Nicet level 1 and level 2 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet level 1 and level 2? On this page you'll find 136 study documents about Nicet level 1 and level 2.

All 136 results

Sort by

Nicet Level 1 - Water Based Layout Practice Questions and Answers 100% Pass Popular
  • Nicet Level 1 - Water Based Layout Practice Questions and Answers 100% Pass

  • Exam (elaborations) • 19 pages • 2024
  • Available in package deal
  • Nicet Level 1 - Water Based Layout Practice Questions and Answers 100% Pass Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster. - Answer-1 2/2 in. (ref. NFPA 13 2016 Sec. 9.2.1.1.2. While conducting a flow test, the chosen hydrant should be ______ - Answer-As close to the property where the sprinkler system is being installed. (Ref, NFPA 13 Sec. A.24.2.2. or NFPA 291) What formula is ...
    (1)
  • $12.49
  • 3x sold
  • + learn more
NICET Inspect & Test LVL 2 Exam Questions and Answers Popular
  • NICET Inspect & Test LVL 2 Exam Questions and Answers

  • Exam (elaborations) • 7 pages • 2024 Popular
  • Available in package deal
  • NICET Inspect & Test LVL 2 Exam Questions and Answers While testing a fire alarm system at a correctional facility, it is determined that the general fire alarm signal requires human intervention to be initiated. This is permitted using a _____ feature? A. Pre signal B. Positive alarm sequence C. Manual initiation D. Alarm verification - Answer-A. Pre Signal NFPA 72 23.8.1.1.2(3)(a) Consider a 50′ x 50′ room with a 12′ ceiling. What is the minimum intensity required for a ceilin...
    (0)
  • $11.49
  • 1x sold
  • + learn more
NICET LEVEL 1 AND 2 HIGHWAY CONSTRUCTION  EXAMS WITH ACTUAL CORRECT QUESTIONS  AND VERIFIED DETAILED RATIONALES  ANSWERS LATEST 2024 [NEWEST] ALREADY  GRADED A+
  • NICET LEVEL 1 AND 2 HIGHWAY CONSTRUCTION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED RATIONALES ANSWERS LATEST 2024 [NEWEST] ALREADY GRADED A+

  • Exam (elaborations) • 56 pages • 2024
  • NICET LEVEL 1 AND 2 HIGHWAY CONSTRUCTION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED RATIONALES ANSWERS LATEST 2024 [NEWEST] ALREADY GRADED A+
    (1)
  • $20.49
  • 1x sold
  • + learn more
NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM 400 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) ALREADY GRADED A+
  • NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM 400 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) ALREADY GRADED A+

  • Exam (elaborations) • 131 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM 400 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) ALREADY GRADED A+
    (1)
  • $17.99
  • + learn more
NICET Fire Alarm Level 1 Questions and Answers Already Graded A
  • NICET Fire Alarm Level 1 Questions and Answers Already Graded A

  • Exam (elaborations) • 33 pages • 2023
  • NICET Fire Alarm Level 1 Questions and Answers Already Graded A When a device is inaccessible due to excessive height, such as an atrium, what it the maximum interval for testing? 18 months When installing a wall-mounted fire telephone appliance to the public, what is the acceptable maximum mounting height from the floor? 66 inches Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? 21 feet At minimum, when working near pow...
    (0)
  • $10.49
  • 2x sold
  • + learn more
NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM 380 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+
  • NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM 380 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+

  • Exam (elaborations) • 111 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM 380 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES (VERIFIED ANSWERS) |ALREADY GRADED A+
    (0)
  • $32.49
  • + learn more
NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION  NEWEST 2024 ACTUAL EXAM QUESTIONS AND  CORRECT DETAILED ANSWERS (VERIFIED ANSWERS)  |ALREADY GRADED A+
  • NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

  • Exam (elaborations) • 60 pages • 2024
  • NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+ NICET LEVEL 1 AND LEVEL 2 HIGHWAY CONSTRUCTION NEWEST 2024 ACTUAL EXAM QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+
    (1)
  • $24.29
  • + learn more
NICET Fire Alarm Level 1 Exam Questions And Revised Correct  Answers
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers

  • Exam (elaborations) • 14 pages • 2024
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? - ANSWER : 21 feet At minimum, when working near power lines with voltage of 600 volts and lower, an aerial lift operator shall maintain which distance from the lines? - ANSWER : 10 feet The use of unprotected EMT shall be permitted under which conditions? - ANSWER : when in direct contact with t...
    (0)
  • $11.34
  • 1x sold
  • + learn more
Nicet Level 1 - Water Based Layout Questions and Answers Graded A+
  • Nicet Level 1 - Water Based Layout Questions and Answers Graded A+

  • Exam (elaborations) • 26 pages • 2023
  • Nicet Level 1 - Water Based Layout Questions and Answers Graded A+ Toggle hangers shall be permitted only for the support of pipe __________ inches or smaller in size under ceilings of hollow tile or metal lath and plaster. 1 2/2 in. (ref. NFPA 13 2016 Sec. 9.2.1.1.2. While conducting a flow test, the chosen hydrant should be ______ As close to the property where the sprinkler system is being installed. (Ref, NFPA 13 Sec. A.24.2.2. or NFPA 291) What formula is used to determine the discharge ...
    (0)
  • $10.49
  • 1x sold
  • + learn more
Nicet Level 2: Concrete Exam Questions and Answers 2024
  • Nicet Level 2: Concrete Exam Questions and Answers 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Nicet Level 2: Concrete Exam Questions and Answers 2024 What is the testing frequency for concrete? - Answer-every 50 yards When should you take cylinder samples? - Answer-Every 100 yards What are the components on a batch ticket? - Answer-1. Ticket Number 2. Plant 3. Project Number 4. Mix ID 5. Time of Batch 6. Time arrival 7. Time Discharge 8. Time Completed 9. Mix proportions When should concrete samples should not be taken? - Answer-Before 10% and 90% of truck has been discharge...
    (0)
  • $11.49
  • 1x sold
  • + learn more