In areas where future excavation is anticipated, it may be 
advisable to place the cable at a greater depth. For example, if 
road grading that will remove 610 mm (24 in) of dirt is planned in 
a particular area, it would be wiser to initially place the cable at 
1.2 m (4 ft) versus the standard 
610 mm (24 in). - ANSWER True 
Placing all of the conduits during the initial conduit system 
installation is desirable, 
if not mandatory. 
...
-
OSP-001 PRACTISE TEST QUESTIONS AND ANSWERS GRADED A+
- Exam (elaborations) • 102 pages • 2024
-
- $12.49
- + learn more
OSP-001 PRACTISE TEST QUESTIONS 
 
AND ANSWERS GRADED A+ 
 
### True or False Statements 
 
**Is it advisable to place cables at a greater depth in areas where future excavation is 
anticipated? For instance, if 610 mm (24 in) of dirt removal is planned, would it be wiser to place 
the cable at 1.2 m (4 ft) instead of the standard 610 mm (24 in)?** 
 True 
 
**Should all conduits be installed during the initial conduit system installation?** 
 True 
 
**Is it always necessary to build new pathwa...
-
OSP-001 PRACTISE TEST QUESTIONS AND ANSWERS ALL CORRECT
- Exam (elaborations) • 43 pages • 2024
- Available in package deal
-
- $14.99
- + learn more
OSP-001 PRACTISE TEST QUESTIONS AND ANSWERS ALL CORRECT 
 
 
in areas where future excavation is anticipated, it may be advisable to place the cable at a greater depth. For example, if road grading that will remove 610 mm (24 in) of dirt is planned in a particular area, it would be wiser to initially place the cable at 1.2 m (4 ft) versus the standard 
610 mm (24 in). - ANS True 
 
placing all of the conduits during the initial conduit system installation is desirable, 
if not mandatory. 
*Tr...
-
OSP-001 PRACTISE TEST (A+ GRADED) 2024.
- Exam (elaborations) • 42 pages • 2023
-
Available in package deal
-
- $13.99
- + learn more
in areas where future excavation is anticipated, it may be advisable to place the cable at a greater depth. For example, if road grading that will remove 610 mm (24 in) of dirt is planned in a particular area, it would be wiser to initially place the cable at 1.2 m (4 ft) versus the standard 
610 mm (24 in). correct answers True 
 
placing all of the conduits during the initial conduit system installation is desirable, 
if not mandatory. 
*True 
*False correct answers True 
 
It is not always ne...
-
Bicsi RTPM 002 section 1 Site Survey question correctly answered 2023
- Exam (elaborations) • 3 pages • 2023
- Available in package deal
-
- $8.99
- 1x sold
- + learn more
Bicsi RTPM 002 section 1 Site Survey question correctly answered 2023Pathway Considerations 
In planning for OSP cabling, cable infrastructure must be determined irst. The choices are underground, direct-buried, and aerial. 
 
 
 
Underground plant 
most expensive system, has the highest cable placement capacity, longest projected lifespan, typically in excess of 50 years. Highest initial cost 
 
 
 
Direct-buried plant 
A lifespan of 30 years or shorter, depending on different conditions 
 
 
 ...
Get paid weekly? You can!
-
Bicsi RTPM 002 section 1 Site Survey Exam 2024
- Exam (elaborations) • 3 pages • 2024
-
- $10.49
- + learn more
Bicsi RTPM 002 section 1 Site Survey Exam 2024 
Pathway Considerations -Answer-In planning for OSP cabling, cable infrastructure must 
be determined irst. The choices are underground, direct-buried, and aerial. 
Underground plant -Answer-most expensive system, has the highest cable placement 
capacity, longest projected lifespan, typically in excess of 50 years. Highest initial cost 
Direct-buried plant -Answer-A lifespan of 30 years or shorter, depending on different 
conditions 
Aerial plant -...
-
BICSI RTPM 002 SECTION 1 SITE SURVEY EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $7.99
- + learn more
BICSI RTPM 002 SECTION 1 SITE SURVEY EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED 
 
Pathway Considerations 
In planning for OSP cabling, cable infrastructure must be determined irst. The choices are underground, direct-buried, and aerial. 
Underground plant 
most expensive system, has the highest cable placement capacity, longest projected lifespan, typically in excess of 50 years. Highest initial cost 
Direct-buried plant 
A lifespan of 30 years or shorter, depending on different conditions...
-
RAILWAY PROTECTION FORCE (RPF) CONSTABLE MOCK TEST 2024 QUESTIONS AND ANSWERS SOLVED 100%
- Exam (elaborations) • 36 pages • 2024
-
- $16.49
- + learn more
RAILWAY PROTECTION FORCE (RPF) CONSTABLE MOCK TEST 2024 QUESTIONS AND ANSWERS SOLVED 100% 
 
According to the definition in 14 CCR 895.1, define the two conditions required in the abandonment of a forest road. Ans- 1. Leaving a logging road reasonably impassable to standard production 4WD vehicles; 
 
2. Leaving a logging road and landings in a condition which provides for long-term functioning of erosion controls with little or no continuing maintenance 
 
For THP planning, how would you de...
-
Bicsi RTPM 002 section 1 exam 2023 with 100% correct answers
- Exam (elaborations) • 3 pages • 2023
-
Available in package deal
-
- $16.49
- + learn more
Pathway Considerations - correct answer In planning for OSP cabling, cable infrastructure must be determined irst. The choices are underground, direct-buried, and aerial. 
 
Underground plant - correct answer most expensive system, has the highest cable placement capacity, longest projected lifespan, typically in excess of 50 years. Highest initial cost 
 
Direct-buried plant - correct answer A lifespan of 30 years or shorter, depending on different conditions 
 
Aerial plant - correct an...
-
Bicsi RTPM 002 section 1 Site Survey Exam 2024
- Exam (elaborations) • 3 pages • 2024
-
- $10.49
- + learn more
Bicsi RTPM 002 section 1 Site Survey Exam 2024 
Pathway Considerations -Answer-In planning for OSP cabling, cable infrastructure must 
be determined irst. The choices are underground, direct-buried, and aerial. 
Underground plant -Answer-most expensive system, has the highest cable placement 
capacity, longest projected lifespan, typically in excess of 50 years. Highest initial cost 
Direct-buried plant -Answer-A lifespan of 30 years or shorter, depending on different 
conditions 
Aerial plant -...