Grounding for pv systems - Study guides, Class notes & Summaries
Looking for the best study guides, study notes and summaries about Grounding for pv systems? On this page you'll find 19 study documents about Grounding for pv systems.
All 19 results
Sort by
-
System Installation Midterm Study Exam And All Correct Answers.
- Exam (elaborations) • 4 pages • 2024
-
Available in package deal
-
- $9.79
- + learn more
locate rafters - Answer A solar panel installer uses a heavy rubber mallet in order to 
 
DIN rail - Answer When assembling a new Outback Power System PV8 combiner for installation, the part of the combiner 
enclosure that holds the circuit breakers is the 
 
738 sq ft - Answer When a 12' by 35' array is installed with an additional 3' of safety space on all sides, roughly how many 
square feet of roof area will be needed? 
 
clearly marked with a barrier - Answer If holes a...
-
Solar Final Study Set ||All Answers Are Correct 100%.
- Exam (elaborations) • 7 pages • 2024
-
Available in package deal
-
- $10.99
- + learn more
local authorities often supplement the NEC with special requirements called __________________ correct answers building ordinances 
 
Article ___ of the NEC covers specific requirements unique to PV systems and installations correct answers 690 
 
The components that connect the PV source circuit to the rest of the system is the _______________ correct answers PV Output circuit 
 
Inverter output circuit requirements are the same as _______ _______ residential wiring requirements correct answers...
-
Photovoltaic Ch 11 Electrical Integration Study Guide Exam And 100% Correct Solutions.
- Exam (elaborations) • 7 pages • 2024
-
Available in package deal
-
- $9.89
- + learn more
1. What NEC article addresses requirements for PV installations? - Answer Article 690 
 
2. What are the nine parts of NEC Article 690? - Answer I. General 
II. Circuit Requirements 
III. Disconnecting Means 
IV. Wiring Methods 
V. Grounding 
VI. Marking 
VII. Connection to Other Sources 
VIII. Storage Batteries 
IX. Systems Over 600 Volts 
 
3. Draw a diagram to illustrate the electrical integration of PV systems. - Answer 
 
4. How to determine the maximum DC voltage of a PV s...
-
NABCEP PV ASSOCIATE RETAKE EXAM|RETAKE PRACTICE EXAM LATEST EXAM 2024|ALL QUESTIONS AND CORRECT VERIFIED ANSWERS|100% GUARANTEED TO PASS!|ALREADY GRADED A+/BRAND NEW VERSION
- Exam (elaborations) • 24 pages • 2024
-
- $11.99
- + learn more
NABCEP PV ASSOCIATE RETAKE EXAM|RETAKE PRACTICE 
EXAM LATEST EXAM 2024|ALL QUESTIONS AND CORRECT 
VERIFIED ANSWERS|100% GUARANTEED TO 
PASS!|ALREADY GRADED A+/BRAND NEW VERSION 
An off-grid installation has a 1HP pump that is on 10% of the time and a 20W light that is on 100% of 
the time. What is the monthly energy use? - ANSWER-68KWh 
1HP = 746W 
746W * 0.1 * 24hours * 30days = 53712Wh 
20W * 24hrs * 30days = 14400Wh 
14400 + 53712 = 68112Wh 
68kWh 
What kind of ground faults do most inverters...
-
Master Electrician (First Set 1-85) with Complete Solutions
- Exam (elaborations) • 8 pages • 2024
-
- $12.49
- + learn more
A 150 kVA service transformer has a 480Y/277 volt 3-phase primary and a 208Y/120 volt, 3-phase secondary. What is the approximate full-load ampere rating of the primary of the transformer? - ANSWER-180 amperes 
 
Where a conductor is marked RHW-2 on the insulation what does the "-2" represent? - ANSWER-The conductor has a maximum operating temperate of 90 degrees C. 
 
For a grounded electrical system supplied by a feeder or branch circuit, the equipment grounding conductor shall be sized in a...
And that's how you make extra money
-
Master Electrician (First Set 1-85) with Complete Solutions!
- Exam (elaborations) • 8 pages • 2024
- Available in package deal
-
- $11.99
- + learn more
A 150 kVA service transformer has a 480Y/277 volt 3-phase primary and a 208Y/120 volt, 3-phase secondary. What is the approximate full-load ampere rating of the primary of the transformer? - ANSWER-180 amperes 
 
Where a conductor is marked RHW-2 on the insulation what does the "-2" represent? - ANSWER-The conductor has a maximum operating temperate of 90 degrees C. 
 
For a grounded electrical system supplied by a feeder or branch circuit, the equipment grounding conductor shall be sized in a...
-
California C10 Electrical Exam Questions And Answers
- Exam (elaborations) • 3 pages • 2024
-
- $8.99
- + learn more
California C10 Electrical Exam Questions And Answers 
 
Min #receptacles in a garage - ANS 1 
 
Mobile home service equipment shall be line of sight and no more than ____ from the exterior wall of the home - ANS 30' 
 
If a service conductor is over 300V but less than 600V, what is the minimum clearance of that service conductor if it runs in residential and commercial areas that are not subject to traffic? - ANS 15' 
 
A power meter must be a minimum of ____ feet away from any door, ga...
-
California C10 Electrical Exam || with Accurate Answers 100%.
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $10.08
- + learn more
Min #receptacles in a garage correct answers 1 
 
Mobile home service equipment shall be line of sight and no more than ____ from the exterior wall of the home correct answers 30' 
 
If a service conductor is over 300V but less than 600V, what is the minimum clearance of that service conductor if it runs in residential and commercial areas that are not subject to traffic? correct answers 15' 
 
A power meter must be a minimum of ____ feet away from any door, gas meter, or window opening. corre...
-
System installation and inspection Final Exam Questions 100% Well Answered.
- Exam (elaborations) • 3 pages • 2024
-
Available in package deal
-
- $9.99
- + learn more
A solar panel installer uses a heavy rubber mallet to - Answer locate rafters 
 
The product that neutralizes lead acid battery electrolyte is - Answer baking soda 
 
If a standoff for a roof-mounted array needs to be mounted in an area between two wooden rafters, what can be added to the rafters to anchor the mount? - Answer Spans made of 2" x 6" boards 
 
Under standard test conditions, the array should be receiving full sun, which is how many watts per square meter of panel spa...
-
Master Electrician Q%A VERIFIED TEST | ALREADY PASSED
- Exam (elaborations) • 10 pages • 2023
-
Available in package deal
-
- $8.99
- + learn more
Master Electrician Q%A VERIFIED TEST | 
ALREADY PASSED 
Where a 90 ampere, 240-volt, single-phase load is located 225 feet from a 
panelboard and is supplied with size 3 AWG copper conductors, determine 
the approximate voltage drop on the conductors. (K = 12.9) - ANSWER 10 
volts 
Wiring methods associated with solar photovoltaic (PV) systems shall not 
be installed within _____ of the roof decking or sheathing except where 
directly below the roof surface covered by PV modules and associ...
Did you know that on average a seller on Stuvia earns $82 per month selling study resources? Hmm, hint, hint. Discover all about earning on Stuvia