • 3x sold
  • + learn more
CSLB Test 5 Exam | Questions and Answers  Graded A+ Latest 2024/2025
  • CSLB Test 5 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 34 pages • 2024
  • CSLB Test 5 Exam | Questions and Answers Graded A+ Latest 2024/2025 Where the voltage between conductors exceeds 300 volts, the minimum clearance of service drop conductors from flat roof structures is at least a. 3' b. 4' c. 8' d. 10' 8' Service conductors must have a clearance of not less than __ from windows a. 3' b. 4' c. 8' d. 10
    (0)
  • $20.49
  • + learn more
CSLB Concrete C8 License Practice Test #2 Exam |  Questions and Answers Graded A+ Latest 2024/2025
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 49 pages • 2024
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025 In order to install electric fire alarms you must have a - CORRECT ANSWER C-10 electrical license Contractor must notify registrar of a change in address in - CORRECT ANSWER 90 days Inactive license renewal - CORRECT ANSWER 4 years Active license renewal - CORRECT ANSWER 2 years Expired license renewal - CORRECT ANSWER 5 years GC has ____ days to pay subs - CORRECT ANSWER 7 Number of wo...
    (0)
  • $7.99
  • + learn more
CSLB Concrete C8 License Practice Test 2 Questions with 100% Correct Answers | Latest Version (2024/2025) Expert Verified | Ace the Test
  • CSLB Concrete C8 License Practice Test 2 Questions with 100% Correct Answers | Latest Version (2024/2025) Expert Verified | Ace the Test

  • Exam (elaborations) • 21 pages • 2024
  • Available in package deal
  • CSLB Concrete C8 License Practice Test 2 Questions with 100% Correct Answers | Latest Version (2024/2025) Expert Verified | Ace the Test
    (0)
  • $12.49
  • + learn more
CSLB Contractor's Law Test Part 2 Questions with 100% Correct Answers | Latest Version (2024/2025) Expert Verified | Ace the Test
  • CSLB Contractor's Law Test Part 2 Questions with 100% Correct Answers | Latest Version (2024/2025) Expert Verified | Ace the Test

  • Exam (elaborations) • 22 pages • 2024
  • Available in package deal
  • CSLB Contractor's Law Test Part 2 Questions with 100% Correct Answers | Latest Version (2024/2025) Expert Verified | Ace the Test
    (0)
  • $12.49
  • + learn more
CSLB Concrete C8 License Practice Test #2 Exam |  Questions and Answers Graded A+ Latest 2024/2025
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 49 pages • 2024
  • Available in package deal
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025 In order to install electric fire alarms you must have a - CORRECT ANSWER C-10 electrical license Contractor must notify registrar of a change in address in - CORRECT ANSWER 90 days Inactive license renewal - CORRECT ANSWER 4 years Active license renewal - CORRECT ANSWER 2 years Expired license renewal - CORRECT ANSWER 5 years GC has ____ days to pay subs - CORRECT ANSWER 7 Number of wo...
    (0)
  • $12.49
  • + learn more
CSLB Concrete C8 License Practice Test #2 Exam |  Questions and Answers Graded A+ Latest 2024/2025
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025

  • Exam (elaborations) • 100 pages • 2024
  • CSLB Concrete C8 License Practice Test #2 Exam | Questions and Answers Graded A+ Latest 2024/2025 The maximum size of the conduit or pipe shall NOT exceed _______ of the thickness of the concrete. - CORRECT ANSWER 1/3 Which of the following tests for concrete is conducted at the site/field? - CORRECT ANSWER Color Test Explanation: Rest of the above are laboratory tests. If the concrete compressive strength specified is less than 3600 psi, it has the option of being tested at 28 days...
    (0)
  • $20.49
  • + learn more