Electric reliability act - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Electric reliability act? On this page you'll find 139 study documents about Electric reliability act.

All 139 results

Sort by

NERC TOP System Operations EXAM Questions and Answers (Download To Score An A)
  • NERC TOP System Operations EXAM Questions and Answers (Download To Score An A)

  • Exam (elaborations) • 24 pages • 2023
  • At what torque angle of operation does power typically begin to flow from the generator to the system? A) 90 degrees B) 60 degrees C) 30 degrees D) 10 degrees 10 degrees Choose the answer that best describes the operation of a rotor. A) The stationary part of the transmission system. B) A type of superconductor. C) The stationary element of a generator that has its windings connected to the system. D) The excited (energized) field winding that rotates inside the stator to induce current into the...
    (1)
  • $10.99
  • 1x sold
  • + learn more
NERC Final Assessment Exam Correct answers (Already GRADED A)
  • NERC Final Assessment Exam Correct answers (Already GRADED A)

  • Exam (elaborations) • 98 pages • 2023
  • When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators C. Geothermal generators...
    (1)
  • $11.99
  • 1x sold
  • + learn more
Introduction to Personnel Security with 100% correct answers
  • Introduction to Personnel Security with 100% correct answers

  • Exam (elaborations) • 8 pages • 2023
  • The Hatch Act Represents the beginning of the present-day personnel security program. DoDI 5200.02 Implements policy for the major elements of the personnel security program. 00:32 01:30 Five elements of the Personnel Security Program 1. Designation 2. Investigation 3. Adjudication 4. Reinvestigation 5. Continuous Evaluation EO 12968 The mot prominent of the personnel security executive orders. Limited Access Authorization (LAA) Grant access to classifi...
    (1)
  • $14.59
  • 2x sold
  • + learn more
NERC Certification Exam Questions And Answers 100% Verified.
  • NERC Certification Exam Questions And Answers 100% Verified.

  • Exam (elaborations) • 18 pages • 2024
  • NERC Certification Exam Questions And Answers 100% Verified. True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - correct answer.B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - correct answer.B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities ...
    (0)
  • $11.99
  • + learn more
NERC Certification Exam Questions & Answers
  • NERC Certification Exam Questions & Answers

  • Exam (elaborations) • 27 pages • 2024
  • Available in package deal
  • NERC Certification Exam Questions & Answers True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - ANS-B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - ANS-B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - ANS-B) ...
    (0)
  • $11.99
  • + learn more
NERC Competency study guide Exam test questions with approved Answers 2023/2024
  • NERC Competency study guide Exam test questions with approved Answers 2023/2024

  • Exam (elaborations) • 25 pages • 2024
  • NERC Competency study guide Exam test questions with approved Answers 2023/2024 INT-006-4: Evaluation of Interchange Transactions - correct answer To ensure that responsible entities conduct a reliability assessment of each Arranged Interchange before it is implemented. INT-009-2.1: Implementation of Interchange - correct answer To ensure that Balancing Authorities implement the Interchange as agreed upon in the Interchange confirmation process. INT-010-2.1: Interchange Initiation and...
    (0)
  • $12.49
  • + learn more
NERC BI - RELIABILITY AND FUNCTION WITH 100% CORRECT ANSWERS ALREADY GRADED A+
  • NERC BI - RELIABILITY AND FUNCTION WITH 100% CORRECT ANSWERS ALREADY GRADED A+

  • Exam (elaborations) • 18 pages • 2023
  • Available in package deal
  • FERC The Energy Regulatory Commission; energy authority and governing body NERC The North American Electric Reliability Corporation, certified as the "electric reliability organization" for the continental United States, compliance monitoring FERC functions Regulates transmission of electric, gas and oil Review mergers and acquisitions and corporate transactions by electric companies Protection of high voltage reliability through reliability standards Enforcement of r...
    (0)
  • $14.49
  • + learn more
NERC Certification Exam Questions With Correct Answers
  • NERC Certification Exam Questions With Correct Answers

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • True/False According to the NERC Functional Model, there is no difference between the function and the entity. A) True B) False - Answer B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - Answer B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - Answer B) False True/False ...
    (0)
  • $11.49
  • + learn more
Epri ECE 180 Final Exam Questions Well Answered  2024.
  • Epri ECE 180 Final Exam Questions Well Answered 2024.

  • Exam (elaborations) • 6 pages • 2024
  • What was the first "Big" Blackout? - correct answer November 9, 1965: Northeast Blackout (NY, CT, RI, PA, NJ and Ontario) caused by backup protective relay operation in one 230KV line, remaining lines tripped in 2.5sec, a 4min under-frequency. Load-Loss 20GW, 30M Population, for 13H What is NERC? - correct answer The North American Electric Reliability Council was formed on June 1, 1968 through the Electric Reliability Act of 1967 in the response of the Big Blackout What is EPRI? - co...
    (0)
  • $9.99
  • + learn more
NERC Certification Exam Questions and Correct Answers
  • NERC Certification Exam Questions and Correct Answers

  • Exam (elaborations) • 25 pages • 2024
  • Available in package deal
  • Correct Answer: B) False True/False Analysis type questions are designed to be the least complex from a human cognitive process. A) True B) False - Correct Answer: B) False True/False A Transmission Service Provider is an entity that both owns and operates transmission facilities on the Bulk Electric System. A) True B) False - Correct Answer: B) False True/False The NERC Functional Model is designed so that the functions of Generator Owner and Generator Operator can be...
    (0)
  • $13.49
  • + learn more