Module 6 nccer into - Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Module 6 nccer into? On this page you'll find 129 study documents about Module 6 nccer into.

All 129 results

Sort by

Latest | NCCER Module 6: Exam | Introduction to Construction Drawings Questions And Answers 2024 Popular
  • Latest | NCCER Module 6: Exam | Introduction to Construction Drawings Questions And Answers 2024

  • Exam (elaborations) • 4 pages • 2024
  • Latest | NCCER Module 6: Exam | Introduction to Construction Drawings Questions And Answers 2024 Most construction drawings today are​ hand-drawn by drafters. - Correct Answer False The border is a clear area of about​ _____ inch(es) around the edge of the drawing. - Correct Answer ½ Abbreviations used in drawings are always written in​ ____. - Correct Answer capital letters A keynote is used to identify a specific object in a drawing. - Correct Answer True A grid divides t...
    (0)
  • $9.48
  • 2x sold
  • + learn more
Module 2- NCCER Introduction to  Construction Math Test Questions And  Answers Popular
  • Module 2- NCCER Introduction to Construction Math Test Questions And Answers

  • Exam (elaborations) • 3 pages • 2024 Popular
  • Module 2- NCCER Introduction to Construction Math Test Questions And Answers 18/54 - ANSWER The equivalent fraction to 6/18 is 1/3 - ANSWER When 4/12 is reduced to the lowest terms what is the answer 6 1/6 - ANSWER 9.37/6 is an improper fraction that can be changed to what mixed number 5/8 - ANSWER Reduce your answer to the lowest term. 1/4 + 3/8 1/6 - ANSWER Reduce your answer to the lowest term. 8/12-4/8= 5/12 - ANSWER Reduce your answer to the l...
    (0)
  • $7.99
  • 2x sold
  • + learn more
Module 6 NCCER into to Basic rigging questions with correct answers
  • Module 6 NCCER into to Basic rigging questions with correct answers

  • Exam (elaborations) • 6 pages • 2023
  • During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal? CORRECT ANSWER (Anyone on the ground who is in sight of the crane operator). The recommendation when lifting a load longer then __________ is to use two choker hitches. CORRECT ANSWER (12 feet) A hand-operated winching device that should never be used for vertical overhead lifting is a (CORRECT ANSWER come-along All chain hoists use a ____________ to lift heavy loads. CORRECT...
    (2)
  • $7.99
  • 9x sold
  • + learn more
Module 6 NCCER into to Basic rigging|A+ Graded
  • Module 6 NCCER into to Basic rigging|A+ Graded

  • Exam (elaborations) • 5 pages • 2024
  • Module 6 NCCER into to Basic rigging|A+ Graded During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? (Anyone on the ground who is in sight of the craneoperator). The recommendation when lifting a load longer then __________ is to use two chokerhitches. (12 feet) A hand-operated winching device that should never be used for vertical overhead liftingis a ( come-along All chain hoists use a ____________ to lift heavy loads...
    (0)
  • $10.59
  • + learn more
Module 6 NCCER into to Basic rigging|A+ Graded
  • Module 6 NCCER into to Basic rigging|A+ Graded

  • Exam (elaborations) • 5 pages • 2024
  • Module 6 NCCER into to Basic rigging|A+ Graded d. manufacturer's name or trademark Identification tags for slings must include the ______. a. type of protective pads to use b. type of damage sustained during use c. color of the tattle-tail d. manufacturer's name or trademark a. fiber core The type of wire rope core that is susceptible to heat damage at relatively low temperatures is the ______. a. fiber core b. strand core c. independent wire rope core d. metallic link supp...
    (0)
  • $10.59
  • + learn more
Module 6 NCCER into to Basic rigging 2024 Complete Questions and Answers 100% Pass
  • Module 6 NCCER into to Basic rigging 2024 Complete Questions and Answers 100% Pass

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • Module 6 NCCER into to Basic rigging 2024 Complete Questions and Answers 100% Pass
    (0)
  • $12.49
  • + learn more
Module 6 NCCER into to Basic rigging-with 100% verified solutions
  • Module 6 NCCER into to Basic rigging-with 100% verified solutions

  • Exam (elaborations) • 9 pages • 2024
  • Module 6 NCCER into to Basic rigging-with 100% verified solutions
    (0)
  • $12.99
  • + learn more
Module 6 NCCER into to Basic rigging questions with verified correct answers
  • Module 6 NCCER into to Basic rigging questions with verified correct answers

  • Exam (elaborations) • 6 pages • 2024
  • Module 6 NCCER into to Basic rigging questions with verified correct answers 1. During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal?:Answer: (Anyone on the ground who is in sight of the crane operator). 2. The recommendation when lifting a load longer then____is to use two chokerhitches.:Answer: (12 feet) 3. A hand-operated winching device that should never be used for vertical overhead lifting is a (:Answer: come-along
    (0)
  • $6.39
  • + learn more
Module 6 NCCER into to Basic rigging|A+ Graded
  • Module 6 NCCER into to Basic rigging|A+ Graded

  • Exam (elaborations) • 5 pages • 2024
  • Module 6 NCCER into to Basic rigging|A+ Graded During a rigging operation if an emergency happens who has the authority to give theemergency stop hand signal? (Anyone on the ground who is in sight of the craneoperator). The recommendation when lifting a load longer then __________ is to use two chokerhitches. (12 feet) A hand-operated winching device that should never be used for vertical overhead liftingis a ( come-along All chain hoists use a ____________ to lift heavy loads...
    (0)
  • $10.00
  • + learn more
Module 6 NCCER into to Basic rigging Exam Questions And Answers
  • Module 6 NCCER into to Basic rigging Exam Questions And Answers

  • Exam (elaborations) • 4 pages • 2024
  • Available in package deal
  • Module 6 NCCER into to Basic rigging Exam Questions And Answers During a rigging operation if an emergency happens who has the authority to give the emergency stop hand signal? - ANS (Anyone on the ground who is in sight of the crane operator). The recommendation when lifting a load longer than __________ is to use two choker hitches. - ANS (12 feet) A hand-operated winching device that should never be used for vertical overhead lifting is a ( - ANS come-along All chain hoi...
    (0)
  • $8.49
  • + learn more
Module 6 NCCER into to Basic rigging|A+ Graded
  • Module 6 NCCER into to Basic rigging|A+ Graded

  • Exam (elaborations) • 5 pages • 2024
  • Module 6 NCCER into to Basic rigging|A+ Graded d. manufacturer's name or trademark Identification tags for slings must include the ______. a. type of protective pads to use b. type of damage sustained during use c. color of the tattle-tail d. manufacturer's name or trademark a. fiber core The type of wire rope core that is susceptible to heat damage at relatively low temperatures is the ______. a. fiber core b. strand core c. independent wire rope core d. metallic link supp...
    (0)
  • $10.00
  • + learn more