What is a general requirement of the location of the installation of a boiler? - ANSWERSAdequate clearance from combustile construction 
 
What temperature must the materials remain under during combustion? - ANSWERS170 degrees 
 
What is a requirement for the access of the boiler? - ANSWERSAccess for operation and maintenance must not be hazardous 
 
What is required upon installation to operate a boiler? - ANSWERSInspection and test resulting in equipment use permit from commissioner 
 
How of...
-
Fdny p-99 c of f Exam 2024 Questions & Answers 100% Updated!
- Exam (elaborations) • 6 pages • 2024 Popular
- Available in package deal
-
- $12.99
- 2x sold
- + learn more
What is a general requirement of the location of the installation of a boiler? - ANSWERSAdequate clearance from combustile construction 
 
What temperature must the materials remain under during combustion? - ANSWERS170 degrees 
 
What is a requirement for the access of the boiler? - ANSWERSAccess for operation and maintenance must not be hazardous 
 
What is required upon installation to operate a boiler? - ANSWERSInspection and test resulting in equipment use permit from commissioner 
 
How of...
-
LP-Gas Texas Bobtail Questions and Answers 100% Pass
- Exam (elaborations) • 23 pages • 2023
-
- $9.99
- 3x sold
- + learn more
LP-Gas Texas Bobtail Questions and Answers 100% Pass 
required for all piping systems that serve _______ psig appliance systems. normally operated at 11 in WC pressure 1/2 
required for all piping systems that serve 1/2 psig appliance systems. normally operated at ______ in WC pressure 11 
above group LP-gas containers must not be located within ____ feet of the vertical plane beneath overhead electric power lines that are over _____ volts 6 600 
Fire Extinquishers must have minimum capacity of ...
-
ASPE CPD Study Questions AH with complete solutions.
- Exam (elaborations) • 35 pages • 2024
- Available in package deal
-
- $14.99
- 2x sold
- + learn more
ASPE CPD Study Questions AH with complete solutions. 
 
 
 
 
 
 
 
 
Front - correct answer. Back 
 
What is the specific weight of water? - correct answer. 62.4 lbs per cubic foot 
 
What happens in a storm and sanitary system after it passes the water test? - correct answer. A smoke pressure test is recommended with a smoke pressure of 1 in wc to prove the system gas tight. 
 
Is an air test acceptable for a storm and sanitary system? - correct answer. Yes, if a water test is not poss...
-
Nyc high pressure boiler license Exam Questions with Correct Answers
- Exam (elaborations) • 22 pages • 2024
-
Available in package deal
-
- $13.29
- 1x sold
- + learn more
Nyc high pressure boiler license 
Exam Questions with Correct 
Answers 
 
The minimum blowdown for a spring loaded safety valve shall be of what percent of set 
pressure? - Answer-10% 
How is the main steam pressure gages tested? - Answer-With an inspectors gage 
Who is in charge of the code for any plumbing installations? - Answer-The nyc plumbing 
code 
When will anchorage or guides be inspected? - Answer-Annually 
How many brass washout plugs does a miniature boiler have? - Answer-3 brass 
wa...
Want to regain your expenses?
-
Hvac Journeyman Exam questions with correct answers
- Exam (elaborations) • 15 pages • 2023
- Available in package deal
-
- $14.49
- 2x sold
- + learn more
Defects on gas piping or fittings shall be _____.(A) repaired(B) replaced or repaired and retested(C) repaired by a certified welder(D) ignored, as the operating pressure is much less than the air test. - Answer B. Fitting shall be replaced or repaired and retested. UMC Section 1316.4.3 
 
Every absorption refrigerating system supported from the ground shall rest on a concrete slab extending not less than _____ the adjoining ground level.(A) 3 inches below(B) 3 inches above (C) 6 inches below(...
-
Test Bank For Modern Refrigeration and Air Conditioning 21st Edition by Andrew D. Althouse, Carl H. Turnquist, Alfred F. Bracciano, Daniel C. Bracciano, Gloria M. Bracciano 9781635638776 Chapter 1-55 Complete Guide.
- Exam (elaborations) • 380 pages • 2022
-
- $23.88
- 24x sold
- + learn more
Test Bank For Modern Refrigeration and Air Conditioning 21st Edition by Andrew D. Althouse, Carl H. Turnquist, Alfred F. Bracciano, Daniel C. Bracciano, Gloria M. Bracciano 8776, 1, 6044, 1 
 
1 - Careers and Certification 
 
2 - Safety 
 
3 - Service Calls 
 
4 - Energy and Matter 
 
5 - Gases 
 
6 - Basic Refrigeration Systems 
 
7 - Tools and Supplies 
 
8 - Working with Tubing and Piping 
 
9 - Introduction to Refrigerants 
 
10 - Equipment and Instruments for Refrigerant Handling and Servic...
-
Nyc high pressure boiler license exam with question and answers latest 2023-2024 update
- Exam (elaborations) • 41 pages • 2024
-
- $13.99
- 1x sold
- + learn more
Nyc high pressure boiler license exam with question and answers latest update 
The minimum blowdown for a spring loaded safety valve shall be of what percent of set pressure? - ANSWER>>10% 
How is the main steam pressure gages tested? - ANSWER>>With an inspectors gage 
Who is in charge of the code for any plumbing installations? - ANSWER>>The nyc plumbing code 
When will anchorage or guides be inspected? - ANSWER>>Annually 
How many brass washout plugs does a miniature b...
-
Test Bank For Modern Refrigeration and Air Conditioning 21st Edition By Andrew D. Althouse, Carl H. Turnquist, Alfred F. Bracciano, Daniel C. Bracciano, Gloria M. Bracciano 9781635638776 Chapter 1-55 Complete Guide .
- Exam (elaborations) • 380 pages • 2023
-
- $26.47
- 2x sold
- + learn more
Test Bank For Modern Refrigeration and Air Conditioning 21st Edition By Andrew D. Althouse, Carl H. Turnquist, Alfred F. Bracciano, Daniel C. Bracciano, Gloria M. Bracciano 8776, 1 . 6044, 1 
 
1 - Careers and Certification 
 
2 - Safety 
 
3 - Service Calls 
 
4 - Energy and Matter 
 
5 - Gases 
 
6 - Basic Refrigeration Systems 
 
7 - Tools and Supplies 
 
8 - Working with Tubing and Piping 
 
9 - Introduction to Refrigerants 
 
10 - Equipment and Instruments for Refrigerant Handling and Servi...
-
NYC High Pressure Boiler License Questions with Correct Answers
- Exam (elaborations) • 22 pages • 2023
- Available in package deal
-
- $12.99
- 1x sold
- + learn more
The minimum blowdown for a spring loaded safety valve shall be of what percent of set pressure? Correct Answer 10% 
 
How is the main steam pressure gages tested? Correct Answer With an inspectors gage 
 
Who is in charge of the code for any plumbing installations? Correct Answer The nyc plumbing code 
 
When will anchorage or guides be inspected? Correct Answer Annually 
 
How many brass washout plugs does a miniature boiler have? Correct Answer 3 brass washout plugs, 1" in size 
 
How often i...