Hic license - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Hic license? On this page you'll find 74 study documents about Hic license.

All 74 results

Sort by

NYC Home Improvement Exam Latest Update 2024 Actual Exam Popular
  • NYC Home Improvement Exam Latest Update 2024 Actual Exam

  • Exam (elaborations) • 9 pages • 2024
  • NYC Home Improvement Exam Latest Update 2024 Actual Exam NYC Home Improvement Exam DOB - ANSWER Department of Buildings DCA - ANSWER Department of Consumer Affairs DOT - ANSWER Department of Transportation What is home improvement? - ANSWER The construction,repair, replacement, remodleing, alteration, comversion, rehabilitation, renovation, modernization, improvement, or addition to any land or building or any part of the land or building used or designed to be used ...
    (0)
  • $14.09
  • 4x sold
  • + learn more
NYC Home Improvement Exam Questions and Answers Latest 2023-2024 (Graded 100%) Popular
  • NYC Home Improvement Exam Questions and Answers Latest 2023-2024 (Graded 100%)

  • Exam (elaborations) • 7 pages • 2023 Popular
  • NYC Home Improvement Exam Questions and Answers Latest (Graded 100%). DOB - ANSWER Department of Buildings DCA - ANSWER Department of Consumer Affairs DOT - ANSWER Department of Transportation What is home improvement? - ANSWER The construction,repair, replacement, remodleing, alteration, comversion, rehabilitation, renovation, modernization, improvement, or addition to any land or building or any part of the land or building used or designed to be used as a residence or dwelling place, i...
    (0)
  • $14.99
  • 2x sold
  • + learn more
VA HIC LICENSE EXAM PREP QUESTIONS AND ANSWERS
  • VA HIC LICENSE EXAM PREP QUESTIONS AND ANSWERS

  • Exam (elaborations) • 35 pages • 2024
  • VA HIC LICENSE EXAM PREP QUESTIONS AND ANSWERS
    (0)
  • $13.79
  • + learn more
VA HIC LICENSE EXAM PREP QUESTIONS WITH VERIFIED ANSWERS 2024-2025
  • VA HIC LICENSE EXAM PREP QUESTIONS WITH VERIFIED ANSWERS 2024-2025

  • Exam (elaborations) • 44 pages • 2024
  • VA HIC LICENSE EXAM PREP QUESTIONS WITH VERIFIED ANSWERS ...
    (0)
  • $12.49
  • + learn more
2024 VA HIC License Exam Prep
  • 2024 VA HIC License Exam Prep

  • Exam (elaborations) • 36 pages • 2024
  • 2024 VA HIC License Exam Prep Protruding objects may not protrude more than ___ inches into the path of travel. - ANS 4" ANSI Accessible and Usable Buildings and Facilities, 2017 Page 15 In new buildings, thresholds at doorways should be no higher than ______. - ANS 1/2" ANSI Accessible and Usable Buildings and Facilities, 2017 Page 30 In a Type A unit, if measuring to the highest part of the rim or highest part of the counter, what is the maximum h...
    (0)
  • $9.99
  • + learn more
MHIC License Exam with complete verified solutions 2025-2026
  • MHIC License Exam with complete verified solutions 2025-2026

  • Exam (elaborations) • 26 pages • 2024
  • MHIC License Exam with complete verified solutions
    (0)
  • $14.99
  • + learn more
2024 VA HIC License Exam Prep Questions and Answers | Latest Update
  • 2024 VA HIC License Exam Prep Questions and Answers | Latest Update

  • Exam (elaborations) • 93 pages • 2024
  • Available in package deal
  • Protruding objects may not protrude more than ___ inches into the path of travel. 4" ANSI Accessible and Usable Buildings and Facilities, 2017 Page 15 In new buildings, thresholds at doorways should be no higher than ______. 1/2" ANSI Accessible and Usable Buildings and Facilities, 2017 Page 30 In a Type A unit, if measuring to the highest part of the rim or highest part of the counter, what is the maximum height of the sink front above the floor? 34" ANSI Accessible and Usable...
    (0)
  • $13.49
  • + learn more
2024 VA HIC License Exam Prep Questions With Correct Answers Already Passed!!!
  • 2024 VA HIC License Exam Prep Questions With Correct Answers Already Passed!!!

  • Exam (elaborations) • 37 pages • 2024
  • 2024 VA HIC License Exam Prep Questions With Correct Answers Already Passed!!! Protruding objects may not protrude more than ___ inches into the path of travel. - correct answer...4" ANSI Accessible and Usable Buildings and Facilities, 2017 Page 15 In new buildings, thresholds at doorways should be no higher than ______. - correct answer...1/2" ANSI Accessible and Usable Buildings and Facilities, 2017 Page 30 In a Type A unit, if measuring to the highest part of the rim or hig...
    (0)
  • $10.49
  • + learn more
MHIC LICENSE EXAM Guaranteed A+ Guide
  • MHIC LICENSE EXAM Guaranteed A+ Guide

  • Exam (elaborations) • 37 pages • 2024
  • Available in package deal
  • Top reasons businesses fail (8 examples, two umbrella reasons) poor planning + inadequate management (poor sales, competitive weakness, high operating expenses, difficulty collecting invoices, inventory problems, too many fixed assets, poor location, fraud) What is an entrepreneur? individual engaged in strategic activities that begin & develop a business, created to build long-term value and steady cash flow What are the functions of a business plan (3)? Planning tool, loan/investor ...
    (0)
  • $13.49
  • + learn more
2024 VA HIC License Exam Prep Questions and Answers |100% Pass
  • 2024 VA HIC License Exam Prep Questions and Answers |100% Pass

  • Exam (elaborations) • 65 pages • 2024
  • Available in package deal
  • 2024 VA HIC License Exam Prep Questions and Answers |100% Pass Protruding objects may not protrude more than ___ inches into the path of travel. - Answer-4" ANSI Accessible and Usable Buildings and Facilities, 2017 Page 15 In new buildings, thresholds at doorways should be no higher than ______. - Answer-1/2" ANSI Accessible and Usable Buildings and Facilities, 2017 Page 30 In a Type A unit, if measuring to the highest part of the rim or highest part of the counter, what is the maximu...
    (0)
  • $12.49
  • + learn more