Icc ast Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Icc ast? On this page you'll find 87 study documents about Icc ast.

All 87 results

Sort by

WA UST Site Assessor Exam Questions With Complete Solutions | 100% Pass Popular
  • WA UST Site Assessor Exam Questions With Complete Solutions | 100% Pass

  • Exam (elaborations) • 7 pages • 2024
  • Available in package deal
  • What is the hold time for soil and preserved GW GRO samples? - 14 days Is an ICC certification needed to install an AST? - No Flammability limits of gasoline - 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? - 30 days MTCA Method A lead CUL, soil - 250 mg/kg MTCA Method A lead CUL, GW - 15 ug/L Is the vadose zone saturated or unsaturated? - Unsaturated List in order of most mobile to least mobile: Bunker C, heating oil, diesel, gasoli...
    (1)
  • $12.48
  • 1x sold
  • + learn more
ICC AST Installation/ Retrofitting Study Guide with complete solutions |Latest 2024/2025
  • ICC AST Installation/ Retrofitting Study Guide with complete solutions |Latest 2024/2025

  • Exam (elaborations) • 9 pages • 2024
  • Available in package deal
  • ICC AST Installation/ Retrofitting Study Guide with complete solutions |Latest 2024/2025
    (0)
  • $10.49
  • + learn more
ICC AST Installation-Retrofitting Exam Questions and Answers
  • ICC AST Installation-Retrofitting Exam Questions and Answers

  • Exam (elaborations) • 5 pages • 2024
  • ICC AST Installation-Retrofitting Exam Questions and Answers
    (0)
  • $10.49
  • + learn more
WA UST Site Assessor Exam
  • WA UST Site Assessor Exam

  • Exam (elaborations) • 6 pages • 2023
  • What is the hold time for soil and preserved GW GRO samples? - Answer- 14 days Is an ICC certification needed to install an AST? - Answer- No Flammability limits of gasoline - Answer- 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? - Answer- 30 days MTCA Method A lead CUL, soil - Answer- 250 mg/kg MTCA Method A lead CUL, GW - Answer- 15 ug/L Is the vadose zone saturated or unsaturated? - Answer- Unsaturated List in order ...
    (0)
  • $10.99
  • 1x sold
  • + learn more
ICC AST Installation/ Retrofitting exam 2023/2024 questions and answer
  • ICC AST Installation/ Retrofitting exam 2023/2024 questions and answer

  • Exam (elaborations) • 6 pages • 2023
  • ICC AST Installation/ Retrofitting exam 2023/2024 questions and answer
    (0)
  • $7.99
  • + learn more
ICC AST Installation- Retrofitting Questions and Answers Rated A+
  • ICC AST Installation- Retrofitting Questions and Answers Rated A+

  • Exam (elaborations) • 5 pages • 2024
  • ICC AST Installation- Retrofitting Questions and Answers Rated A+ to allow passage between tanks for inspection provide a minimum of? 1/6 of the sum of the adjacent tank diameters, but not less then 3 feet. pressure vacuum vents remain normally closed, only opened when the pressure inside the tank reaches? 2 through 16 ounces per square Inch or a vacuum of 0.5 through 1.0 ounces per square inch. the primary criterion for tank foundation design is the allowable bearing pressure o...
    (0)
  • $16.49
  • + learn more
WA UST Site Assessor Exam Questions and Answers 2023 with complete solution
  • WA UST Site Assessor Exam Questions and Answers 2023 with complete solution

  • Exam (elaborations) • 8 pages • 2023
  • Available in package deal
  • WA UST Site Assessor Exam Questions and Answers 2023 with complete solution What is the hold time for soil and preserved GW GRO samples? Ans 14 days Is an ICC certification needed to install an AST? Ans No Flammability limits of gasoline Ans 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? Ans 30 days MTCA Method A lead CUL, soil Ans 250 mg/kg MTCA Method A lead CUL, GW Ans 15 ug/L Is the vadose zone saturated or uns...
    (0)
  • $9.49
  • 1x sold
  • + learn more
 ICC AST Installation/ Retrofitting questions and answers well illustrated.
  • ICC AST Installation/ Retrofitting questions and answers well illustrated.

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • ICC AST Installation/ Retrofitting questions and answers well illustrated. to allow passage between tanks for inspection provide a minimum of? - correct answers.1/6 of the sum of the adjacent tank diameters, but not less then 3 feet. pressure vacuum vents remain normally closed, only opened when the pressure inside the tank reaches? - correct answers.2 through 16 ounces per square Inch or a vacuum of 0.5 through 1.0 ounces per square inch. the primary criterion for...
    (0)
  • $11.49
  • + learn more
WA UST Site Assessor Exam | 100% Correct Answers | Verified | Latest 2024 Version
  • WA UST Site Assessor Exam | 100% Correct Answers | Verified | Latest 2024 Version

  • Exam (elaborations) • 9 pages • 2024
  • What is the hold time for soil samples? - 14 days What is the hold time for preserved GW GRO samples? - 14 days What does GRO stand for? - Gasoline Range Organics Is an ICC certification needed to install an AST? - No What does ICC stand for? - International Code Council What is the LFL of Gasoline? - 1.4% What is the UFL of Gasoline? - 7.6%
    (0)
  • $8.99
  • + learn more
WA UST Site Assessor Exam Questions and Answers Graded A
  • WA UST Site Assessor Exam Questions and Answers Graded A

  • Exam (elaborations) • 12 pages • 2023
  • WA UST Site Assessor Exam Questions and Answers Graded A What is the hold time for soil and preserved GW GRO samples? 14 days Is an ICC certification needed to install an AST? No Flammability limits of gasoline 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? 30 days MTCA Method A lead CUL, soil 250 mg/kg MTCA Method A lead CUL, GW 15 ug/L Is the vadose zone saturated or unsaturated? Unsaturated List in order of most mobile to least mob...
    (0)
  • $9.99
  • 1x sold
  • + learn more